i
Manjushree
Technopack
Filter interviews by
I appeared for an interview before Mar 2024, where I was asked the following questions.
Monthly machine capacity checks ensure optimal performance and identify maintenance needs.
1. Review production logs: Analyze output data to compare against machine capacity.
2. Conduct physical inspections: Check for wear and tear that may affect performance.
3. Monitor downtime: Track any machine downtime to assess its impact on capacity.
4. Use software tools: Implement capacity planning software to analyze trends and f...
Creating a trial plan involves defining objectives, designing methodology, and ensuring compliance with regulations.
Define the objectives: Clearly outline what the trial aims to achieve, e.g., testing a new drug's efficacy.
Design the methodology: Choose the study design (e.g., randomized controlled trial) and determine sample size.
Select the target population: Identify the demographic and clinical characteristics of pa...
Top trending discussions
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
I am a Senior Engineer with 8 years of experience in software development. My salary expectations are in line with industry standards.
Senior Engineer with 8 years of experience
Skilled in software development
Salary expectations aligned with industry standards
We discussed the salary range for the Senior Engineer position and negotiated based on my experience and qualifications.
Discussed salary range during final interview
Negotiated based on experience and qualifications
Reached agreement on salary package
I applied via Referral and was interviewed in Jan 2021. There were 3 interview rounds.
Our company's production efficiency is high with low energy consumption per unit of production.
Our production efficiency is measured by the number of units produced per hour or day.
We have implemented various energy-saving measures such as using LED lights, optimizing machine settings, and recycling waste materials.
Our energy consumption per unit of production is constantly monitored and analyzed to identify areas for ...
Harmonic filters and active filters are used to suppress harmonics in our industry.
Harmonic filters are installed to reduce harmonic distortion in the power system.
Active filters are used to eliminate harmonics generated by non-linear loads.
Proper grounding and shielding techniques are employed to minimize electromagnetic interference.
Regular maintenance and monitoring of equipment is done to ensure proper functioning.
...
Some better options for harmonic suppression are...
Active filters
Passive filters
Tuned filters
Phase-shifting transformers
Multi-pulse converters
Variable frequency drives
Power factor correction capacitors
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Jul 2020. There was 1 interview round.
My aim is to contribute to innovative projects, enhance my skills, and grow within the company while delivering quality engineering solutions.
Contribute to team projects by applying my engineering skills effectively.
Seek opportunities for professional development, such as attending workshops.
Collaborate with experienced engineers to learn best practices and improve my work.
Aim to take on increasing responsibilities, su...
I am impressed with the company's reputation and believe I have the skills to handle any problem in their work.
I have researched the company and am impressed with their track record and positive reviews.
I have a strong background in problem-solving and have successfully resolved complex issues in my previous roles.
I am confident in my ability to adapt to new challenges and learn quickly to address any problem that may ...
Microsoft Excel formulas like vlookup, hlookup, pivot, and Planning sop.
vlookup and hlookup are used to search for specific data in a table
pivot tables are used to summarize and analyze data
Planning sop is a formula used for planning and scheduling
Excel has many other useful formulas for data analysis and manipulation
I applied via Newspaper Ad and was interviewed in Jul 2024. There were 3 interview rounds.
Normal question as competitive
I come from a close-knit family that values education and hard work, which has greatly influenced my career aspirations.
My father is an engineer, which inspired my interest in technology and problem-solving.
My mother is a teacher, emphasizing the importance of education and lifelong learning.
I have a younger sister who is currently pursuing her studies in science, showcasing our family's commitment to academic excellen...
I appeared for an interview before Apr 2024, where I was asked the following questions.
Gears in a gearbox wear out due to friction, misalignment, poor lubrication, and material fatigue.
Friction: Continuous contact between gears generates heat, leading to wear. Example: High-speed applications like automotive transmissions.
Misalignment: Improper installation can cause uneven load distribution. Example: Gearboxes in industrial machinery.
Poor lubrication: Insufficient or contaminated lubricant increases fri...
CCP stands for Critical Control Point, essential in food safety management systems.
CCP is a key concept in Hazard Analysis and Critical Control Points (HACCP).
It identifies points in the food production process where hazards can be controlled.
Examples of CCPs include cooking temperatures, cooling times, and cross-contamination prevention.
Monitoring CCPs helps ensure food safety and compliance with regulations.
PPM stands for Parts Per Million, a unit of measurement used to describe the concentration of one substance in a million parts of another.
Commonly used in environmental science to measure pollutants in air or water.
In chemistry, it can describe the concentration of a solute in a solution.
For example, 400 PPM of CO2 in the atmosphere indicates 400 molecules of CO2 per million molecules of air.
In manufacturing, PPM can r...
I would prioritize tasks, assess the situation, and allocate resources effectively to manage simultaneous breakdowns.
Assess the severity of each breakdown to prioritize response.
Communicate with team members to delegate tasks effectively.
Utilize available resources and tools to address both issues simultaneously.
Implement a temporary fix for one issue while focusing on the other.
Document the breakdowns and resolutions ...
based on 1 interview experience
Difficulty level
Duration
based on 2 reviews
Rating in categories
Production Engineer
176
salaries
| ₹2.2 L/yr - ₹6.5 L/yr |
Junior Engineer
156
salaries
| ₹1.7 L/yr - ₹4.7 L/yr |
Engineer
97
salaries
| ₹2.7 L/yr - ₹6.5 L/yr |
Assistant Manager
80
salaries
| ₹4.9 L/yr - ₹11.6 L/yr |
Quality Engineer
73
salaries
| ₹2.5 L/yr - ₹5.2 L/yr |
Uflex
Huhtamaki
EPL Limited
Jindal Poly Films