Concepts used in project controls include budgeting, scheduling, risk management, and performance measurement.
Budgeting: Creating and managing the project budget to ensure financial goals are met.
Scheduling: Developing timelines and milestones to track progress and ensure timely completion.
Risk Management: Identifying and mitigating potential risks that could impact the project.
Performance Measurement: Monitoring and e...
Top trending discussions
A good Daily Progress Report (D.P.R) captures site activities, progress, and challenges to ensure effective project management.
Document daily activities: Record all tasks completed each day, such as excavation, concrete pouring, or installation of structures.
Track progress against the schedule: Compare actual progress with planned timelines to identify delays or ahead-of-schedule tasks.
Include weather conditions: Note ...
I appeared for an interview in Dec 2024, where I was asked the following questions.
I have over 10 years of experience in management, focusing on team leadership, project execution, and strategic planning.
Led a team of 15 in a tech startup, increasing productivity by 30% through effective delegation and motivation.
Managed a $2 million project, delivering it 2 weeks ahead of schedule and under budget by optimizing resource allocation.
Implemented a new customer feedback system that improved client satis...
My approach to strategy development involves thorough analysis, stakeholder engagement, and iterative refinement to ensure alignment and effectiveness.
Conduct a comprehensive SWOT analysis to identify strengths, weaknesses, opportunities, and threats.
Engage stakeholders through workshops and interviews to gather diverse perspectives and insights.
Set clear, measurable objectives that align with the organization's vision...
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
Construction material and techniques
Construction labour management
Site work
I applied via Newspaper Ad and was interviewed before Aug 2021. There were 2 interview rounds.
Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.
Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.
The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.
For example, in a coast...
The consumption of shuttering oil per liter depends on the area covered.
The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.
On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.
However, this can vary significantly based on the absorbency of the surface and the thickness of ...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Waterproofing is a process of making a structure or material resistant to the penetration of water.
Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.
It is commonly used in construction to protect buildings from water damage.
Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.
Types of foundation include shallow, deep, and pile foundations.
Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.
Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.
Pile foundations are deep foundations that consist of long, slender columns driven...
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Senior Process Engineer
10
salaries
| ₹21.5 L/yr - ₹30 L/yr |
Senior Engineer
8
salaries
| ₹15.7 L/yr - ₹27 L/yr |
Senior Piping Designer
8
salaries
| ₹17 L/yr - ₹23 L/yr |
Financial Analyst
7
salaries
| ₹5 L/yr - ₹8.2 L/yr |
Process Designer
7
salaries
| ₹10.4 L/yr - ₹15 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
McNally Bharat Engineering
ABCI Infrastructures