i
VIKRAN Engineering &
Exim
Filter interviews by
Invoice verification ensures accuracy and compliance before payment processing.
Check invoice details against purchase orders for discrepancies.
Verify receipt of goods/services before approving payment.
Ensure correct pricing and terms are applied as per agreements.
Example: If an invoice shows $500 for 100 units, confirm the unit price matches the contract.
Review any taxes or discounts applied to ensure they are acc...
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakehold...
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
The formula for calculating steel weight is based on the density of steel and the volume of the steel object.
The formula for steel weight is: weight = volume x density
The density of steel is typically around 7850 kg/m³
To calculate the volume of a steel object, use the appropriate formula for its shape (e.g. for a rectangular prism, volume = length x width x height)
Once you have the volume and density, plug them in...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and othe...
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control syste...
SAP software is a complex enterprise resource planning system used for managing business operations.
SAP software is used for managing various business operations such as finance, sales, inventory, and human resources.
It requires specialized training and certification to use effectively.
Users can access SAP through a web-based interface or a desktop application.
SAP software can be customized to meet the specific ne...
Working in a power distribution store requires knowledge of electrical equipment and customer service skills.
Familiarize yourself with the different types of electrical equipment sold in the store
Be knowledgeable about the features and benefits of each product
Assist customers in selecting the right product for their needs
Handle customer complaints and provide solutions
Maintain a clean and organized store
Ensure tha...
The interview question is about 1.33kv&11kv BOQ, power transformer description, and the role of CT/PT.
BOQ for 1.33kv and 11kv involves preparing a bill of quantities for electrical equipment and materials required for the project.
Power transformer description includes its specifications, such as voltage rating, power rating, winding configuration, cooling system, etc.
CT/PT (Current Transformer/Potential Transforme...
Answering questions related to electrical engineering
To find if a transformer is star or delta connected, check the connection of the primary and secondary windings
APL/BPL/AGL materials refer to Above Poverty Line/Below Poverty Line/Anti-Graffiti materials used in construction
ROW stands for Right of Way, which is the legal right to pass through a property or land
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I appeared for an interview in May 2025, where I was asked the following questions.
I have extensive experience in rural electrification projects, focusing on sustainable energy solutions and community engagement.
Led a project in rural India that provided solar power to over 500 households, improving quality of life and local businesses.
Collaborated with local governments and NGOs to identify areas in need of electrification, ensuring community needs were met.
Implemented training programs for local te...
I appeared for an interview in Aug 2024.
Invoice verification ensures accuracy and compliance before payment processing.
Check invoice details against purchase orders for discrepancies.
Verify receipt of goods/services before approving payment.
Ensure correct pricing and terms are applied as per agreements.
Example: If an invoice shows $500 for 100 units, confirm the unit price matches the contract.
Review any taxes or discounts applied to ensure they are accurate...
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 3 interview rounds.
Technical related questions and answers
My last company name
My last company CTC was $60,000 per year.
My last company CTC was $60,000 per year
CTC stands for Cost to Company
It includes salary, bonuses, benefits, and any other perks
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
A set of questions related to safety officer's duties and responsibilities.
Work Permit System is a formal written system used to control certain types of work that are potentially hazardous.
An Emergency is an unexpected and potentially dangerous situation requiring immediate action.
Sandblasting is a process of cleaning or etching a surface using sand or other abrasive materials propelled by compressed air.
JSA stands fo...
Top trending discussions
Some of the top questions asked at the VIKRAN Engineering & Exim interview -
The duration of VIKRAN Engineering & Exim interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 32 interview experiences
Difficulty level
Duration
based on 276 reviews
Rating in categories
Senior Engineer
65
salaries
| ₹3.2 L/yr - ₹8.1 L/yr |
Assistant Manager
45
salaries
| ₹3.8 L/yr - ₹10.3 L/yr |
Engineer
38
salaries
| ₹2 L/yr - ₹6.1 L/yr |
Deputy Manager
28
salaries
| ₹7.5 L/yr - ₹12.6 L/yr |
Site Engineer
22
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
ABCI Infrastructures
The Louis Berger Group
Perkins
Nesma & Partners