I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
Transformers are electrical devices that transfer electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to step up or step down voltage levels in electrical power transmission and distribution systems.
They consist of two or more coils of wire, known as windings, which are wound around a core made of magnetic material.
The primary winding is connected to the power source, ...
Top trending discussions
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
I appeared for an interview in Aug 2023.
Electrical engineering involves the study and application of electricity, electronics, and electromagnetism in various technologies.
Designing electrical circuits for devices like smartphones and computers.
Developing power generation systems, such as solar panels and wind turbines.
Working on control systems for automation in manufacturing processes.
Creating communication systems, including satellite and wireless technol...
Electrical engineers design, develop, and maintain electrical systems and components, ensuring efficiency and safety.
Understanding Ohm's Law: V = IR, where V is voltage, I is current, and R is resistance.
Familiarity with circuit analysis techniques, such as mesh and nodal analysis.
Experience with simulation software like MATLAB or SPICE for circuit design.
Knowledge of power systems, including generation, transmission, ...
I appeared for an interview before Feb 2024.
I appeared for an interview in Jun 2025, where I was asked the following questions.
A breakdown voltage test assesses the insulation strength of electrical components by applying high voltage until failure occurs.
1. Prepare the test setup: Ensure all equipment is calibrated and safe for high voltage testing.
2. Select the component: Choose the electrical device or insulation material to be tested.
3. Apply voltage gradually: Increase the voltage slowly to avoid sudden breakdowns, monitoring the current.
...
The vector group test determines the phase relationship and connection type of transformers.
Identifies the phase displacement between primary and secondary windings.
Common vector groups include Yd11, Yy0, and Δy5.
Used to ensure compatibility in parallel operation of transformers.
Helps in understanding the neutral grounding and fault current paths.
The insulation resistance test measures the resistance of a transformer's insulation to ensure safety and performance.
Insulation resistance is measured in ohms, indicating the quality of insulation.
A common test voltage is 500V or 1000V DC, depending on the transformer rating.
A high IR value (typically > 1 MΩ) indicates good insulation; low values suggest potential insulation failure.
The test helps prevent electrica...
The turn ratio test measures the voltage transformation ratio of a transformer to ensure proper operation and efficiency.
It compares the primary and secondary winding turns of a transformer.
A typical turn ratio might be 10:1, meaning 10 turns on the primary for every 1 on the secondary.
The test helps identify issues like shorted turns or incorrect winding connections.
For example, if a transformer is rated for 240V/120V...
Phase-to-phase angle is the angle between two phases, while phase-to-neutral angle is the angle between a phase and neutral.
In a three-phase system, the phase-to-phase angle is typically 120 degrees apart.
For example, in a balanced three-phase system, the voltage between any two phases (e.g., A and B) is 120 degrees.
The phase-to-neutral angle is 0 degrees for the neutral phase and varies for other phases.
In a star conn...
posted on 10 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Transformer vector group is a method used to represent the phase shift between the primary and secondary windings of a transformer.
Transformer vector group indicates the relationship between the primary and secondary winding phases.
It helps in determining the connection and phase shift of the transformer windings.
Common vector groups include Yy0, Yd1, Dyn11, etc.
Vector group is important for parallel operation of trans...
VBD test is conducted in transformers to ensure insulation integrity and detect any potential faults.
VBD test helps in identifying any weak spots in the insulation of the transformer
It helps in preventing breakdowns and ensuring the safety and reliability of the transformer
By conducting VBD test, any potential faults can be detected early and necessary maintenance can be carried out
It is a standard procedure in transfo...
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
based on 2 interview experiences
Difficulty level
Duration
based on 10 reviews
Rating in categories
Junior Engineer
314
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Engineer
228
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Senior Technician
197
salaries
| ₹2.2 L/yr - ₹4.7 L/yr |
Team Lead
196
salaries
| ₹3.4 L/yr - ₹7.1 L/yr |
Electrical Engineer
147
salaries
| ₹2.3 L/yr - ₹6 L/yr |
Sodexo
Compass Group Support Services
ISS Facility Services
BVG India