A Senior Engineer was asked 4mo ago
Q. What is a non-destructive test?
Ans. 

Non-destructive testing is a method used to evaluate the properties of a material, component, or system without causing damage.

  • Non-destructive tests are used to detect flaws or defects in materials without altering their physical properties.

  • Examples of non-destructive tests include ultrasonic testing, radiography, magnetic particle testing, and visual inspection.

  • These tests are commonly used in industries such as ...

View all Senior Engineer interview questions
An Assistant Resident Engineer was asked
Q. Which IS code is followed for mix design, cube test, and slump test?
Ans. 

IS code 10262 is followed for mix design, IS code 516 for cube test, IS code 1199 for slump test.

  • Mix design follows IS code 10262

  • Cube test follows IS code 516

  • Slump test follows IS code 1199

View all Assistant Resident Engineer interview questions
A Senior Surveyor was asked
Q. What is the difference between layouts and stake out?
Ans. 

Layouts involve planning and designing the physical arrangement of structures, while stake out involves physically marking the positions of these structures on the ground.

  • Layouts refer to the process of planning and designing the physical arrangement of structures, such as buildings, roads, or utilities.

  • Stake out involves physically marking the positions of these structures on the ground based on the layout plans.

  • ...

View all Senior Surveyor interview questions
A Senior Site Supervisor was asked
Q. How much experience do you have in construction site supervision?
Ans. 

I have 10 years of experience in construction site supervision.

  • I have supervised construction sites for 10 years

  • Managed teams of workers and subcontractors

  • Ensured compliance with safety regulations and project timelines

  • Implemented quality control measures to maintain high standards

  • Resolved any issues or conflicts that arose on site

View all Senior Site Supervisor interview questions
A Civil Engineer was asked
Q. What is the mix ratio for M20 grade concrete?
Ans. 

The ratio of M20 concrete is 1:1.5:3.

  • The ratio of M20 concrete refers to the proportion of cement, sand, and aggregate used in the mix.

  • For M20 grade concrete, the ratio is 1 part cement, 1.5 parts sand, and 3 parts aggregate.

  • This ratio is commonly used for general construction purposes.

  • Example: For 1 cubic meter of M20 concrete, you would need 1 part cement (cubic meter), 1.5 parts sand (1.5 cubic meters), and 3 p...

View all Civil Engineer interview questions
A Site Engineer was asked 1mo ago
Q. 1)what are the types of aggregate 2) what is the yield strength 3) what is the tensile stress 4) types of steels 5) shuttering quantity 6) plaster inner& outer thickness etc...
Ans. 

Understanding aggregates, yield strength, tensile stress, steel types, shuttering quantity, and plaster thickness is essential for site engineers.

  • Types of Aggregate: Coarse aggregates (e.g., gravel, crushed stone) and fine aggregates (e.g., sand) are used in concrete.

  • Yield Strength: The stress at which a material begins to deform plastically; for example, structural steel typically has a yield strength of 250 MPa.

  • ...

View all Site Engineer interview questions
A Site Engineer was asked 1mo ago
Q. 1) what is the bending moment 2) what is the purpose of slump cone test in concrete. 3)what is the difference between shallow foundation & deep foundation
Ans. 

Bending moment measures the internal moment that causes bending in a structural element, crucial for design and analysis.

  • Definition: A bending moment is the internal moment that induces bending in a structural element, such as beams.

  • Calculation: It is calculated as the product of the force applied and the distance from the point of interest to the point of force application.

  • Significance: Understanding bending mome...

View all Site Engineer interview questions
Are these interview questions helpful?
A Senior Engineer was asked 4mo ago
Q. What is the leveling process in hilly areas?
Ans. 

Leveling process in hilly areas involves using surveying techniques to determine elevation differences and create a level surface.

  • Survey the area using leveling instruments such as a level or total station

  • Establish benchmarks at different elevations to reference measurements

  • Use trigonometry to calculate elevation differences between points

  • Create a contour map to visualize the terrain

  • Construct retaining walls or te...

View all Senior Engineer interview questions
A Senior Site Supervisor was asked
Q. Project bar chart used
Ans. 

A project bar chart is a visual representation of project tasks and their timelines.

  • Project bar charts show tasks as bars with lengths representing their duration

  • They help in visualizing project timelines and dependencies

  • Commonly used in project management software like Microsoft Project or Asana

View all Senior Site Supervisor interview questions
A Civil Engineer was asked
Q. Work of Autocad in civil engineering
Ans. 

AutoCAD is a software used in civil engineering for creating and editing 2D and 3D designs of buildings, infrastructure, and construction projects.

  • AutoCAD is used for drafting and designing architectural plans, structural layouts, and electrical and plumbing systems.

  • It allows civil engineers to create accurate and detailed drawings, including floor plans, elevations, sections, and site plans.

  • AutoCAD enables engine...

View all Civil Engineer interview questions

Suroj Buildcon Interview Experiences

27 interviews found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(10 Questions)

  • Q1. How many experience construction site supervision
  • Ans. 

    I have 10 years of experience in construction site supervision.

    • I have supervised construction sites for 10 years

    • Managed teams of workers and subcontractors

    • Ensured compliance with safety regulations and project timelines

    • Implemented quality control measures to maintain high standards

    • Resolved any issues or conflicts that arose on site

  • Answered by AI
  • Q2. Site supervision material related
  • Q3. Site equipment related
  • Q4. Site manpower related
  • Q5. Site safety rules
  • Q6. Project bar chart used
  • Ans. 

    A project bar chart is a visual representation of project tasks and their timelines.

    • Project bar charts show tasks as bars with lengths representing their duration

    • They help in visualizing project timelines and dependencies

    • Commonly used in project management software like Microsoft Project or Asana

  • Answered by AI
  • Q7. Material site mixing and r m c related
  • Q8. Centering work related
  • Q9. Site problems related
  • Q10. Contractor and sab Contractor

Interview Preparation Tips

Topics to prepare for Suroj Buildcon Senior Site Supervisor interview:
  • Supervision
Interview preparation tips for other job seekers - Good experience interviews
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What are your salary expectations?
  • Ans. 

    My salary expectations are based on my experience, skills, and the market rate for Senior Engineers.

    • Consider my years of experience in the industry

    • Take into account my specialized skills and certifications

    • Research the current market rate for Senior Engineers in this location

    • Open to negotiation based on the overall compensation package

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the leveling process in hilly areas?
  • Ans. 

    Leveling process in hilly areas involves using surveying techniques to determine elevation differences and create a level surface.

    • Survey the area using leveling instruments such as a level or total station

    • Establish benchmarks at different elevations to reference measurements

    • Use trigonometry to calculate elevation differences between points

    • Create a contour map to visualize the terrain

    • Construct retaining walls or terrace...

  • Answered by AI
  • Q2. What is a non-destructive test?
  • Ans. 

    Non-destructive testing is a method used to evaluate the properties of a material, component, or system without causing damage.

    • Non-destructive tests are used to detect flaws or defects in materials without altering their physical properties.

    • Examples of non-destructive tests include ultrasonic testing, radiography, magnetic particle testing, and visual inspection.

    • These tests are commonly used in industries such as aeros...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The political culture within the company is unproductive, as there is a lack of work freedom for employees.

Interview Questions & Answers

user image Anonymous

posted on 10 Oct 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. You Know contractor billing.
  • Ans. 

    Yes, I am familiar with contractor billing processes.

    • Understanding of contract terms and conditions

    • Reviewing contractor invoices for accuracy

    • Processing payments in accordance with contract terms

    • Resolving any billing discrepancies

    • Maintaining detailed records of contractor billing

  • Answered by AI
  • Q2. Quantity surveyor

Interview Preparation Tips

Interview preparation tips for other job seekers - Well try
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Case study about quality team size
  • Q2. Details about relevant experience
  • Q3. Personal Details
  • Q4. Past Experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Doesn't got selected, hence not able to comment on this.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-
  • Q1. What use the pile
  • Ans. 

    Piles are deep foundations used to transfer loads to deeper, stable soil layers, enhancing structural stability.

    • Piles are used in construction to support heavy structures like bridges and skyscrapers.

    • They are driven into the ground to reach stable soil or bedrock, ensuring load-bearing capacity.

    • Examples include concrete piles, steel piles, and timber piles, each suited for different soil conditions.

    • Piles can also be us...

  • Answered by AI
  • Q2. What reason the pile
  • Ans. 

    Piles are deep foundation elements used to transfer loads to deeper, more stable soil layers, ensuring structural stability.

    • Piles are used in weak soil conditions where shallow foundations are inadequate.

    • They can be made of concrete, steel, or timber, depending on the project requirements.

    • Examples include friction piles, which rely on skin friction, and end-bearing piles, which transfer load to a solid layer.

    • Piles are ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. About Rcc structure
  • Q2. About Building material

Senior Supervisor Interview Questions & Answers

user image Vinod Kumar Singh

posted on 25 Nov 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Oct 2024, where I was asked the following questions.

  • Q1. One round hr suroj buildcon
  • Q2. One round hr suroj buildcon construction work
  • Ans. 

    Yes im one round hr

  • Answered by Vinod Kumar Singh
  • Q3. Construction work road and buildings
  • Ans. 

    Yes experience in construction work road and industrial project experience

  • Answered by Vinod Kumar Singh
  • Q4. Finishing work road and buildings
  • Q5. Finishing work in the w
  • Q6. Finishing work in constructions Pvt
  • Q7. Im hard work in industrial project
  • Ans. 

    Yes Aurangabad Maharashtra

  • Answered by Vinod Kumar Singh

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work in construction work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. As per company policy
  • Q2. Safety management
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Regarding technical knowledge in that paper

Round 2 - Technical 

(1 Question)

  • Q1. Site knowledge regarding building.and infrastructure development
Round 3 - One-on-one 

(1 Question)

  • Q1. Communication skills

Interview Preparation Tips

Interview preparation tips for other job seekers - It's the best company for new employee

Site Supervisor Interview Questions & Answers

user image shiv sagar

posted on 20 Mar 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Site supervisor question and interior work fully
  • Q2. Home interior questions

Interview Preparation Tips

Interview preparation tips for other job seekers - No advice
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How to balance your work life.

Top trending discussions

View All
Interview Tips & Stories
5d
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Suroj Buildcon?
Ask anonymously on communities.

Suroj Buildcon Interview FAQs

How many rounds are there in Suroj Buildcon interview?
Suroj Buildcon interview process usually has 1-2 rounds. The most common rounds in the Suroj Buildcon interview process are Technical, Resume Shortlist and HR.
How to prepare for Suroj Buildcon interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Suroj Buildcon. The most common topics and skills that interviewers at Suroj Buildcon expect are Industrial Construction, Industrial Projects, Accounting, Communication Skills and MS Office.
What are the top questions asked in Suroj Buildcon interview?

Some of the top questions asked at the Suroj Buildcon interview -

  1. 1)what are the types of aggregate 2) what is the yield strength 3) what is the ...read more
  2. 1) what is the bending moment 2) what is the purpose of slump cone test in conc...read more
  3. Which IS code is following for mix design, cube test, slump test e...read more
What are the most common questions asked in Suroj Buildcon HR round?

The most common HR questions asked in Suroj Buildcon interview are -

  1. What are your salary expectatio...read more
  2. Tell me about yourse...read more
How long is the Suroj Buildcon interview process?

The duration of Suroj Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.2/5

based on 47 interview experiences

Difficulty level

Easy 19%
Moderate 69%
Hard 13%

Duration

Less than 2 weeks 87%
4-6 weeks 7%
More than 8 weeks 7%
View more
Join Suroj Buildcon COMMITTED TO GO BEYOND

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 127 Interviews
Apco Infratech Interview Questions
3.7
 • 122 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 64 Interviews
Wood Group Interview Questions
3.8
 • 63 Interviews
Psp Projects Interview Questions
3.9
 • 59 Interviews
View all

Suroj Buildcon Reviews and Ratings

based on 503 reviews

4.2/5

Rating in categories

4.0

Skill development

3.7

Work-life balance

4.0

Salary

4.2

Job security

4.1

Company culture

3.7

Promotions

3.9

Work satisfaction

Explore 503 Reviews and Ratings
Project Manager

India

15-24 Yrs

Not Disclosed

Plant And Machinery Manager

Pune

10-19 Yrs

Not Disclosed

Internal Auditor

Pune

5-10 Yrs

Not Disclosed

Explore more jobs
Safety Officer
69 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Junior Engineer
59 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Junior Engineer Civil
58 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Senior Engineer
55 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Quantity Surveyor
36 salaries
unlock blur

₹3 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Suroj Buildcon with

L&T Energy Hydrocarbon

3.9
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview