i
Filter interviews by
The question is unclear and incomplete. Please provide more information.
Please clarify the question.
Provide more context about the bridge and its alignment.
Are you asking about the alignment of piers in a specific type of bridge?
Without more information, it is impossible to answer this question.
The quantity of concrete consumed for one footing depends on the size and depth of the footing.
The size and depth of the footing determine the volume of concrete needed.
The type of soil and load capacity also affect the quantity of concrete.
A typical residential footing may require 0.5 to 1 cubic yard of concrete.
A larger commercial footing may require several cubic yards of concrete.
Metal and sand cement are valuable materials in bridge engineering.
Metal is used for structural support and reinforcement in bridges.
Sand cement is used as a binding agent in concrete for bridge construction.
Metal and sand cement work together to create strong and durable bridges.
Metal can also be used for bridge decking and railing.
Sand cement can be mixed with other materials to create different types of concret...
The difficulties of the base of pier can be addressed through proper design and construction techniques.
Conduct thorough soil investigation to determine the soil type and bearing capacity
Design the foundation based on the soil investigation results
Use appropriate construction techniques such as pile driving or excavation
Regularly monitor and maintain the pier foundation to ensure stability
Consider using innovative...
Head square of a bridge is used to support the weight of the bridge deck and transfer it to the piers.
Head square is a reinforced concrete beam that connects the bridge deck to the piers.
It helps to distribute the weight of the bridge deck evenly to the piers.
The placing method of concrete slab and pier depends on the design of the bridge and the site conditions.
The concrete slab is usually cast in place on top of...
The question is unclear and incomplete. Please provide more information.
Please clarify the question.
Provide more context about the bridge and its alignment.
Are you asking about the alignment of piers in a specific type of bridge?
Without more information, it is impossible to answer this question.
Head square of a bridge is used to support the weight of the bridge deck and transfer it to the piers.
Head square is a reinforced concrete beam that connects the bridge deck to the piers.
It helps to distribute the weight of the bridge deck evenly to the piers.
The placing method of concrete slab and pier depends on the design of the bridge and the site conditions.
The concrete slab is usually cast in place on top of the ...
The quantity of concrete consumed for one footing depends on the size and depth of the footing.
The size and depth of the footing determine the volume of concrete needed.
The type of soil and load capacity also affect the quantity of concrete.
A typical residential footing may require 0.5 to 1 cubic yard of concrete.
A larger commercial footing may require several cubic yards of concrete.
Metal and sand cement are valuable materials in bridge engineering.
Metal is used for structural support and reinforcement in bridges.
Sand cement is used as a binding agent in concrete for bridge construction.
Metal and sand cement work together to create strong and durable bridges.
Metal can also be used for bridge decking and railing.
Sand cement can be mixed with other materials to create different types of concrete for...
The difficulties of the base of pier can be addressed through proper design and construction techniques.
Conduct thorough soil investigation to determine the soil type and bearing capacity
Design the foundation based on the soil investigation results
Use appropriate construction techniques such as pile driving or excavation
Regularly monitor and maintain the pier foundation to ensure stability
Consider using innovative solu...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,...
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app...
Salary and job responsibilities
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I appeared for an interview before Apr 2024, where I was asked the following questions.
posted on 31 Jan 2024
About site experience
Some of the top questions asked at the L. N. Malviya Infra Projects Group Bridge Engineer interview -
based on 6 reviews
Rating in categories
Field Engineer
81
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Assistant Highway Engineer
53
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Assistant Bridge Engineer
45
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Road Engineer
33
salaries
| ₹3 L/yr - ₹4 L/yr |
Assistant Quality Material Engineer
27
salaries
| ₹3 L/yr - ₹5.5 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech