The mix design process in concrete technology involves selecting materials and proportions to achieve desired strength and durability.
1. Determine the purpose of the concrete (e.g., structural, decorative).
2. Select the appropriate materials: cement, aggregates, water, and additives.
3. Calculate the water-cement ratio based on strength requirements.
4. Conduct trial mixes to test workability and strength.
5. Adjust ...
Labour outputs refer to the amount of work completed by a laborer within a specific time frame.
Labour outputs are typically measured in units of work completed, such as square meters of concrete poured or number of bricks laid.
They are influenced by factors such as skill level of the laborer, availability of tools and equipment, and working conditions.
Monitoring and analyzing labour outputs can help in assessing p...
The sequence of planning involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify resources needed for the project
Create a detailed schedule outlining tasks and milestones
Allocate resources effectively to meet project deadlines
Monitor progress and make adjustments as needed
Project deliverables are the tangible outcomes or results that must be produced to complete a project.
They are specific, measurable, and usually time-bound.
Examples include reports, prototypes, software, buildings, or any other tangible product or result.
Deliverables help to define the scope of the project and provide a clear target for the project team.
Silt content in concrete affects strength; allowable limits are crucial for durability and performance.
Silt content should not exceed 5% by weight of the total aggregate.
Excessive silt can lead to reduced workability and strength.
For example, a concrete mix with 10% silt may experience significant strength loss.
Silt can also increase water demand, affecting the water-cement ratio.
Key responsibilities include creating project schedules, monitoring progress, identifying delays, and providing recommendations for improvement.
Creating and maintaining project schedules using software like Primavera P6
Monitoring project progress and identifying potential delays
Analyzing project data to provide recommendations for improvement
Collaborating with project team members to ensure schedule adherence
Prepa...
I appeared for an interview in May 2025, where I was asked the following questions.
I appeared for an interview before Jun 2024, where I was asked the following questions.
Silt content in concrete affects strength; allowable limits are crucial for durability and performance.
Silt content should not exceed 5% by weight of the total aggregate.
Excessive silt can lead to reduced workability and strength.
For example, a concrete mix with 10% silt may experience significant strength loss.
Silt can also increase water demand, affecting the water-cement ratio.
The mix design process in concrete technology involves selecting materials and proportions to achieve desired strength and durability.
1. Determine the purpose of the concrete (e.g., structural, decorative).
2. Select the appropriate materials: cement, aggregates, water, and additives.
3. Calculate the water-cement ratio based on strength requirements.
4. Conduct trial mixes to test workability and strength.
5. Adjust propo...
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
20 question of Apti and 30 questions of Technical, timing 1 hr
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
30 Marks Technical related to Works and Codes (Depends upon department)
Project deliverables are the tangible outcomes or results that must be produced to complete a project.
They are specific, measurable, and usually time-bound.
Examples include reports, prototypes, software, buildings, or any other tangible product or result.
Deliverables help to define the scope of the project and provide a clear target for the project team.
Labour outputs refer to the amount of work completed by a laborer within a specific time frame.
Labour outputs are typically measured in units of work completed, such as square meters of concrete poured or number of bricks laid.
They are influenced by factors such as skill level of the laborer, availability of tools and equipment, and working conditions.
Monitoring and analyzing labour outputs can help in assessing produc...
Key responsibilities include creating project schedules, monitoring progress, identifying delays, and providing recommendations for improvement.
Creating and maintaining project schedules using software like Primavera P6
Monitoring project progress and identifying potential delays
Analyzing project data to provide recommendations for improvement
Collaborating with project team members to ensure schedule adherence
Preparing ...
I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.
Aptitude tests your technical knowledge based on college education.
Top trending discussions
I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.
I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.
Seeking new challenges and opportunities for skill development
Leaving for career growth and advancement
Experience and expertise in the field
Ability to contribute effectively to the team and projects
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
based on 5 interview experiences
Difficulty level
Duration
based on 44 reviews
Rating in categories
Deputy Manager
690
salaries
| ₹7.9 L/yr - ₹15 L/yr |
Senior Engineer
438
salaries
| ₹5 L/yr - ₹12 L/yr |
Construction Engineer
303
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Safety Officer
232
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Civil Site Engineer
216
salaries
| ₹2.3 L/yr - ₹6.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Kalpataru Projects International
Alstom Transportation