I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.
The frequency of cube casting and testing is determined by the project specifications and quality control requirements.
In general, cube casting and testing may be done at regular intervals during the construction process.
For example, in a large construction project, cube casting and testing may be d...
Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.
Rate analysis helps in estimating the total cost of a construction project.
It involves breaking down the project into various activities and determining the cost of each activity.
Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...
Sieve analysis & Sieve Size
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth in a different environment.
Desire for career advancement
Seeking new challenges
Opportunity for growth
Change in work environment
Acceptance criteria of cube includes dimensions, material, weight, and quality standards.
Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)
Material should be durable and suitable for intended use (e.g. plastic, wood, metal)
Weight should be within acceptable range based on material and size
Quality standards must be met in terms of finish, edges, and overall construction
Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.
Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.
For example, timber formwork may require longer stripping time compared to steel formwork.
In hot weather, concrete may set faster, reducing the stripping time.
Proper curing can also affec...
Code 1200 is not specifically for billing purposes.
Code 1200 is typically used in reference to a specific task or action, not billing.
It could be related to a specific product, service, or process within a company.
For example, code 1200 might indicate a specific troubleshooting step in a technical manual.
Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.
Manpower output for shuttering can range from 10-20 sqm per day depending on complexity
Steelwork output can vary from 50-100 kg per worker per day
Blockwork output can range from 50-100 blocks per worker per day
Plastering output can vary from 10-20 sqm per worker per day
Fact...
Top trending discussions
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
The rating of a transformer is in kVA and the current can be found using the formula: Current (A) = kVA / (1.732 x Voltage)
Transformer rating is in kVA (kilo-volt-ampere)
To find the current in a transformer, use the formula: Current (A) = kVA / (1.732 x Voltage)
For example, if a transformer has a rating of 100 kVA and operates at 480V, the current would be 100 / (1.732 x 480) = 120.7A
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
To cut a section of a building, create a vertical plane through the structure to reveal internal components and layout.
Identify the section location: Choose a specific area of the building to cut, such as a wall or floor.
Use architectural software: Tools like AutoCAD or Revit can help visualize and create accurate sections.
Define the cutting plane: Specify the height and angle of the cut to show relevant details.
Label ...
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
posted on 27 Mar 2021
I applied via Campus Placement and was interviewed in Sep 2020. There were 4 interview rounds.
based on 2 interview experiences
Difficulty level
Duration
based on 15 reviews
Rating in categories
Design Engineer
264
salaries
| ₹5 L/yr - ₹18 L/yr |
Senior Design Engineer
156
salaries
| ₹7.5 L/yr - ₹26 L/yr |
Piping Designer
98
salaries
| ₹3.7 L/yr - ₹15 L/yr |
Piping Design Engineer
92
salaries
| ₹4.7 L/yr - ₹15 L/yr |
Senior Engineer
78
salaries
| ₹9 L/yr - ₹21 L/yr |
L&T Construction
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation