Filter interviews by
I would manage the site by ensuring safety, communication, and efficient resource allocation while adhering to project timelines.
Conduct regular safety inspections to ensure compliance with regulations.
Establish clear communication channels among team members and stakeholders.
Implement a project management tool to track progress and deadlines.
Coordinate with subcontractors to ensure timely delivery of materials.
Hold da...
The density of cement is around 1440 kg/m³.
Density of cement is the mass per unit volume of cement.
It is measured in kg/m³ or g/cm³.
The density of cement varies depending on the type of cement used.
For example, the density of Portland cement is around 1440 kg/m³.
The density of lightweight cement is around 1000 kg/m³.
Top trending discussions
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.
The cross section of bottom chord of open web girder varies depending on the design and load requirements.
The cross section can be rectangular, trapezoidal, or triangular in shape.
The size and shape of the bottom chord is determined by the span of the girder and the loads it will carry.
The material used for the bottom chord can also affect its cross section.
Examples of open web girder bottom chord cross sections includ...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
based on 6 reviews
Rating in categories
Engineer
110
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Assistant Manager
97
salaries
| ₹4 L/yr - ₹9 L/yr |
Senior Engineer
82
salaries
| ₹3.5 L/yr - ₹7.6 L/yr |
Deputy Manager
63
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Senior Assistant Manager
59
salaries
| ₹5.1 L/yr - ₹10.3 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon