Filter interviews by
Different types of windings in transformers include primary winding, secondary winding, and tertiary winding.
Primary winding: receives electrical power from the source
Secondary winding: delivers electrical power to the load
Tertiary winding: used in special transformers for specific applications
Auto-transformer winding: single winding used as both primary and secondary
Leakage winding: used to reduce leakage flux in...
Modulation is the process of varying a carrier signal's properties to transmit information.
Modulation involves changing one or more properties of a high-frequency periodic waveform, called the carrier signal, in proportion to a signal to be transmitted.
Common types of modulation include Amplitude Modulation (AM), Frequency Modulation (FM), and Phase Modulation (PM).
Modulation allows for the efficient transmission ...
Different types of losses in a transformer include copper losses, iron losses, and stray losses.
Copper losses: Also known as I^2R losses, occur in the windings due to resistance.
Iron losses: Also known as core losses, occur in the core due to hysteresis and eddy currents.
Stray losses: Occur due to leakage flux and imperfect magnetic coupling.
Eddy current losses: Occur in the core due to circulating currents induce...
The output of sprint backlog is a list of tasks to be completed during the sprint.
List of user stories and tasks to be completed
Estimated effort for each task
Priority order of tasks
Progress tracking against the sprint goal
The project planning and execution went well, resulting in meeting deadlines and achieving project goals.
Effective communication among team members
Proper allocation of resources
Regular monitoring and tracking of progress
Adaptability to changes in project requirements
Yes, I am familiar with various quality systems that ensure product and process excellence.
ISO 9001: A widely recognized standard for quality management systems, focusing on customer satisfaction and continuous improvement.
Six Sigma: A data-driven approach aimed at reducing defects and improving processes, often using DMAIC (Define, Measure, Analyze, Improve, Control) methodology.
Total Quality Management (TQM): A ...
GDNT stands for Geometric Dimensioning and Tolerancing, a system for defining engineering tolerances.
GDNT provides a clear and concise way to communicate design intent.
It uses symbols to define the allowable variation in part features.
For example, a flatness tolerance specifies how flat a surface must be.
GDNT helps in reducing manufacturing costs by allowing for acceptable variations.
It is crucial in industries li...
Min by 5s means finding the minimum value among a set of numbers that are multiples of 5.
Identify all the numbers that are multiples of 5 in the given set.
Compare these numbers to find the smallest value.
The smallest number among the multiples of 5 is the min by 5s.
Cumpani rul is a term used in production engineering to refer to company rules and regulations.
Cumpani rul are guidelines set by the company to ensure smooth operations.
These rules may include safety protocols, quality standards, and production processes.
Employees are expected to adhere to cumpani rul to maintain efficiency and consistency in production.
Failure to follow cumpani rul may result in disciplinary acti...
BS4 stands for Bharat Stage 4, a set of emission standards implemented in automobiles to regulate air pollution.
BS4 stands for Bharat Stage 4, which is an emission standard set by the Indian government to regulate the amount of pollutants released by vehicles.
It is implemented in automobiles to reduce harmful emissions such as carbon monoxide, hydrocarbons, nitrogen oxides, and particulate matter.
BS4 compliant veh...
I appeared for an interview in Jul 2025, where I was asked the following questions.
I am involved in analyzing financial statements, assessing credit risk, and making recommendations for loan approvals.
Analyzing financial statements to evaluate creditworthiness of potential borrowers
Assessing credit risk by reviewing credit reports and conducting financial analysis
Making recommendations for loan approvals based on credit analysis findings
I prioritize tasks based on deadlines and importance, delegate when possible, and utilize time management techniques.
Prioritize tasks based on deadlines and importance
Delegate tasks when possible to team members
Utilize time management techniques such as creating to-do lists and setting reminders
Break down large tasks into smaller, manageable chunks
My salary expectations are in line with industry standards and commensurate with my experience and qualifications.
Research industry standards for Credit Analyst salaries
Consider my experience and qualifications when determining salary expectations
Be prepared to negotiate based on the overall compensation package offered
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 3 interview rounds.
I appeared for an interview in Jan 2025.
I appeared for an interview in Jan 2025.
My project experience includes designing and implementing complex systems for various industries.
Designed and implemented a real-time monitoring system for a manufacturing plant
Led a team in developing a new software application for financial analysis
Optimized database performance for a large e-commerce website
Implemented machine learning algorithms for predictive maintenance in the automotive industry
Optimizing joins involves using indexes, reducing unnecessary columns, and using appropriate join types.
Use indexes on columns used in join conditions to speed up the process.
Avoid selecting unnecessary columns in the result set to reduce data transfer.
Consider using appropriate join types like INNER JOIN, LEFT JOIN, or RIGHT JOIN based on the data relationships.
Join strategies are methods used to combine data from multiple tables in a database.
Common join strategies include inner join, outer join, left join, and right join.
Inner join returns only the rows that have matching values in both tables.
Outer join returns all rows from both tables and fills in NULL values for non-matching rows.
Left join returns all rows from the left table and the matched rows from the right table.
Ri...
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Production policy outlines the guidelines and strategies for managing production processes and resources effectively.
Defines production goals and objectives, such as increasing efficiency or reducing costs.
Involves decisions on production methods, such as make-to-order vs. make-to-stock.
Includes inventory management strategies to balance supply and demand.
Considers resource allocation, including labor, materials, and m...
Kaizen is a continuous improvement philosophy, while 5S is a workplace organization method to enhance efficiency and safety.
Kaizen focuses on small, incremental changes for continuous improvement in processes.
5S stands for Sort, Set in order, Shine, Standardize, and Sustain, aimed at organizing the workplace.
Example of Kaizen: A team regularly meets to discuss minor changes that can improve production efficiency.
Exampl...
I appeared for an interview in Jun 2025, where I was asked the following questions.
PPAP stands for Production Part Approval Process, ensuring quality in manufacturing through documentation and validation.
PPAP is used primarily in the automotive industry to ensure parts meet specifications.
It involves submitting samples and documentation to verify that the manufacturing process is capable of producing parts consistently.
Key elements include design records, engineering change documents, and process flo...
APQP is a structured approach to product quality planning, ensuring customer satisfaction and product reliability.
APQP is a framework used primarily in the automotive industry to ensure quality in product development.
It involves cross-functional teams working together to identify and mitigate risks early in the product lifecycle.
Key phases include planning, product design, process design, product and process validation...
Top trending discussions
Some of the top questions asked at the John Deere interview -
The duration of John Deere interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 229 interview experiences
Difficulty level
Duration
based on 3.7k reviews
Rating in categories
Senior Engineer
1.1k
salaries
| ₹12.3 L/yr - ₹20.9 L/yr |
Lead Engineer
786
salaries
| ₹18.4 L/yr - ₹33 L/yr |
Technical Trainee
588
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Senior Software Engineer
471
salaries
| ₹13.9 L/yr - ₹24 L/yr |
Assistant Technician
330
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Cummins
ABB
Tractors and Farm Equipment
CNH ( Case New Holland)