Deduction for plastering as per IS code is 20% for internal plastering and 33% for external plastering.
Deduction for internal plastering as per IS code is 20%.
Deduction for external plastering as per IS code is 33%.
Deduction in brick wall as per IS code refers to the reduction in dimensions of bricks to account for mortar joints.
As per IS code, deduction of 10 mm is done in each dimension of brick (length, breadth, height) for mortar joints.
This deduction is necessary to calculate the actual quantity of bricks required for a wall.
For example, if a brick has dimensions of 200mm x 100mm x 100mm, after deduction for mortar joints, t...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
I appeared for an interview before Jul 2024, where I was asked the following questions.
Experienced Senior Engineer with a proven track record in innovative solutions and team leadership, ready to drive success in your organization.
Over 10 years of experience in software development, leading projects from conception to deployment.
Successfully managed a team of 5 engineers, improving project delivery time by 30% through agile methodologies.
Developed a scalable application that increased user engagement by ...
IS CODE ensures standardization, safety, and quality in erection and fabrication processes across various engineering sectors.
Standardization: IS CODE provides uniform guidelines for materials and processes, ensuring consistency in quality.
Safety: Compliance with IS CODE helps in minimizing risks associated with structural failures during erection.
Quality Assurance: Adhering to IS CODE ensures that the fabricated compo...
A comprehensive checklist ensures quality and efficiency in constructing Pre-Engineered Buildings (PEBs).
Site Assessment: Evaluate soil conditions and topography to determine foundation requirements.
Design Review: Ensure all architectural and structural designs meet local codes and client specifications.
Material Selection: Choose appropriate materials (e.g., steel grades) based on load requirements and environmental fa...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.
Calculate the bend allowance for each bend in the ring.
Add the bend allowances together to get the total bend allowance.
Subtract the total bend allowance from the total length of the ring to get the bend deduction.
Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.
Bend deduction is calculated based on the material thickness and bend radius.
It is used to determine the flat pattern length of the material before bending.
For ring hooks, the bend deduction is typically around 1.5 times the material thickness.
The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu...
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.
IS 456:2000 provides guidelines for plain and reinforced concrete design.
IS 10262:2019 outlines the procedure for concrete mix design.
Mix design considers factors like workability, strength, and durability.
Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).
The...
Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.
High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.
Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.
Design flexibility: Can be molded into complex shapes, allowing for inn...
Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.
Prepare the foundation: Ensure the base is level and clean before starting.
Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.
Lay the first block: Start at a corner, applying mortar to the bottom and sides.
Check alignment: Use a level to ensure blocks are straight and even.
Stagger ...
based on 1 interview experience
based on 2 reviews
Rating in categories
Assistant Manager
49
salaries
| ₹4.7 L/yr - ₹9.2 L/yr |
Assistant Engineer
44
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Site Engineer
39
salaries
| ₹2 L/yr - ₹4.7 L/yr |
Technical Assistant
38
salaries
| ₹1 L/yr - ₹2.8 L/yr |
Senior Engineer
30
salaries
| ₹3.6 L/yr - ₹8 L/yr |
L&T Energy Hydrocarbon
Sterling & Wilson
AECOM
Apco Infratech