Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by UltraTech Cement Team. If you also belong to the team, you can get access from here

UltraTech Cement Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

UltraTech Cement Power Plant Operations Engineer Interview Questions and Answers

Updated 2 Jun 2025

UltraTech Cement Power Plant Operations Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. Dcs desk Operation in turbine
  • Ans. 

    DCS desk operation in turbines involves monitoring, controlling, and optimizing turbine performance through a digital control system.

    • DCS (Distributed Control System) allows real-time monitoring of turbine parameters like temperature, pressure, and speed.

    • Operators can adjust setpoints for optimal performance, such as increasing steam flow to enhance power output.

    • Alarms and alerts are configured to notify operators of an...

  • Answered by AI
  • Q2. Operation in WHRS Power Plant
  • Ans. 

    WHRS Power Plant utilizes waste heat recovery to generate electricity efficiently, enhancing overall energy efficiency.

    • Waste Heat Recovery Systems (WHRS) capture excess heat from processes, such as exhaust gases from turbines.

    • Example: In a gas turbine power plant, WHRS can recover heat from the exhaust to produce steam for a steam turbine.

    • Improves overall efficiency by utilizing heat that would otherwise be wasted, oft...

  • Answered by AI
  • Q3. Afbc boiler Operation in dcs
  • Ans. 

    AFBC boilers utilize air fluidized bed combustion for efficient fuel burning and emissions control, monitored via DCS.

    • AFBC stands for Atmospheric Fluidized Bed Combustion, which enhances combustion efficiency.

    • DCS (Distributed Control System) allows for real-time monitoring and control of boiler operations.

    • Key parameters monitored include bed temperature, air flow rate, and fuel feed rate.

    • Example: Adjusting the air flow...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please offering the job

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about UltraTech Cement?
Ask anonymously on communities.

Interview questions from similar companies

I appeared for an interview in Jul 2020.

Interview Questionnaire 

1 Question

  • Q1. Process parameters, fan flow calculation quality related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Aware about mill specifications
Process parameters flow calculation etc.

Power Plant Operations Engineer Interview Questions Asked at Other Companies

Q1. How many types of circuit breakers are there?
Q2. Transformers working principle
Q3. Describe your experience with turbine shutdown procedures.
Q4. Power plant turbine operation
Q5. Transformer total detail

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Past Experience as stated on my resume.
  • Ans. 

    I have over 10 years of experience in software engineering, focusing on full-stack development and team leadership.

    • Led a team of 5 engineers in developing a scalable e-commerce platform, resulting in a 30% increase in sales.

    • Implemented CI/CD pipelines that reduced deployment time by 50%, enhancing team productivity.

    • Worked on a healthcare application that improved patient data management, ensuring compliance with HIPAA ...

  • Answered by AI
  • Q2. Different maintenance related problems faced and solutions provided
  • Ans. 

    Maintenance problems and solutions

    • Equipment breakdowns - regular maintenance checks and repairs

    • Lack of spare parts - inventory management and ordering in advance

    • Inefficient processes - process optimization and automation

    • Safety hazards - regular safety inspections and training

    • Environmental concerns - proper disposal of hazardous waste

    • Budget constraints - prioritization and cost-effective solutions

  • Answered by AI
  • Q3. Project related in depth questions on domain of my working as stated iny resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Be energetic and simply tell how you faced the problems or steps done for erection of particular equipment as stated in the resume.
Be confident and do not over explain as all of the persons taking interviews in JSW Cement are rich in experience of their domain.

Interview Questionnaire 

3 Questions

  • Q1. Tell me about urself,
  • Q2. Site related questions like silo slip form details, piling details.
  • Q3. Achievements in short
  • Ans. 

    Led multiple successful projects, enhancing system performance and team collaboration, resulting in significant cost savings.

    • Implemented a new microservices architecture that improved system scalability by 40%.

    • Spearheaded a cross-functional team to reduce deployment time from weeks to days, increasing productivity.

    • Developed a predictive maintenance system that decreased downtime by 30%, saving the company $200,000 annu...

  • Answered by AI

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mechanical maintenance, project related, erection procedures

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview will be on core related topics
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Jan 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Cement test , cement manufacturers
Round 2 - Aptitude Test 

Technical, English, reasoning

Round 3 - One-on-one 

(1 Question)

  • Q1. Design mix, types of cracks
Round 4 - HR 

(1 Question)

  • Q1. Market potential
  • Ans. 

    The market potential for the Senior Engineer role is high due to increasing demand for skilled professionals in the industry.

    • Growing demand for senior engineers in various industries

    • Increasing adoption of technology and digital transformation

    • Emerging markets and new opportunities

    • Expanding job market and career growth prospects

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Civil work related
  • Q2. Work experience
  • Ans. 

    I have over 10 years of experience in software engineering, focusing on system architecture and team leadership.

    • Led a team of 5 engineers in developing a scalable microservices architecture for a financial application, improving performance by 30%.

    • Implemented CI/CD pipelines that reduced deployment times from hours to minutes, enhancing team productivity.

    • Mentored junior engineers, resulting in a 20% increase in team ef...

  • Answered by AI
Are these interview questions helpful?

I applied via Walk-in and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related jobs and my resume
Round 3 - HR 

(1 Question)

  • Q1. Based on facilities and annual package

Interview Preparation Tips

Interview preparation tips for other job seekers - See my updated resume and find out related jobs for my based carrier opportunity.and my developed knowledge and skills for better experience
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Job profile Pyro section project and matinance

I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Project related question

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Rajeev Malik with over 5.2 years of work experience in construction industry.As a dynamic professional I have worked on Industrial and Residential projects of Indianstandards as a Client & Contractor have in depth knowledge of project development ,rightfrom execution stage till commissioning stage.I am well versed with construction procedures & methodologies of these sectors andworked on industry recognized project software’s as a tool to implement the constructionprocess. My job profile is suitable for a Site Incharge including Structure Engineer.On an academic front I am a Civil Engineer with B.tech from GLA University of technology & management Mathura 2017.I am well versed with all the MS office software’s ,AutoCAD .Iwould appreciate an opportunity to discuss my qualifications is suitable for applied post. Iamc omfortable to work with different community with different language of skills.

UltraTech Cement Interview FAQs

What are the top questions asked in UltraTech Cement Power Plant Operations Engineer interview?

Some of the top questions asked at the UltraTech Cement Power Plant Operations Engineer interview -

  1. Operation in WHRS Power Pl...read more
  2. Dcs desk Operation in turb...read more
  3. Afbc boiler Operation in ...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3/5

based on 1 interview experience

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

JK Cement Interview Questions
4.1
 • 297 Interviews
Grasim Industries Interview Questions
4.0
 • 230 Interviews
Shree Cement Interview Questions
3.8
 • 175 Interviews
JSW Cement Interview Questions
4.1
 • 112 Interviews
Kohler Interview Questions
3.6
 • 63 Interviews
View all
UltraTech Cement Power Plant Operations Engineer Salary
based on 4 salaries
₹3.9 L/yr - ₹6.7 L/yr
38% more than the average Power Plant Operations Engineer Salary in India
View more details
Assistant Manager
949 salaries
unlock blur

₹5.4 L/yr - ₹17.2 L/yr

Senior Engineer
555 salaries
unlock blur

₹4.5 L/yr - ₹13 L/yr

Assistant Engineer
399 salaries
unlock blur

₹2.8 L/yr - ₹9.6 L/yr

Assistant Officer
395 salaries
unlock blur

₹3.3 L/yr - ₹9 L/yr

Engineer
386 salaries
unlock blur

₹3.5 L/yr - ₹11 L/yr

Explore more salaries
Compare UltraTech Cement with

JK Cement

4.1
Compare

Grasim Industries

4.0
Compare

Shree Cement

3.8
Compare

Dalmia Bharat Cement

4.0
Compare
write
Share an Interview