Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Toyo Engineering Team. If you also belong to the team, you can get access from here

Toyo Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Toyo Engineering IT Engineer Interview Questions and Answers

Updated 12 Aug 2024

Toyo Engineering IT Engineer Interview Experiences

1 interview found

IT Engineer Interview Questions & Answers

user image Sanjay Gupta

posted on 12 Aug 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Salary negociant
  • Q2. Notice period negociant

Interview Preparation Tips

Interview preparation tips for other job seekers - if you trying to come in toyo i suggest you try to join toyo in company contact or permanent please don't try to come thirty part contact .

Top trending discussions

View All
Interview Hub
6d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Toyo Engineering?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Ans. 

    A man day is a unit of measure representing the amount of work one person can complete in a single day.

    • Typically used in project management to estimate labor costs and timelines.

    • One man day usually equals 8 hours of work.

    • For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.

    • Helps in resource allocation and planning for projects.

  • Answered by AI
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

IT Engineer Interview Questions Asked at Other Companies

asked in 3i Infotech
Q1. What is active directory ? Role of DNS server ? Difference betwee ... read more
Q2. If a computer's WiFi is not working, what are the first troublesh ... read more
Q3. What is a MAC address, and how many bits are in a MAC address?
Q4. If Windows displays a blue screen, what are the main potential pr ... read more
Q5. What is the L2 switch and tell me which software to configure the ... read more

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cube Compressive achieving Percentage time periods?
  • Ans. 

    Cube compressive achieving percentage time periods

    • The question is asking about the percentage of time periods in which cube compressive strength is achieved

    • Cube compressive strength refers to the ability of a cube-shaped material to withstand compression

    • The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength

    • Examples of data points needed: time periods,...

  • Answered by AI
  • Q2. M20 grade and M means and 20 means and unit
  • Q3. 1:1.5:3 ,M-Mix,20 -Compresive strength,N/mm²

Interview Preparation Tips

Interview preparation tips for other job seekers - Be face Bolt don't jerk anyone becoz they also Human

Toyo Engineering HR Interview Questions

5 questions and answers

Q. Why do you want to join Toyo?
Q. What is your current salary?
Q. How much experience do you have in the army?
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. Can you provide a formal introduction and explain why you should be hired?
  • Ans. 

    Experienced Senior Engineer with a proven track record in innovative solutions and team leadership, ready to drive success in your organization.

    • Over 10 years of experience in software development, leading projects from conception to deployment.

    • Successfully managed a team of 5 engineers, improving project delivery time by 30% through agile methodologies.

    • Developed a scalable application that increased user engagement by ...

  • Answered by AI
  • Q2. What is the significance of IS CODE in the context of erection and fabrication?
  • Ans. 

    IS CODE ensures standardization, safety, and quality in erection and fabrication processes across various engineering sectors.

    • Standardization: IS CODE provides uniform guidelines for materials and processes, ensuring consistency in quality.

    • Safety: Compliance with IS CODE helps in minimizing risks associated with structural failures during erection.

    • Quality Assurance: Adhering to IS CODE ensures that the fabricated compo...

  • Answered by AI
  • Q3. What kind of checklist do you follow when constructing a Pre-Engineered Building (PEB)?
  • Ans. 

    A comprehensive checklist ensures quality and efficiency in constructing Pre-Engineered Buildings (PEBs).

    • Site Assessment: Evaluate soil conditions and topography to determine foundation requirements.

    • Design Review: Ensure all architectural and structural designs meet local codes and client specifications.

    • Material Selection: Choose appropriate materials (e.g., steel grades) based on load requirements and environmental fa...

  • Answered by AI
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I appeared for an interview in Apr 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Control Valve sizing
  • Q2. Flowmeter selection
Round 2 - HR 

(2 Questions)

  • Q1. Reason for shifting
  • Ans. 

    I shifted to pursue new opportunities for growth and development in my career.

    • Seeking new challenges and responsibilities

    • Exploring different industries or technologies

    • Relocation for personal reasons or family commitments

  • Answered by AI
  • Q2. Expected salary
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Prepare basics properly before going for interview, they mostly ask less questions with more depth.
  • Q2. Draw BMD for sway frame.
  • Ans. 

    BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.

    • BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.

    • The bending moment will be maximum at the points where the frame experiences maximum sway.

    • The BMD can be drawn by analyzing the internal forces and moments acting on the frame.

  • Answered by AI
Round 3 - One-on-one 

(3 Questions)

  • Q1. Draw piperack elevations
  • Ans. 

    Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.

    • Start by determining the dimensions and layout of the piperack

    • Use software like AutoCAD to create accurate and detailed drawings

    • Include all necessary details such as pipe sizes, supports, and connections

    • Label all components clearly for easy understanding

    • Review and revise the drawings as needed for accuracy

  • Answered by AI
  • Q2. Anchor bolt design
  • Q3. Base plate design
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About site experience

Round 2 - Technical 

(1 Question)

  • Q1. Site execution technical

Toyo Engineering Interview FAQs

How many rounds are there in Toyo Engineering IT Engineer interview?
Toyo Engineering interview process usually has 1 rounds. The most common rounds in the Toyo Engineering interview process are HR.
What are the top questions asked in Toyo Engineering IT Engineer interview?

Some of the top questions asked at the Toyo Engineering IT Engineer interview -

  1. notice period negoci...read more
  2. Salary negoci...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

4-6 weeks 100%
View more
Toyo Engineering IT Engineer Salary
based on 5 salaries
₹3 L/yr - ₹5 L/yr
16% less than the average IT Engineer Salary in India
View more details
Piping Engineer
113 salaries
unlock blur

₹6 L/yr - ₹14.1 L/yr

Project Engineer
95 salaries
unlock blur

₹6.3 L/yr - ₹16.4 L/yr

Senior Engineer
92 salaries
unlock blur

₹17.7 L/yr - ₹32 L/yr

Senior Assistant Engineer
86 salaries
unlock blur

₹7.6 L/yr - ₹13.5 L/yr

Assistant Engineer
82 salaries
unlock blur

₹6 L/yr - ₹13 L/yr

Explore more salaries
Compare Toyo Engineering with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview