i
L&T
Realty
Filter interviews by
Tiling work involves preparation, layout, installation, grouting, and finishing for a durable and aesthetic surface.
1. Surface Preparation: Ensure the substrate is clean, dry, and level. For example, use a leveling compound for uneven floors.
2. Layout Planning: Mark guidelines on the surface to ensure tiles are laid out evenly. Use a chalk line for straight lines.
3. Tile Cutting: Use a tile cutter or wet saw to cu...
Fitting out a flat involves planning, sourcing materials, and coordinating trades to meet customer specifications.
Initial consultation with the customer to understand their needs and preferences.
Creating a detailed design plan that includes layout, materials, and finishes.
Sourcing materials such as flooring, cabinetry, and fixtures based on the design plan.
Coordinating with various tradespeople, including electric...
We implement various engineering controls to enhance safety and prevent incidents at our site.
Safety interlocks on machinery to prevent accidental operation.
Emergency shut-off systems for quick response during hazardous situations.
Ventilation systems to control exposure to harmful fumes or dust.
Regular maintenance and inspections of equipment to ensure proper functioning.
Use of barriers and guards to protect worke...
EHS challenges include compliance, training, and incident reporting, impacting safety and operational efficiency.
Compliance with regulations: Keeping up with changing EHS regulations can be challenging, leading to potential fines.
Training gaps: Ensuring all employees are adequately trained on EHS protocols is crucial; for example, new hires may lack necessary safety training.
Incident reporting: Streamlining the in...
I have executed various finishes including matte, glossy, textured, and metallic finishes.
Matte finish: smooth and non-reflective
Glossy finish: shiny and reflective
Textured finish: rough or patterned surface
Metallic finish: shiny and metallic appearance
I will manage a Design Build Project by creating a detailed project plan, coordinating with stakeholders, monitoring progress, and ensuring quality control.
Develop a comprehensive project plan outlining timelines, milestones, and deliverables
Collaborate with architects, engineers, contractors, and other stakeholders to ensure alignment on project goals and requirements
Regularly monitor progress and address any iss...
The process for obtaining environmental clearance for high-rise buildings involves several regulatory steps and assessments.
1. Project Proposal Submission: Developers must submit a detailed project proposal to the relevant environmental authority.
2. Initial Environmental Examination (IEE): An IEE is conducted to assess potential environmental impacts.
3. Environmental Impact Assessment (EIA): If significant impacts...
There are various types of plumbing systems, including water supply, drainage, vent, and gas piping.
Water supply plumbing systems provide clean water to homes and buildings.
Drainage plumbing systems remove wastewater and sewage from homes and buildings.
Vent plumbing systems allow air to enter and exit the plumbing system to prevent pressure buildup.
Gas piping plumbing systems provide gas for heating and cooking pu...
The sequence for installation of elevators involves several steps.
First, the elevator shaft is constructed.
Next, the elevator car and its components are installed.
Then, the elevator doors and hoistway doors are installed.
After that, the elevator control system is installed and tested.
Finally, the elevator is inspected and certified for use.
Plumbing system is a network of pipes, valves, and fixtures that carry water and waste to and from a building.
Plumbing systems are essential for providing clean water and removing waste from buildings.
They consist of pipes, valves, and fixtures such as sinks, toilets, and showers.
Water is supplied to the building through a main water line and distributed through smaller pipes.
Waste is removed through a drain syste...
I appeared for an interview before Jun 2024, where I was asked the following questions.
EHS challenges include compliance, training, and incident reporting, impacting safety and operational efficiency.
Compliance with regulations: Keeping up with changing EHS regulations can be challenging, leading to potential fines.
Training gaps: Ensuring all employees are adequately trained on EHS protocols is crucial; for example, new hires may lack necessary safety training.
Incident reporting: Streamlining the inciden...
We implement various engineering controls to enhance safety and prevent incidents at our site.
Safety interlocks on machinery to prevent accidental operation.
Emergency shut-off systems for quick response during hazardous situations.
Ventilation systems to control exposure to harmful fumes or dust.
Regular maintenance and inspections of equipment to ensure proper functioning.
Use of barriers and guards to protect workers fr...
The process for obtaining environmental clearance for high-rise buildings involves several regulatory steps and assessments.
1. Project Proposal Submission: Developers must submit a detailed project proposal to the relevant environmental authority.
2. Initial Environmental Examination (IEE): An IEE is conducted to assess potential environmental impacts.
3. Environmental Impact Assessment (EIA): If significant impacts are ...
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
Aluform Day wise process involves the daily operations and tasks carried out at Aluform.
Aluform Day wise process includes scheduling production, quality control checks, inventory management, and staff supervision.
Each day starts with a production meeting to discuss goals and priorities.
Quality control checks are conducted throughout the day to ensure products meet standards.
Inventory management involves tracking raw ma...
I appeared for an interview before Jun 2024, where I was asked the following questions.
Tiling work involves preparation, layout, installation, grouting, and finishing for a durable and aesthetic surface.
1. Surface Preparation: Ensure the substrate is clean, dry, and level. For example, use a leveling compound for uneven floors.
2. Layout Planning: Mark guidelines on the surface to ensure tiles are laid out evenly. Use a chalk line for straight lines.
3. Tile Cutting: Use a tile cutter or wet saw to cut til...
Marble is a metamorphic rock with various types, each differing in color, pattern, and origin, used in construction and art.
Carrara Marble: White or blue-grey, from Italy, famous for sculptures and buildings.
Calacatta Marble: Rare, luxurious white marble with bold veining, also from Italy.
Emperador Marble: Dark brown with lighter veins, originating from Spain, used in flooring.
Crema Marfil: Light beige marble from Spai...
Fitting out a flat involves planning, sourcing materials, and coordinating trades to meet customer specifications.
Initial consultation with the customer to understand their needs and preferences.
Creating a detailed design plan that includes layout, materials, and finishes.
Sourcing materials such as flooring, cabinetry, and fixtures based on the design plan.
Coordinating with various tradespeople, including electricians,...
I appeared for an interview before Jan 2024.
Current challenges in EHS management
Compliance with constantly changing regulations
Ensuring employee safety in high-risk environments
Managing environmental impact and sustainability initiatives
Implementing effective training programs for EHS practices
Balancing cost-effective solutions with EHS requirements
I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.
Contracts can be classified into various types based on their nature and purpose.
Contracts can be classified based on their enforceability - valid, void, voidable, and unenforceable.
They can also be classified based on their formation - express, implied, and quasi-contract.
Contracts can be classified based on their performance - executed and executory contracts.
Other types of contracts include unilateral, bilateral, al...
FIDIC is an international standard for construction contracts. There are different types of FIDIC contracts for different purposes.
FIDIC stands for International Federation of Consulting Engineers
FIDIC contracts are widely used in the construction industry worldwide
Different types of FIDIC contracts include Red Book, Yellow Book, Silver Book, and Green Book
Red Book is used for construction projects where the employer i...
Basic Rate is the minimum hourly wage paid to an employee for their work.
Basic Rate is the minimum hourly wage paid to an employee for their work.
It is determined by considering factors such as the employee's job role, experience, and industry standards.
Other items to be considered for Basic Rate include the cost of living, minimum wage laws, and collective bargaining agreements.
For example, a restaurant may have a Bas...
I seek new challenges and opportunities for growth that align with my career goals and aspirations.
Desire for professional growth: I want to take on more responsibilities and lead larger projects.
Alignment with career goals: The new role aligns better with my long-term career aspirations in management.
Seeking a dynamic environment: I'm looking for a workplace that fosters innovation and collaboration.
Desire for new cha...
I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.
I have executed various finishes including matte, glossy, textured, and metallic finishes.
Matte finish: smooth and non-reflective
Glossy finish: shiny and reflective
Textured finish: rough or patterned surface
Metallic finish: shiny and metallic appearance
Handle contractor work delays by communicating effectively, setting clear expectations, and implementing consequences for repeated delays.
Communicate with the contractor to understand the reasons for the delay
Set clear deadlines and expectations from the beginning of the project
Implement consequences for repeated delays, such as financial penalties or termination of the contract
Work with the contractor to create a plan...
I will manage a Design Build Project by creating a detailed project plan, coordinating with stakeholders, monitoring progress, and ensuring quality control.
Develop a comprehensive project plan outlining timelines, milestones, and deliverables
Collaborate with architects, engineers, contractors, and other stakeholders to ensure alignment on project goals and requirements
Regularly monitor progress and address any issues o...
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
None of the above, Please process
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
Plumbing system is a network of pipes, valves, and fixtures that carry water and waste to and from a building.
Plumbing systems are essential for providing clean water and removing waste from buildings.
They consist of pipes, valves, and fixtures such as sinks, toilets, and showers.
Water is supplied to the building through a main water line and distributed through smaller pipes.
Waste is removed through a drain system tha...
The sequence of plumbing works in a toilet starts with rough-in plumbing, followed by installation of drain and vent pipes, water supply lines, and finally fixtures.
Rough-in plumbing involves installing the drain and vent pipes in the walls and floors.
Next, water supply lines are installed, which connect to the main water supply and run to the toilet tank and sink.
Finally, fixtures such as the toilet bowl, tank, and si...
There are various types of pumps used in MEP systems, including centrifugal, positive displacement, and axial flow pumps.
Centrifugal pumps are commonly used in HVAC systems and move fluid by converting rotational kinetic energy to hydrodynamic energy.
Positive displacement pumps move fluid by trapping a fixed amount of fluid and forcing it into the discharge pipe.
Axial flow pumps are used for high flow and low head appl...
The sequence for installation of elevators involves several steps.
First, the elevator shaft is constructed.
Next, the elevator car and its components are installed.
Then, the elevator doors and hoistway doors are installed.
After that, the elevator control system is installed and tested.
Finally, the elevator is inspected and certified for use.
The pressure requirement for CP depends on the specific application and system design.
CP stands for cathodic protection, which is used to prevent corrosion in metal structures.
The pressure requirement can vary depending on factors such as the type of metal being protected, the environment, and the current density.
For example, a pipeline in a coastal area may require a higher pressure than a storage tank in a dry climat...
Top trending discussions
based on 11 interview experiences
Difficulty level
Duration
based on 241 reviews
Rating in categories
Assistant Manager
169
salaries
| ₹8.5 L/yr - ₹15 L/yr |
Senior Engineer
64
salaries
| ₹5.8 L/yr - ₹7.6 L/yr |
Manager
39
salaries
| ₹12.7 L/yr - ₹22 L/yr |
Senior Manager
27
salaries
| ₹16.6 L/yr - ₹27 L/yr |
Deputy General Manager
20
salaries
| ₹24.5 L/yr - ₹39 L/yr |
Omaxe
Mahindra Lifespace Developers
Realty Assistant
Runwal Group