Filter interviews by
Top trending discussions
I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.
Manager related
I applied via Naukri.com and was interviewed in Feb 2021. There were 7 interview rounds.
I applied via Company Website and was interviewed in Nov 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 3 interview rounds.
Man in the middle attack is a type of cyber attack where the attacker intercepts communication between two parties.
The attacker intercepts communication between two parties and can eavesdrop or alter the communication
It can be done through various methods such as ARP spoofing, DNS spoofing, etc.
It can be prevented by using encryption, digital signatures, and secure communication protocols
I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.
The maximum quantity that can be poured at a time depends on the size and capacity of the container being used.
The maximum quantity that can be poured at a time is determined by the size of the container.
Factors such as viscosity of the liquid, pouring speed, and skill of the person pouring also play a role.
For example, a small cup may only be able to pour a few ounces at a time, while a large pitcher could pour severa...
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
They asked me in-depth questions about transformers, motors, conveyors, power distribution, PLC, maintenance, power distribution and flow,and troubleshooting etc. normal working and application of plant in which you are working. Realtime issues and how to tackle them.
Number system, puzzle, shapes, odd one out, profit loss, percentage, age, statements etc.
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
The process involves maintenance and checks on machinery, ensuring safety and functionality of the conveyor belt.
Conduct thorough checks on machinery components before starting work.
Replace old slue bearings with new ones to ensure smooth operation.
Tighten all nuts and bolts securely to prevent any operational issues.
Complete all necessary paperwork to document maintenance activities.
Test the conveyor belt after mainte...
The process of replacing a V-scraper involves safety checks, removal of old parts, and ensuring proper documentation.
Ensure all safety protocols are followed before starting the replacement.
Carefully remove the old V-scraper, checking for any wear or damage.
Install the new V-scraper, ensuring it fits securely and aligns properly.
Tighten all bolts and nuts to the manufacturer's specifications to prevent loosening.
Comple...
Ensured safe and efficient discharge chute replacement with proper documentation and equipment checks.
Conducted a thorough safety assessment before starting the discharge chute replacement.
Removed the old discharge chute carefully, ensuring no damage to surrounding equipment.
Installed the new discharge chute, ensuring all bolts and nuts were tightened to specifications.
Completed all necessary paperwork to document the ...
Ensuring safety and efficiency during motor replacement involves careful planning, execution, and documentation.
Prioritize safety by wearing appropriate PPE (Personal Protective Equipment) during the motor replacement process.
Document each step of the process, including old motor removal and new motor installation, to maintain a clear record.
Use a torque wrench to ensure proper bolt and nut tightening, preventing futur...
Ensuring safety and proper documentation during gearbox replacement is crucial for operational efficiency.
Conduct a thorough risk assessment before starting the gearbox replacement.
Ensure all safety gear is worn, such as gloves and helmets, to prevent injuries.
Document the entire process, including old gearbox removal and new gearbox installation.
Use a dial gauge to check alignment and ensure proper fitting of the new ...
based on 6 reviews
Rating in categories
Production Operator
59
salaries
| ₹1.9 L/yr - ₹4.5 L/yr |
Quality Controller
52
salaries
| ₹2 L/yr - ₹6 L/yr |
Team Lead
34
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Advanced Engineer
27
salaries
| ₹9.5 L/yr - ₹13.5 L/yr |
Operator
27
salaries
| ₹1.7 L/yr - ₹4.3 L/yr |
Adani Group
NTPC
Tata Power
GE VERNOVA