Deputy Project Manager
70+ Deputy Project Manager Interview Questions and Answers

Asked in Aarvee Associates

Q. If contractors are not compliant with specifications, what actions would you take?
Take appropriate action against contractors not complying with specifications.
Identify the specific non-compliance issues
Communicate the non-compliance to the contractors
Request corrective actions or modifications to meet the specifications
Monitor and document the progress of corrective actions
Consider penalties or contract termination if non-compliance persists

Asked in Aarvee Associates

Q. How do you check the quality of work during inspection?
Quality inspection involves systematic checks to ensure project standards are met, enhancing reliability and performance.
Conduct regular site inspections to assess workmanship against project specifications.
Utilize checklists to verify compliance with quality standards, such as safety regulations.
Implement testing protocols, like material sampling, to ensure materials meet required specifications.
Engage third-party inspectors for unbiased evaluations, especially for critical ...read more
Deputy Project Manager Interview Questions and Answers for Freshers

Asked in Worley

Q. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is finalised? Various standards for oil & gas ?...
read moreFEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.
FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.
Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.
SIL (Safety Integrity Level) is a measure of the effectiveness of safety systems in reducin...read more

Asked in Auro Realty Private Limited

Q. Work experience in Depillaring with continuous miner project, using method of fish & bone, nevid method, their strata monitoring instrument used, and follow up for safety precautions to handled the situation....
read moreDepillaring work experience with continuous miner project using fish & bone, nevid method, strata monitoring instruments, and safety precautions.
I have worked on depillaring projects using continuous miner and fish & bone method.
I am familiar with the nevid method and have used it in my work experience.
I have experience using strata monitoring instruments to ensure safety during depillaring.
I always follow safety precautions and protocols to ensure a safe working environment....read more

Asked in Spar Geo Infra

Q. What is your area of specialization?Define water cement ratio?Calculation of BOQ quantity?
I specialize in construction management.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
BOQ quantity refers to the Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
Calculation of BOQ quantity involves estimating the quantities of materials needed for a project based on the project's design and specifications.

Asked in JSW Steel

Q. Are you comfortable with electrical drawings and layouts?
Yes, I am proficient in reading and interpreting electrical drawings and layouts.
I have experience in reviewing and understanding electrical drawings and layouts
I am familiar with symbols, schematics, and diagrams commonly used in electrical engineering
I have successfully implemented projects based on electrical drawings and layouts
I can identify potential issues or improvements in electrical designs
Deputy Project Manager Jobs




Asked in ARSS Infrastructure Projects

Q. Using a bitumen extractor machine, how much prime coat is spread over WMM per square meter?
The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.
The quantity of prime coat depends on the type of bitumen extractor machine used
It is important to follow the manufacturer's instructions for the specific machine being used
Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed
Typically, the quantity of prime coat used ranges from 0.8 to 1.2 liters per sq. mt.
Regu...read more

Asked in S V S Projects India

Q. How many cycling days are scheduled for slab casting, and what are the details?
The number of cycling days scheduled for slab casting varies depending on the project timeline and size of the slabs.
Cycling days for slab casting can range from 1 to 5 days per slab, depending on the size and complexity of the slab.
Factors such as weather conditions, equipment availability, and workforce efficiency can also impact the number of cycling days.
For example, a smaller slab may only require 1-2 cycling days, while a larger and more complex slab may require 4-5 cyc...read more
Share interview questions and help millions of jobseekers 🌟

Asked in Archen Design

Q. Test of Slump cone and size , difference between centering and shuttering, steel test procedure, and process of ATT
The question covers topics related to testing procedures and construction processes.
Slump cone test measures the consistency of concrete mix.
Centering is the temporary support structure used during construction, while shuttering is the process of creating a mold for concrete.
Steel test procedure involves checking the quality and strength of steel used in construction.
ATT (Acceptance Test Procedure) is a process used to ensure that the construction project meets the required s...read more

Asked in Desire Energy Solution

Q. What are the details of mix design for water-retaining structures and what precautions should be taken during construction?
Mix design for water-retaining structures ensures durability and impermeability, requiring specific materials and construction practices.
Use of low permeability concrete to prevent water leakage, typically with a water-cement ratio of 0.4 or lower.
Incorporation of additives like silica fume or fly ash to enhance strength and reduce porosity.
Proper curing methods to maintain moisture and temperature, ensuring optimal hydration of the concrete.
Use of waterproofing membranes or ...read more

Asked in ARSS Infrastructure Projects

Q. How much tack coat is used over GSB per square meter, as measured by a bitumen extractor machine?
The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.
The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.
The type of bitumen extractor machine used can affect the quantity of tack coat used.
The thickness of the GSB layer can also impact the quantity of tack coat used.
Weather conditions such as temperature and humidity can aff...read more

Asked in Gannon Dunkerley & Co.

Q. Are you comfortable working with people who speak Tamil, Telugu, Malayalam, and Kannada?
Yes, I can work with Tamil, Telugu, Malayalam, and Kannada speaking people in the organization.
I have experience working with diverse teams and have developed communication skills to effectively collaborate with people from different backgrounds.
I am also willing to learn and adapt to new languages and cultures to ensure smooth communication and teamwork.
For example, in my previous job, I worked with a team that included members who spoke Tamil and Kannada, and I made an effo...read more

Asked in ARSS Infrastructure Projects

Q. Which factor is most important when designing rigid pavement?
The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.
Traffic load and volume
Subgrade soil conditions
Climate and weather conditions
Concrete mix design
Joint spacing and layout

Asked in ARSS Infrastructure Projects

Q. Required compaction as per MORTH of dry lean concrete
The required compaction for dry lean concrete is specified by MORTH.
MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.
The compaction factor for dry lean concrete should be between 0.78 to 0.82.
The compaction should be done using a plate vibrator or a needle vibrator.
The required compaction can vary depending on the type of dry lean concrete being used.
Proper compaction is important to ensure the strength and durability of the dry lean ...read more
Asked in Ganesh Electricals

Q. How much time will it take to commission a 4 MWp solar GCRTSPP?
The time required to commission 4Mwp solar GCRTSPP depends on various factors such as site preparation, equipment availability, and weather conditions.
The site preparation work needs to be completed before the installation of solar panels can begin.
The availability of equipment such as solar panels, inverters, and transformers can affect the commissioning time.
Weather conditions such as rain or snow can delay the installation and commissioning process.
The experience and exper...read more

Asked in Desire Energy Solution

Q. What are the different types of pipes used in water supply projects?
Various pipes are used in water supply projects, each with unique properties and applications for efficient water distribution.
PVC (Polyvinyl Chloride) pipes: Lightweight, corrosion-resistant, commonly used for residential water supply.
HDPE (High-Density Polyethylene) pipes: Flexible, durable, suitable for underground installations and high-pressure applications.
Ductile Iron pipes: Strong and resilient, often used for large-scale municipal water systems.
Copper pipes: Excellen...read more

Asked in Desire Energy Solution

Q. What are the safety regulations and precautions that should be followed at a construction site?
Safety regulations at construction sites ensure worker protection and compliance with legal standards to prevent accidents and injuries.
Use personal protective equipment (PPE) such as helmets, gloves, and safety goggles to protect workers from hazards.
Implement fall protection measures, like guardrails and safety nets, especially when working at heights.
Conduct regular safety training sessions to educate workers about potential hazards and emergency procedures.
Ensure proper s...read more

Asked in Desire Energy Solution

Q. What is the reason of honeycomb and what is the procedure for its repair?
Honeycomb refers to voids in concrete, often due to improper placement or curing, requiring specific repair methods.
Honeycomb occurs when air pockets are trapped in concrete during pouring.
Common causes include inadequate vibration, poor mix design, or premature curing.
Repair involves cleaning the area, applying a bonding agent, and filling with a suitable repair mortar.
For example, using epoxy-based repair compounds can enhance durability.
Inspection is crucial to assess the ...read more

Asked in L&T Construction

Q. Cost to complition of project getting delay .how to make profite to company
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing or discounts to reduce costs.
Consider outsourcing certain t...read more

Asked in Nagarjuna Construction Company

Q. What is the process of making concrete?
Processing of concrete involves mixing cement, water, and aggregates to create a strong and durable material.
Mixing cement, water, and aggregates in specific proportions
Pouring the mixture into molds or forms
Allowing the concrete to cure and harden over time
Finishing the surface of the concrete with tools or coatings
Testing the strength and durability of the finished product
Asked in Pushti Infrastructure

Q. Can you create an excess/saving statement of our bill quantity based on our material consumption?
Analyzing bill quantities against material consumption helps identify savings and excesses in project management.
Track material usage against initial estimates to identify discrepancies.
Example: If 100 units of cement were estimated but only 80 were used, this indicates a saving of 20 units.
Regularly update the bill of quantities to reflect actual consumption for accurate forecasting.
Example: If a project initially estimated 500 bricks but only used 450, adjust future estimat...read more
Asked in Sujan Contitech Avs

Q. What are the important deliverables in Project Management?
Important deliverables in Project Management include project charter, project plan, status reports, and final project deliverables.
Project charter: outlines project objectives, scope, and stakeholders.
Project plan: details tasks, timelines, resources, and budget.
Status reports: provide updates on project progress and any issues.
Final project deliverables: the end result or product of the project.

Asked in Desire Energy Solution

Q. How does the water-cement ratio affect the strength of concrete?
The water-cement ratio is crucial for determining concrete's strength and durability, influencing its overall performance.
Lower water-cement ratio (e.g., 0.4) leads to higher strength and durability.
Higher water-cement ratio (e.g., 0.6) results in weaker concrete, increasing porosity.
Optimal ratio for most structural concrete is around 0.5.
Excess water can cause segregation and reduce bond strength between aggregates.
Concrete with a low water-cement ratio may require superpla...read more

Asked in Desire Energy Solution

Q. What are the best practices for labor control and deployment?
Effective labor control and deployment optimize resources, enhance productivity, and ensure project success through strategic planning.
1. Detailed Planning: Create a comprehensive labor plan that outlines roles, responsibilities, and timelines. For example, using Gantt charts to visualize tasks.
2. Resource Allocation: Assign the right number of workers to tasks based on skill sets and project needs. For instance, deploying specialized technicians for complex tasks.
3. Monitori...read more

Asked in Desire Energy Solution

Q. What is the construction cost of a typical overhead tank?
The construction cost of a typical overhead tank varies based on size, materials, and location.
Cost typically ranges from $50 to $200 per cubic meter.
A 100,000-liter tank may cost between $50,000 to $200,000.
Factors influencing cost include site preparation, materials (concrete vs. steel), and labor.
Additional costs may arise from permits, inspections, and utility connections.

Asked in Desire Energy Solution

Q. What is the typical construction period for an overhead tank?
The construction period for an overhead tank typically ranges from 3 to 6 months, depending on various factors.
Site preparation and foundation work usually take 2-4 weeks.
The tank structure can take 1-3 months to complete, depending on size.
Installation of piping and fittings may require an additional 2-4 weeks.
Weather conditions can impact the timeline significantly, causing delays.
For example, a small tank may be completed in 3 months, while a large one could take up to 6 m...read more

Asked in Shapoorji Pallonji Group

Q. What do you know about waterproofing toilet areas?
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Proper surface preparation, including cleaning, leveling, an...read more

Asked in Nagarjuna Construction Company

Q. Characteristics of concrete+1.65times and standard deviations
Concrete+1.65 times standard deviation refers to the strength of concrete at a certain level of confidence.
Concrete strength is measured in psi or MPa
Standard deviation is a measure of the variability of the strength test results
The higher the standard deviation, the more variable the test results
The 1.65 factor is used to determine the minimum strength required for a certain level of confidence
For example, a concrete mix with a strength of 4000 psi and a standard deviation o...read more

Asked in Shri Bhagwati Machines Pvt. Ltd.

Q. How do you manage cost in inline manufacturing?
Cost management in inline manufacturing involves optimizing processes, reducing waste, and negotiating with suppliers.
Implementing lean manufacturing principles to reduce waste and improve efficiency
Negotiating with suppliers to get the best prices for materials and components
Regularly monitoring and analyzing costs to identify areas for improvement
Utilizing cost estimation tools and software to accurately predict expenses
Collaborating with cross-functional teams to ensure co...read more

Asked in GVPR Engineers

Q. How do you maintain safety and quality at a project site?
Safety and quality in project site are maintained through strict adherence to protocols and standards.
Establishing clear safety and quality guidelines
Providing regular training to workers on safety and quality protocols
Conducting regular inspections and audits to ensure compliance
Using appropriate safety equipment and tools
Encouraging workers to report any safety or quality concerns
Taking immediate action to address any safety or quality issues
Documenting all safety and quali...read more
Interview Questions of Similar Designations
Interview Experiences of Popular Companies






Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary


Reviews
Interviews
Salaries
Users