Filter interviews by
I appeared for an interview before May 2024, where I was asked the following questions.
Top trending discussions
posted on 29 Jun 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 2 Nov 2022
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 2 interview rounds.
The costing of wiring harness and driver seat is dependent on various factors such as the type of vehicle, quality of materials used, and manufacturing process.
The cost of wiring harness and driver seat can vary depending on the type of vehicle they are being used in. For example, the cost of these parts for a luxury car will be higher than that of a budget car.
The quality of materials used in the manufacturing of thes...
posted on 14 Aug 2023
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 14 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
I managed a team of 10, improving efficiency and driving sales growth through strategic planning and effective communication.
Led a project that increased sales by 20% in one year by implementing a new marketing strategy.
Conducted regular team meetings to foster collaboration and address challenges promptly.
Developed training programs that enhanced team skills, resulting in a 15% improvement in customer satisfaction sco...
Hydraulics is the study of fluid mechanics, focusing on the behavior of liquids in motion and at rest, and their applications.
Pascal's Principle: Pressure applied to a confined fluid is transmitted undiminished in all directions. Example: Hydraulic lift systems.
Hydraulic Pressure: The force exerted by a fluid per unit area. Example: Brake systems in vehicles use hydraulic pressure to stop.
Continuity Equation: In a clos...
Production types include job, batch, mass, and continuous, each suited for different manufacturing needs.
Job Production: Custom products made to order (e.g., bespoke furniture).
Batch Production: Goods produced in groups (e.g., bakery items).
Mass Production: Large quantities of standardized products (e.g., automobiles).
Continuous Production: Ongoing production of goods (e.g., oil refining).
Defect control strategies focus on prevention, detection, and correction to ensure quality and minimize errors.
Implement Quality Assurance (QA) processes to ensure standards are met, e.g., regular audits.
Use Statistical Process Control (SPC) to monitor processes and identify variations, e.g., control charts.
Conduct root cause analysis (RCA) for defects to prevent recurrence, e.g., the 5 Whys technique.
Train employees o...
Root cause analysis identifies the fundamental cause of a problem to prevent recurrence and improve processes.
Involves systematic investigation of issues to find underlying causes.
Common techniques include the 5 Whys and Fishbone Diagram.
Example: In manufacturing, if a machine fails, RCA would explore why it failed, not just fix it.
Used in various fields like IT, healthcare, and engineering to enhance quality and effic...
Tightening procedures ensure proper control and management of processes, enhancing efficiency and safety in operations.
Establish clear guidelines for tightening protocols, such as torque specifications for machinery.
Implement regular training sessions for staff on tightening techniques to prevent errors.
Use calibrated tools to ensure accurate tightening, reducing the risk of equipment failure.
Conduct routine inspection...
posted on 5 Mar 2024
I applied via Approached by Company and was interviewed in Feb 2024. There were 2 interview rounds.
CTC (Cost to Company) refers to the total salary package an employee receives, including all benefits and allowances.
CTC includes basic salary, allowances, bonuses, and benefits like health insurance.
For example, if your CTC is $60,000, it may include $40,000 as basic salary and $20,000 as bonuses and benefits.
Understanding CTC helps in negotiating salary and understanding the total compensation offered by an employer.
...
posted on 21 Jul 2025
I appeared for an interview before Jul 2024, where I was asked the following questions.
Dynamic professional with a background in management and a passion for team development and operational excellence.
Over 5 years of experience in management roles, leading teams to achieve operational goals.
Skilled in project management, successfully led a team to complete a project 20% under budget.
Strong communication skills, facilitated cross-departmental collaboration to enhance workflow efficiency.
Proficient in dat...
posted on 4 Jul 2024
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
posted on 20 May 2025
I appeared for an interview in Nov 2024, where I was asked the following questions.
Experienced leader with a diverse background in operations, team management, and strategic planning across various industries.
Over 10 years of experience in operations management, leading teams of up to 50 employees.
Successfully implemented a new inventory management system that reduced costs by 20%.
Developed and executed strategic plans that increased revenue by 30% over two years.
Led cross-functional teams in launchi...
posted on 9 Sep 2021
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
The assembly line sequence involves a step-by-step process of assembling parts to create a final product.
The process starts with the arrival of raw materials
Parts are then assembled in a specific order
Quality checks are performed at various stages
The final product is packaged and shipped
Efficiency and safety are key considerations throughout the process
based on 1 interview experience
Difficulty level
Duration
Engineer
12
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Manager
10
salaries
| ₹6.3 L/yr - ₹12.6 L/yr |
Technical Assistant
10
salaries
| ₹2 L/yr - ₹4 L/yr |
Senior Engineer
10
salaries
| ₹5 L/yr - ₹9.5 L/yr |
QA Engineer
9
salaries
| ₹3.5 L/yr - ₹5.8 L/yr |
Gilbarco Veeder Root
HYT Engineering Company Pvt Ltd
Kirloskar Toyota Textile Machinery
L&T–MHI Power Boilers