Filter interviews by
I applied via Referral and was interviewed before Sep 2020. There were 4 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
The full repair breakdown rms refers to the detailed analysis of the repair process in a production environment.
The full repair breakdown includes a step-by-step breakdown of the repair process.
It provides information on the time taken for each step, the resources used, and any issues encountered.
The breakdown helps identify bottlenecks, inefficiencies, and areas for improvement in the repair process.
Examples of data c...
1.ac.2 repair.3demo.intalltiob
I applied via Naukri.com and was interviewed before Oct 2023. There were 4 interview rounds.
posted on 24 Jun 2025
I appeared for an interview before Jun 2024, where I was asked the following questions.
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
Plasma welding uses a high-temperature ionized gas to melt and join metals together.
Plasma welding involves creating an electrical arc between the workpiece and the electrode, ionizing the gas to form plasma.
The high temperature of the plasma melts the metals being welded together.
Plasma welding is commonly used for precision welding of thin materials or in applications where a high level of control is needed.
Examples ...
Brazing welding is a joining process where a filler metal is melted and distributed between two or more close-fitting parts by capillary action.
Brazing involves heating the base metals to a temperature above 450°C but below their melting point.
The filler metal, usually in the form of a wire or preformed shape, is then melted and flows into the joint by capillary action.
The filler metal must wet the base metals and form...
In my previous role, I managed production processes, ensured quality control, and optimized workflows for efficiency.
Oversaw daily production operations, ensuring targets were met consistently.
Implemented lean manufacturing techniques, reducing waste by 15%.
Collaborated with cross-functional teams to improve product quality, resulting in a 10% decrease in defects.
Conducted regular equipment maintenance checks to minimi...
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
Past experiences and reason of job change along with the expectation from Daikin
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Minimizes idle time and bottlenecks
Helps improve productivity and reduce production costs
Example: In an assembly line, tasks like welding, painting, and assembly are balanced to ensure smooth flow
Types of muda in production engineering include overproduction, waiting, transportation, processing, inventory, motion, and defects.
Overproduction: Producing more than needed, leading to waste of resources.
Waiting: Delays in production due to inefficient processes or lack of coordination.
Transportation: Unnecessary movement of materials or products, increasing lead time.
Processing: Unnecessary steps or complex processe...
I appeared for an interview in Aug 2024.
based on 16 reviews
Rating in categories
Trainee
123
salaries
| ₹1.4 L/yr - ₹3.5 L/yr |
Assistant Engineer
79
salaries
| ₹2 L/yr - ₹9 L/yr |
Production Engineer
58
salaries
| ₹1.8 L/yr - ₹10.5 L/yr |
Senior Engineer
51
salaries
| ₹7.7 L/yr - ₹18 L/yr |
Diploma Trainee Engineer
43
salaries
| ₹1.9 L/yr - ₹4 L/yr |
Amazon Transportation Services
Landmark Group
McDonald's
JCB