Premium Employer

i

This company page is being actively managed by L. N. Malviya Infra Projects Group Team. If you also belong to the team, you can get access from here

Filter interviews by

L. N. Malviya Infra Projects Group Assistant Bridge Engineer Interview Questions and Answers

Updated 6 Apr 2024

L. N. Malviya Infra Projects Group Assistant Bridge Engineer Interview Experiences

2 interviews found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What are load action on bridge?

I applied via Referral and was interviewed in Sep 2021. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. 1.What is the difference between major and minor bridges?
  • Ans. 

    Major bridges are larger and carry more traffic than minor bridges.

    • Major bridges are typically longer and wider than minor bridges.

    • Major bridges are designed to carry heavy loads and high volumes of traffic.

    • Minor bridges are usually shorter and narrower, and they carry lighter loads and lower volumes of traffic.

    • Major bridges often span large bodies of water or deep valleys, while minor bridges may span small streams or...

  • Answered by AI
  • Q2. What is the Minimum socket length for end bearing pile?
  • Ans. 

    The minimum socket length for end bearing pile depends on the soil conditions and load requirements.

    • The socket length should be sufficient to transfer the load from the pile to the competent stratum below.

    • It is determined based on the soil investigation report and design calculations.

    • In cohesive soils, the socket length is typically 1.5 to 2 times the diameter of the pile.

    • In non-cohesive soils, the socket length may va...

  • Answered by AI
  • Q3. What do you mean by post tensioning and pre tensioning, in PSC girders?
  • Ans. Pre tensioning means apply the load on cables before concreting, and after concreting is called post tensioning.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - What u have experienced in work location, u have explain neatly in your own way and comfortable langauge. Before your interview once u recall the what u did in past days, and had solved difficulties in working time. Then u become a get confidence to crack the technical round easily.

Assistant Bridge Engineer Interview Questions Asked at Other Companies

Q1. Which type of pile in your major bridge, methodology of piling?
Q2. What do you mean by post-tensioning and pre-tensioning in PSC gir ... read more
Q3. What is the difference between major and minor bridges?
Q4. What is the minimum socket length for an end-bearing pile?
Q5. In pile construction, what is the use of bentonite, and what shou ... read more

Top trending discussions

View All
Interview Hub
6d
a client servicing executive
FeedCard Image
Got a question about L. N. Malviya Infra Projects Group?
Ask anonymously on communities.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Related to previous projects work

I applied via Company Website and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. About PSC GIRDER, stressing, grouting, erection
  • Q2. About Pile foundation and their types. End bearing and frictional piles. Bentonite field test
  • Q3. About closure portion methodologies
  • Q4. Bearings and expansion joints
  • Q5. Relevant codes

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm and answer point wise politely.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. What is pile foundation
  • Q2. Code of bbs
  • Ans. 

    The Code of BBS (Building Bridge Standards) outlines design and safety regulations for bridge engineering.

    • BBS ensures structural integrity and safety in bridge design.

    • It includes guidelines for materials, load factors, and environmental considerations.

    • Example: BBS may specify the use of high-strength concrete for durability.

    • BBS also addresses inspection and maintenance protocols to prolong bridge lifespan.

  • Answered by AI
  • Q3. Grade of cement
  • Ans. 

    Cement grades indicate the strength and quality of cement used in construction, influencing durability and load-bearing capacity.

    • Cement grades are classified based on their compressive strength, measured in megapascals (MPa).

    • Common grades include 33, 43, and 53, with 53 being the highest strength cement.

    • Grade 33 is suitable for low-strength structures like residential buildings.

    • Grade 43 is often used for medium-strengt...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good this type of job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Availability for project.
  • Ans. 

    I am available for the project and can commit to the required time and effort.

    • I am currently not committed to any other projects

    • I have the necessary skills and experience to contribute effectively

    • I am willing to adjust my schedule if needed for the project

    • I am excited about the opportunity to work on this project

  • Answered by AI
Round 3 - One-on-one 

(3 Questions)

  • Q1. Components of Bridges.
  • Ans. 

    Components of bridges include abutments, piers, deck, superstructure, substructure, and foundation.

    • Abutments provide support at the ends of a bridge.

    • Piers support the bridge deck in the middle.

    • Deck is the surface that vehicles travel on.

    • Superstructure includes beams, girders, and trusses.

    • Substructure supports the superstructure and transfers loads to the foundation.

    • Foundation transfers the bridge loads to the ground.

    • Ex...

  • Answered by AI
  • Q2. Types of Bearings.
  • Ans. 

    Bearings are structural components used to support and facilitate movement between two structural elements.

    • Types include roller bearings, ball bearings, plain bearings, and fluid bearings.

    • Roller bearings use cylindrical rollers to support heavy loads.

    • Ball bearings use balls to reduce friction between two surfaces.

    • Plain bearings have a sliding surface with no rolling elements.

    • Fluid bearings use a thin layer of liquid or...

  • Answered by AI
  • Q3. Span arrangement of Major Bridge you executed.
  • Ans. 

    The major bridge I executed had a continuous span arrangement with multiple spans.

    • The major bridge had a continuous span arrangement with multiple spans

    • The span arrangement was designed to accommodate the required length and load capacity

    • The spans were connected seamlessly to ensure structural integrity and stability

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest what you knows.
Be interview-ready. Browse the most asked HR questions.
illustration image
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Many technical questions was asked regarding JJM Project
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Is codes and qc knowledge quality regarding question
Round 2 - Technical 

(1 Question)

  • Q1. Is codes and technical works details
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. RCC & Steel design related questions.
Round 3 - HR 

(1 Question)

  • Q1. CTC RELATED . Tall me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - It a good organisation .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. EHS Defination with explanation
  • Ans. 

    EHS stands for Environment, Health, and Safety. It refers to the laws, rules, standards, and programs that are designed to protect the health and safety of employees and the public as well as the environment.

    • EHS involves identifying and assessing risks in the workplace related to health, safety, and the environment.

    • It includes implementing measures to control and mitigate these risks, such as providing proper training,...

  • Answered by AI
  • Q2. BOCW Act with Factory Act

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

L. N. Malviya Infra Projects Group Interview FAQs

How many rounds are there in L. N. Malviya Infra Projects Group Assistant Bridge Engineer interview?
L. N. Malviya Infra Projects Group interview process usually has 1 rounds. The most common rounds in the L. N. Malviya Infra Projects Group interview process are Technical.
What are the top questions asked in L. N. Malviya Infra Projects Group Assistant Bridge Engineer interview?

Some of the top questions asked at the L. N. Malviya Infra Projects Group Assistant Bridge Engineer interview -

  1. What do you mean by post tensioning and pre tensioning, in PSC girde...read more
  2. 1.What is the difference between major and minor bridg...read more
  3. What is the Minimum socket length for end bearing pi...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3/5

based on 1 interview experience

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more
Join L. N. Malviya Infra Projects Group 17 years of experiences in Infrastructure Consultancy.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 129 Interviews
Apco Infratech Interview Questions
3.7
 • 125 Interviews
Bechtel Interview Questions
3.9
 • 71 Interviews
Samsung E&A Interview Questions
3.9
 • 67 Interviews
Wood Group Interview Questions
3.7
 • 63 Interviews
Psp Projects Interview Questions
3.8
 • 62 Interviews
View all
L. N. Malviya Infra Projects Group Assistant Bridge Engineer Salary
based on 45 salaries
₹3.5 L/yr - ₹7.8 L/yr
6% more than the average Assistant Bridge Engineer Salary in India
View more details

L. N. Malviya Infra Projects Group Assistant Bridge Engineer Reviews and Ratings

based on 15 reviews

2.8/5

Rating in categories

2.4

Skill development

3.0

Work-life balance

2.0

Salary

3.0

Job security

2.5

Company culture

1.8

Promotions

2.6

Work satisfaction

Explore 15 Reviews and Ratings
Field Engineer
81 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Assistant Highway Engineer
53 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Assistant Bridge Engineer
45 salaries
unlock blur

₹3.5 L/yr - ₹7.8 L/yr

Road Engineer
33 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Assistant Quality Material Engineer
27 salaries
unlock blur

₹3 L/yr - ₹5.5 L/yr

Explore more salaries
Compare L. N. Malviya Infra Projects Group with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview