i
Viatris
Work with us
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
A positive displacement pump moves fluid by trapping a fixed amount and forcing it into the discharge pipe.
Operates by creating a vacuum to draw fluid in and then displacing it out.
Common types include gear pumps, diaphragm pumps, and piston pumps.
Used in applications requiring precise flow rates, such as hydraulic systems.
Examples: gear pumps in automotive oil systems, diaphragm pumps in chemical processing.
A PID controller is a control loop feedback mechanism widely used in industrial control systems.
PID stands for Proportional, Integral, and Derivative, which are the three control actions.
Proportional control adjusts the output proportionally to the error (difference between desired and actual value).
Integral control accumulates past errors to eliminate steady-state error.
Derivative control predicts future errors b...
Good engineering practices ensure quality, efficiency, and sustainability in technical projects and processes.
Code Reviews: Regularly reviewing code with peers to catch bugs and improve code quality.
Version Control: Using systems like Git to track changes and collaborate effectively.
Automated Testing: Implementing unit tests and integration tests to ensure code reliability.
Documentation: Maintaining clear and comp...
Clean rooms are controlled environments classified by the level of cleanliness and contamination control required for specific applications.
ISO Classifications: Clean rooms are classified according to ISO standards, such as ISO 1 (most stringent) to ISO 9 (least stringent).
Controlled Environment: Clean rooms can be further categorized into controlled environments like pharmaceutical clean rooms, semiconductor clea...
Validation ensures data accuracy and quality through various methods, crucial in software development and data management.
Input Validation: Ensures user input meets specified criteria, e.g., checking if an email address is in the correct format.
Data Validation: Confirms that data is accurate and meaningful, such as verifying that a date of birth is a valid date.
Schema Validation: Checks if data conforms to a defin...
Project management tools help streamline planning, execution, and monitoring of projects for better efficiency and collaboration.
Project Management Software: Tools like Asana, Trello, and Microsoft Project help in task assignment and tracking progress.
Collaboration Tools: Slack and Microsoft Teams facilitate communication among team members, enhancing collaboration.
Time Tracking Tools: Tools like Toggl and Harvest...
The organization has a hierarchical structure with clear reporting lines and departments.
The organization is divided into departments such as production, quality control, and maintenance.
Each department has a manager who reports to the Manufacturing Manager.
There are clear communication channels and reporting lines within the organization.
The Manufacturing Manager oversees the overall operations and ensures coordi...
Stability conditions refer to the factors that contribute to the overall stability of a system or organization.
Stability conditions can include financial stability, political stability, and social stability.
In a business context, stability conditions may involve having a strong leadership team, a solid customer base, and a diversified product line.
For a government, stability conditions could include a stable econo...
Line clearance is the process of ensuring that a production line is free from any previous product or material before starting a new production run.
Ensure all equipment is clean and sanitized before starting a new production run
Verify that all materials and ingredients are correct and properly labeled
Check that all previous product residue is removed from the production line
Confirm that all necessary quality check...
OOS flow refers to the out of stock flow in retail operations.
OOS flow occurs when a product is not available for purchase due to being out of stock.
It is important for retailers to manage OOS flow effectively to avoid losing sales and customer dissatisfaction.
Strategies to address OOS flow include improving inventory management, implementing automated restocking systems, and setting up alerts for low stock levels...
I appeared for an interview in Feb 2025.
2 hours, then telephonic and physical interviews with different stake holders.
I applied via Walk-in
I applied via Campus Placement and was interviewed in Aug 2024. There were 2 interview rounds.
It was great and almost based on IQ questions...
I applied via Gmail I'd and was interviewed in Apr 2024. There was 1 interview round.
I assess the level of risk, develop a plan to mitigate it, and communicate with stakeholders.
Identify the source and potential impact of the risk
Analyze the likelihood of the risk occurring
Develop a plan to mitigate or manage the risk
Communicate with stakeholders about the risk and the plan
Monitor the risk throughout the project or process
If I come across a perfect match, I would carefully evaluate the situation and consider the potential benefits and drawbacks before making a decision.
Evaluate the qualifications and fit of the candidate or opportunity
Consider the potential benefits and drawbacks of the match
Consult with colleagues or superiors for input
Make a decision based on the overall assessment
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
I am a dedicated and experienced operator with a strong background in customer service and technical skills.
Over 5 years of experience in operating machinery and equipment
Skilled in troubleshooting and problem-solving
Excellent communication and teamwork abilities
Certified in operating forklifts and other heavy machinery
I chose this company because of its strong reputation, innovative projects, and opportunities for growth.
Strong reputation in the industry
Innovative projects that align with my interests and skills
Opportunities for career growth and development
Positive company culture and values
Recommendation from current employees
Good engineering practices ensure quality, efficiency, and sustainability in technical projects and processes.
Code Reviews: Regularly reviewing code with peers to catch bugs and improve code quality.
Version Control: Using systems like Git to track changes and collaborate effectively.
Automated Testing: Implementing unit tests and integration tests to ensure code reliability.
Documentation: Maintaining clear and comprehen...
A PID controller is a control loop feedback mechanism widely used in industrial control systems.
PID stands for Proportional, Integral, and Derivative, which are the three control actions.
Proportional control adjusts the output proportionally to the error (difference between desired and actual value).
Integral control accumulates past errors to eliminate steady-state error.
Derivative control predicts future errors based ...
A positive displacement pump moves fluid by trapping a fixed amount and forcing it into the discharge pipe.
Operates by creating a vacuum to draw fluid in and then displacing it out.
Common types include gear pumps, diaphragm pumps, and piston pumps.
Used in applications requiring precise flow rates, such as hydraulic systems.
Examples: gear pumps in automotive oil systems, diaphragm pumps in chemical processing.
I have developed leadership, communication, and analytical skills through diverse roles in management and team collaboration.
Leadership: Managed a team of 15, improving productivity by 20% through effective delegation and motivation.
Communication: Facilitated cross-departmental meetings, enhancing collaboration and reducing project turnaround time by 30%.
Analytical Skills: Conducted market analysis that informed strate...
Top trending discussions
Some of the top questions asked at the Viatris interview -
The duration of Viatris interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 155 interview experiences
Difficulty level
Duration
based on 3.4k reviews
Rating in categories
Bangalore / Bengaluru
2-5 Yrs
₹ 4.4-6.8 LPA
Executive
1k
salaries
| ₹5 L/yr - ₹10.4 L/yr |
Assistant Manager
992
salaries
| ₹7.6 L/yr - ₹13.5 L/yr |
Officer
864
salaries
| ₹3.6 L/yr - ₹7.7 L/yr |
Deputy Manager
582
salaries
| ₹10.9 L/yr - ₹20 L/yr |
Senior Associate
465
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Cipla
Dr. Reddy's
Lupin
Zydus Lifesciences