P&ID is made by identifying process equipment and connecting them with pipes. Line sizing is done based on process requirements.
Identify process equipment and their connections
Determine process requirements such as flow rate and pressure drop
Select appropriate pipe size based on process requirements
Consider factors such as fluid properties, pipe material, and layout
Use software tools such as AutoCAD or SmartPlant P&ID ...
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
Top trending discussions
posted on 23 Apr 2020
I applied via Naukri.com and was interviewed in Oct 2019. There were 4 interview rounds.
posted on 17 Oct 2022
I applied via Approached by Company and was interviewed before Oct 2021. There were 3 interview rounds.
The paint RAL code and thickness applied on the fixture is recorded for quality control purposes.
The RAL code is a standardized color code system used in Europe.
The paint thickness is measured using a paint thickness gauge.
The recorded data is used to ensure consistency in the painting process and to meet customer specifications.
Example: RAL 9005 (Jet Black) with a paint thickness of 50 microns.
The clamps used on the fixture are made by various manufacturers.
The make of clamps used on the fixture may vary depending on the specific fixture and its requirements.
Some common manufacturers of clamps include Bessey, Irwin, and Jorgensen.
The type of clamp used may also vary, such as C-clamps, bar clamps, or spring clamps.
VSM graph is a tool used in Lean manufacturing to map out the current state of a process and identify areas for improvement.
VSM stands for Value Stream Mapping
It is used to visualize the flow of materials and information through a process
Helps identify waste and inefficiencies in the process
Can be used to plan and implement process improvements
Example: A VSM graph can be used to identify bottlenecks in a manufacturing ...
I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
Simple aptitude question s related to general maths identity and local technical questions
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.
DBM stands for Dense Bituminous Macadam, which is a type of road construction material.
The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.
The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.
Higher percentages of bitumen a...
I seek new challenges and opportunities for growth that align with my career goals and values.
Desire for professional growth: I want to work on more complex projects that challenge my skills.
Alignment with company values: I admire your company's commitment to innovation and sustainability.
Seeking a collaborative environment: I thrive in teams that encourage knowledge sharing and creativity.
Career advancement opportunit...
I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.
The cross section of bottom chord of open web girder varies depending on the design and load requirements.
The cross section can be rectangular, trapezoidal, or triangular in shape.
The size and shape of the bottom chord is determined by the span of the girder and the loads it will carry.
The material used for the bottom chord can also affect its cross section.
Examples of open web girder bottom chord cross sections includ...
based on 12 reviews
Rating in categories
Design Engineer
255
salaries
| ₹7.6 L/yr - ₹15 L/yr |
Senior Design Engineer
160
salaries
| ₹13 L/yr - ₹22.6 L/yr |
Lead Engineer
118
salaries
| ₹21.6 L/yr - ₹34 L/yr |
Piping Design Engineer
117
salaries
| ₹6.4 L/yr - ₹14.1 L/yr |
Piping Designer
100
salaries
| ₹5.2 L/yr - ₹14.3 L/yr |
L&T Construction
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation