Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Toyo Engineering Team. If you also belong to the team, you can get access from here

Toyo Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Toyo Engineering Project Engineer Interview Questions and Answers

Updated 14 May 2023

Toyo Engineering Project Engineer Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions were asked on past executed projects
Round 3 - HR 

(1 Question)

  • Q1. Tell us something about yourself ? Why do you want to leave your existing job ? Why are you interested in this job ?

I applied via Referral and was interviewed before Oct 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work Flow of project
  • Ans. 

    Project workflow involves planning, execution, monitoring, and control of project activities.

    • Project initiation and planning

    • Project execution and monitoring

    • Project control and closure

    • Regular communication and collaboration with team members

    • Risk management and mitigation

    • Quality assurance and control

    • Resource allocation and management

  • Answered by AI
  • Q2. Previous challanges and solutions
  • Ans. 

    One of my previous challenges was managing a project with a tight deadline and limited resources.

    • I prioritized tasks and delegated responsibilities to team members based on their strengths.

    • I communicated regularly with stakeholders to manage expectations and ensure everyone was on the same page.

    • I also looked for creative solutions, such as outsourcing certain tasks or finding ways to streamline processes.

    • Ultimately, we...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be truthful about your experience and go through the basics of civil, piping and Static equipment

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Given a starting time, find the minimum number of minutes needed ... read more
asked in Wipro
Q4. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q5. Mindbending Product Problem Statement You are given an array ARR ... read more

Top trending discussions

View All
Interview Hub
6d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Toyo Engineering?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Ans. 

    A man day is a unit of measure representing the amount of work one person can complete in a single day.

    • Typically used in project management to estimate labor costs and timelines.

    • One man day usually equals 8 hours of work.

    • For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.

    • Helps in resource allocation and planning for projects.

  • Answered by AI
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

Toyo Engineering HR Interview Questions

5 questions and answers

Q. Why do you want to join Toyo?
Q. What is your current salary?
Q. How much experience do you have in the army?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Q3. What are the advantage of steel shuttering?
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.

Toyo Engineering Interview FAQs

How many rounds are there in Toyo Engineering Project Engineer interview?
Toyo Engineering interview process usually has 2-3 rounds. The most common rounds in the Toyo Engineering interview process are Technical, Resume Shortlist and HR.
How to prepare for Toyo Engineering Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Toyo Engineering. The most common topics and skills that interviewers at Toyo Engineering expect are Project Engineering, Project Planning, Project Management, Logistics and Project Scheduling.
What are the top questions asked in Toyo Engineering Project Engineer interview?

Some of the top questions asked at the Toyo Engineering Project Engineer interview -

  1. Previous challanges and soluti...read more
  2. Work Flow of proj...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 1 interview experience

Toyo Engineering Project Engineer Salary
based on 95 salaries
₹6.3 L/yr - ₹16.4 L/yr
104% more than the average Project Engineer Salary in India
View more details

Toyo Engineering Project Engineer Reviews and Ratings

based on 16 reviews

3.9/5

Rating in categories

3.9

Skill development

3.1

Work-life balance

3.9

Salary

3.9

Job security

3.5

Company culture

3.6

Promotions

3.6

Work satisfaction

Explore 16 Reviews and Ratings
Piping Engineer
113 salaries
unlock blur

₹6 L/yr - ₹14.1 L/yr

Project Engineer
95 salaries
unlock blur

₹6.3 L/yr - ₹16.4 L/yr

Senior Engineer
92 salaries
unlock blur

₹17.7 L/yr - ₹32 L/yr

Senior Assistant Engineer
86 salaries
unlock blur

₹7.6 L/yr - ₹13.5 L/yr

Assistant Engineer
82 salaries
unlock blur

₹6 L/yr - ₹13 L/yr

Explore more salaries
Compare Toyo Engineering with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview