Customer focus, Production records maintain, manpower Handling,
Ensuring timely supply and delivery of semi-finished powertrain components to the main production line.
Coordinate with suppliers to ensure timely delivery of semi-finished powertrain components.
Implement inventory management systems to track supply levels and prevent shortages.
Work closely with logistics team to optimize delivery schedules and minimize delays.
Regularly communicate with production line managers to under...
Production planning, customerfocus,manpowed Handling, Production records maintain, handle AT Line- NO production loss,Ensure quality of product
Top trending discussions
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Bajaj auto department role, about themes Full form,some basic aptitude
I applied via Referral and was interviewed in Mar 2021. There was 1 interview round.
A part name in a vehicle is the alternator.
The alternator is responsible for charging the battery and powering the electrical system.
It is typically located near the front of the engine and is driven by a belt.
Examples of vehicles that have alternators include cars, trucks, and motorcycles.
posted on 9 Mar 2022
I applied via Approached by Company and was interviewed in Feb 2022. There were 5 interview rounds.
Skill fest department related
Shop flower
Improvement
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
Man power is allocated to production lines based on skill matrix.
Man power allocation process based on skill matrix
Production department assigns man power to lines
Man power utilized based on skill set
Examples: assigning a skilled welder to a welding line
Ensuring proper training and certification for each skill set
posted on 10 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I excel in team leadership and problem-solving but sometimes struggle with delegation due to my desire for perfection.
Strength: Strong leadership skills - I successfully led a team to improve production efficiency by 20%.
Strength: Excellent problem-solving abilities - I implemented a new workflow that reduced downtime by 15%.
Weakness: Difficulty in delegation - I tend to take on too much myself, which can lead to burno...
I bring extensive experience in production management, strong leadership skills, and a commitment to continuous improvement.
Proven track record of increasing production efficiency by 20% in my previous role through process optimization.
Strong leadership skills demonstrated by successfully managing a team of 15 employees, fostering a collaborative work environment.
Experience in implementing safety protocols that reduced...
posted on 29 Jun 2023
I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.
There are two main types of breaks: planned breaks and unplanned breaks.
Planned breaks are scheduled breaks that are typically taken during designated times, such as lunch breaks or coffee breaks.
Unplanned breaks are breaks that occur unexpectedly, such as when a machine malfunctions or when there is a sudden change in production schedule.
There are several types of gears used in various industries, each serving a specific purpose.
Types of gears include spur gears, helical gears, bevel gears, worm gears, rack and pinion gears, etc.
Each type of gear has unique characteristics and is used for specific applications.
For example, spur gears are commonly used in parallel shaft arrangements, while bevel gears are used to change the direction of power transmissi...
DC stands for direct current, which is a type of electrical current that flows in one direction.
DC is commonly used in batteries and electronic devices.
It is different from AC (alternating current) which changes direction periodically.
DC can be produced by batteries, solar cells, and rectifiers.
Examples of DC devices include flashlights, cell phones, and laptops.
posted on 24 Aug 2023
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Process method and problem solving involves identifying issues in production processes and implementing solutions.
Identify root causes of production issues
Implement process improvements to prevent future problems
Utilize problem-solving techniques like root cause analysis and 5 Whys
Collaborate with team members to brainstorm solutions
Monitor and evaluate the effectiveness of implemented solutions
based on 1 interview experience
Difficulty level
Duration
based on 2 reviews
Rating in categories
Deputy Manager
307
salaries
| ₹10 L/yr - ₹17.2 L/yr |
Assistant Manager
298
salaries
| ₹5 L/yr - ₹11.5 L/yr |
Senior Engineer
191
salaries
| ₹9.5 L/yr - ₹16 L/yr |
Manager
153
salaries
| ₹16.6 L/yr - ₹27.8 L/yr |
Lead Engineer
126
salaries
| ₹13 L/yr - ₹24 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland