I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
I have 10 years of experience in construction site supervision.
I have supervised construction sites for 10 years
Managed teams of workers and subcontractors
Ensured compliance with safety regulations and project timelines
Implemented quality control measures to maintain high standards
Resolved any issues or conflicts that arose on site
A project bar chart is a visual representation of project tasks and their timelines.
Project bar charts show tasks as bars with lengths representing their duration
They help in visualizing project timelines and dependencies
Commonly used in project management software like Microsoft Project or Asana
Top trending discussions
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
Total 3 rounds of interview were conducted
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed ...
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Safety Officer
69
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Junior Engineer
59
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Junior Engineer Civil
58
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Engineer
55
salaries
| ₹4.1 L/yr - ₹9.5 L/yr |
Quantity Surveyor
36
salaries
| ₹3 L/yr - ₹8.5 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech