i
K Raheja
Corp
Filter interviews by
I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.
I have over 10 years of experience in managing and executing full MEP processes across various projects.
Led MEP coordination for a 500,000 sq. ft. commercial complex, ensuring timely completion.
Managed a team of engineers and technicians to streamline MEP workflows, reducing project delays by 15%.
Implemented energy-efficient systems in multiple healthcare facilities, enhancing sustainability.
Conducted regular site insp...
Top trending discussions
Electrical load calculations determine the power requirements for a project, ensuring adequate supply and safety.
Load calculations assess the total electrical demand of a building or system.
They consider various factors like lighting, HVAC, and equipment.
Example: A commercial kitchen may require specific calculations for ovens and refrigerators.
Load types include continuous, non-continuous, and demand loads.
Accurate ca...
Fapa panels typically have multiple loops, each capable of connecting various devices for effective monitoring and control.
Loop Count: A Fapa panel usually has multiple loops, often ranging from 2 to 8, depending on the model and configuration.
Device Capacity: Each loop can typically support 20 to 30 devices, such as smoke detectors, heat detectors, and manual call points.
Example: If a Fapa panel has 4 loops, it can co...
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
Yes, I am open to a one-year contract as it aligns with my career goals and allows for focused contributions.
A one-year contract provides a clear timeframe for project completion, allowing for targeted efforts.
It offers an opportunity to assess the company's culture and my fit within the team.
I can bring my expertise in MEP management to deliver impactful results within that period.
This arrangement allows for flexibili...
I applied via Referral and was interviewed before Sep 2023. There were 2 interview rounds.
I have worked on STP technologies such as BIM 360, Navisworks, and Revit for MEP coordination.
Utilized BIM 360 for cloud-based collaboration and coordination
Used Navisworks for clash detection and coordination meetings
Created 3D models and coordinated MEP systems in Revit
Implemented clash detection reports to resolve conflicts efficiently
I applied via Referral
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
Erection of fire lines involves establishing safety measures to prevent fire spread and ensure compliance with regulations.
Fire lines should be established according to local building codes and fire safety regulations.
Regular inspections and maintenance of fire lines are crucial to ensure their effectiveness.
Examples of fire lines include clear zones around buildings and the use of fire-resistant materials.
Training sta...
I applied via Naukri.com and was interviewed before Oct 2021. There were 2 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
posted on 27 Mar 2024
posted on 11 Feb 2025
I appeared for an interview before Feb 2024.
Knowledge in design and construction
About high residential and commercial building
based on 1 interview experience
Difficulty level
Duration
based on 5 reviews
Rating in categories
Assistant Manager
217
salaries
| ₹9.2 L/yr - ₹15.5 L/yr |
Manager
137
salaries
| ₹11.9 L/yr - ₹20.4 L/yr |
Senior Manager
62
salaries
| ₹17 L/yr - ₹30 L/yr |
Senior Officer
57
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Assistant General Manager
56
salaries
| ₹26 L/yr - ₹43 L/yr |
JLL
CBRE
NoBroker
Lodha Group