Upload Button Icon Add office photos

PM Group

Compare button icon Compare button icon Compare

Filter interviews by

PM Group Project Controller Interview Questions and Answers

Updated 13 Feb 2025

PM Group Project Controller Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Not Selected

I appeared for an interview in Aug 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Questions related to work experience
  • Q2. Concepts used in project controls
  • Ans. 

    Concepts used in project controls include budgeting, scheduling, risk management, and performance measurement.

    • Budgeting: Creating and managing the project budget to ensure financial goals are met.

    • Scheduling: Developing timelines and milestones to track progress and ensure timely completion.

    • Risk Management: Identifying and mitigating potential risks that could impact the project.

    • Performance Measurement: Monitoring and e...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Same questions as round 1
Round 3 - Technical 

(1 Question)

  • Q1. Same questions as round 1 & 2

Top trending discussions

View All
Interview Hub
6d
a client servicing executive
FeedCard Image
Got a question about PM Group?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Safety related 

(2 Questions)

  • Q1. What is hazards
  • Q2. What is Hira and method

Project Controller Interview Questions Asked at Other Companies

asked in WSP
Q1. What is a baseline in project management, what are its types, and ... read more
Q2. What is project schedule and which software do you use to create ... read more
Q3. What is the procedure to start the project?
asked in WSP
Q4. What is a risk register, and what is the difference between an is ... read more
asked in WSP
Q5. What is the Spotlight feature, and how does it assist users?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What is the role of site engineer in the field
  • Q2. How to make good D.P.R at site
  • Ans. 

    A good Daily Progress Report (D.P.R) captures site activities, progress, and challenges to ensure effective project management.

    • Document daily activities: Record all tasks completed each day, such as excavation, concrete pouring, or installation of structures.

    • Track progress against the schedule: Compare actual progress with planned timelines to identify delays or ahead-of-schedule tasks.

    • Include weather conditions: Note ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024, where I was asked the following questions.

  • Q1. Can you describe your previous work experience?
  • Ans. 

    I have over 10 years of experience in management, focusing on team leadership, project execution, and strategic planning.

    • Led a team of 15 in a tech startup, increasing productivity by 30% through effective delegation and motivation.

    • Managed a $2 million project, delivering it 2 weeks ahead of schedule and under budget by optimizing resource allocation.

    • Implemented a new customer feedback system that improved client satis...

  • Answered by AI
  • Q2. What is your approach to strategy development?
  • Ans. 

    My approach to strategy development involves thorough analysis, stakeholder engagement, and iterative refinement to ensure alignment and effectiveness.

    • Conduct a comprehensive SWOT analysis to identify strengths, weaknesses, opportunities, and threats.

    • Engage stakeholders through workshops and interviews to gather diverse perspectives and insights.

    • Set clear, measurable objectives that align with the organization's vision...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Honestly explain your experience and provide a logical conclusion for the questions.

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

Construction material and techniques
Construction labour management
Site work

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Autocad
  • REVIT Architecture
Interview preparation tips for other job seekers - I am very happy to construction work related jobs and design course are completed

I applied via Newspaper Ad and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. I waiting for interview after completing course
  • Q2. May be technical knowledge must

Interview Preparation Tips

Interview preparation tips for other job seekers - As a engineer you need have to be very practical knowledge as well experience
Be interview-ready. Browse the most asked HR questions.
illustration image
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.
Are these interview questions helpful?

Interview Questionnaire 

5 Questions

  • Q1. What the thickness of compreg ply and it's size
  • Ans. 12mm thick and it's size=1220mm x 2440 mm
  • Answered by Arvind Devrani
  • Q2. Maximum reapetation of ply shuttering
  • Ans. As per structure but atlest 7 times
  • Answered by Arvind Devrani
  • Q3. Consumption of shuttering oil per ltr how much area covered
  • Ans. 

    The consumption of shuttering oil per liter depends on the area covered.

    • The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.

    • On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.

    • However, this can vary significantly based on the absorbency of the surface and the thickness of ...

  • Answered by AI
  • Q4. How much elongation % of fe550 steel
  • Q5. What the mean of rolling margin of the steel
  • Ans. The difference between therotical and actual weight of steel
  • Answered by Arvind Devrani

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and deeply knowledge of each material and it's properties
Round 1 - Technical 

(1 Question)

  • Q1. Introduction,goals,Explain your final year project

Interview Preparation Tips

Interview preparation tips for other job seekers - Do preperation on communication skill development,focus on technical area,have a goal
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

PM Group Interview FAQs

How many rounds are there in PM Group Project Controller interview?
PM Group interview process usually has 3 rounds. The most common rounds in the PM Group interview process are Technical and One-on-one Round.
How to prepare for PM Group Project Controller interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PM Group. The most common topics and skills that interviewers at PM Group expect are Business Strategy, Construction Management, Forecasting, ICT and Life Sciences.

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 1 interview experience

Difficulty level

Easy 100%

Duration

More than 8 weeks 100%
View more

PM Group Project Controller Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

-

Skill development

-

Work-life balance

-

Salary

-

Job security

-

Company culture

-

Promotions

-

Work satisfaction

Explore 1 Review and Rating
Senior Process Engineer
10 salaries
unlock blur

₹21.5 L/yr - ₹30 L/yr

Senior Engineer
8 salaries
unlock blur

₹15.7 L/yr - ₹27 L/yr

Senior Piping Designer
8 salaries
unlock blur

₹17 L/yr - ₹23 L/yr

Financial Analyst
7 salaries
unlock blur

₹5 L/yr - ₹8.2 L/yr

Process Designer
7 salaries
unlock blur

₹10.4 L/yr - ₹15 L/yr

Explore more salaries
Compare PM Group with

Lea Associates South Asia

4.2
Compare

R.V.R. PROJECTS

4.1
Compare

McNally Bharat Engineering

4.0
Compare

ABCI Infrastructures

3.4
Compare
write
Share an Interview