I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
Rate analysis of BOQ items involves calculating the rates of various items in the Bill of Quantities.
Rate analysis involves determining the cost of materials, labor, and equipment for each item in the BOQ.
It helps in estimating the total cost of a project and comparing it with the budget.
Factors like market rates, location, and project specifications are considered in rate analysis.
Example: Calculating the rate of conc...
Standard output of Machinery refers to the expected production rate or quantity of goods produced by a machine in a given time period.
Standard output is determined by the capacity and efficiency of the machinery.
Factors affecting standard output include machine speed, maintenance, and operator skill.
Examples of standard output measurements include units per hour, tons per day, or meters per minute.
Top trending discussions
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
20 question of Apti and 30 questions of Technical, timing 1 hr
WBS stands for Work Breakdown Structure, which is a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS for a highway project would include major components like earthwork, pavement, drainage, signage, lighting, etc.
WBS for a structure project would include components like foundation, superstructure, finishes, MEP (mechanical, electrical, plumbing), etc.
Each major component i...
I appeared for an interview before Jul 2024, where I was asked the following questions.
As a Planning Engineer, I focus on project scheduling, resource allocation, and risk management to ensure timely project delivery.
Experience in using software like Primavera P6 for project scheduling.
Successfully managed a project that reduced delivery time by 20% through effective resource allocation.
Implemented risk management strategies that minimized project delays.
Collaborated with cross-functional teams to align ...
I appeared for an interview in Oct 2022.
posted on 22 Dec 2021
I appeared for an interview before Dec 2020.
posted on 2 Jun 2021
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
posted on 18 Aug 2024
I applied via Walk-in and was interviewed before Aug 2023. There were 2 interview rounds.
posted on 30 Jul 2023
I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.
posted on 24 Jun 2025
I appeared for an interview before Jun 2024, where I was asked the following questions.
Silt content in concrete affects strength; allowable limits are crucial for durability and performance.
Silt content should not exceed 5% by weight of the total aggregate.
Excessive silt can lead to reduced workability and strength.
For example, a concrete mix with 10% silt may experience significant strength loss.
Silt can also increase water demand, affecting the water-cement ratio.
The mix design process in concrete technology involves selecting materials and proportions to achieve desired strength and durability.
1. Determine the purpose of the concrete (e.g., structural, decorative).
2. Select the appropriate materials: cement, aggregates, water, and additives.
3. Calculate the water-cement ratio based on strength requirements.
4. Conduct trial mixes to test workability and strength.
5. Adjust propo...
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Senior Accounts Executive
12
salaries
| ₹3.5 L/yr - ₹5.3 L/yr |
Assistant Manager
11
salaries
| ₹3.6 L/yr - ₹7.6 L/yr |
Executive Accountant
11
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Accountant
10
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Structural Engineer
9
salaries
| ₹3.8 L/yr - ₹6.6 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies