i
AGI
Glaspac
Filter interviews by
I appeared for an interview in Nov 2024, where I was asked the following questions.
Understanding motor ratings, cable sizes, and contactor specifications is crucial for electrical installations.
Motor ratings are typically expressed in horsepower (HP) or kilowatts (kW). For example, a 5 HP motor requires specific cable sizing.
Cable size is determined by the current rating of the motor. For instance, a 5 HP motor at 230V may require a 10 AWG cable.
Contactor size should be rated for the motor's full loa...
The HT yard (33KV station) consists of various components for efficient power distribution and safety management.
The yard includes transformers that step down voltage for distribution.
Circuit breakers are installed for protection against overloads and faults.
Busbars are used to connect multiple circuits and facilitate power flow.
Isolators ensure safe maintenance by disconnecting sections of the system.
Earthing systems ...
Top trending discussions
I possess strong communication, adaptability, and team-building skills, fostering collaboration and driving results.
Effective Communication: I ensure clarity in conveying goals and expectations, which helps in aligning the team towards common objectives.
Adaptability: I can adjust my leadership style based on team dynamics and project requirements, ensuring optimal performance.
Team Building: I focus on creating a positi...
Negotiated a 20% discount on a bulk order of office supplies.
Identified the need for a large order of office supplies
Researched prices from multiple vendors
Used data to negotiate a 20% discount with the chosen vendor
Ensured timely delivery of the supplies
I applied via Campus Placement and was interviewed before May 2023. There were 2 interview rounds.
Aptitude test was similar to Management Exams/ CAT.
Project Management involves planning, organizing, and overseeing the completion of a project within specific constraints.
CPM stands for Critical Path Method, a project management technique used to determine the longest sequence of dependent tasks and the shortest time needed to complete a project.
PERT stands for Program Evaluation and Review Technique, a project management tool used to analyze and represent the tasks i...
I applied via Company Website and was interviewed before Nov 2023. There were 2 interview rounds.
Dynamic professional with 5 years of experience in management, skilled in team leadership and project execution.
Background in business administration with a focus on management.
Led a team of 10 in a successful project that increased sales by 20%.
Strong communication skills, facilitating effective collaboration across departments.
Passionate about mentoring and developing team members for career growth.
Handled a case involving shipment delays due to customs issues and coordinated with various stakeholders to resolve the challenges.
Coordinated with customs officials to understand the root cause of delays
Worked closely with the logistics team to expedite the shipment process
Communicated regularly with the client to provide updates and manage expectations
Questions related to export import operations
I appeared for an interview before Apr 2024, where I was asked the following questions.
The export process involves several steps to send goods from one country to another, ensuring compliance and logistics management.
Market Research: Identify potential markets for your product, e.g., exporting electronics to Europe.
Documentation: Prepare necessary documents like commercial invoices and export licenses.
Logistics: Arrange transportation, choosing between air, sea, or land freight based on cost and urgency.
...
posted on 25 Jun 2024
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Methods to prevent corrosion of railway tracks include regular inspection, painting, cathodic protection, and using corrosion-resistant materials.
Regular inspection of tracks to identify and address corrosion early
Painting the tracks with corrosion-resistant coatings
Applying cathodic protection to prevent corrosion
Using corrosion-resistant materials in track construction
Implementing proper drainage systems to prevent w...
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Relocation to a new area
Company downsizing or restructuring
Conflict with management or colleagues
I can join within 2 weeks of receiving a formal offer.
I will need to provide a notice period to my current employer.
I may need time to relocate if the job is in a different city.
I will need to finalize any pending commitments before joining.
I can start the onboarding process as soon as possible to expedite the joining date.
Some of the top questions asked at the AGI Glaspac Assistant Engineer Officer interview -
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Assistant Engineer
59
salaries
| ₹2.9 L/yr - ₹5.5 L/yr |
Junior Engineer
40
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Engineer
32
salaries
| ₹4.4 L/yr - ₹9 L/yr |
Senior Engineer
17
salaries
| ₹6.5 L/yr - ₹11 L/yr |
Assistant Manager
16
salaries
| ₹9 L/yr - ₹14.5 L/yr |
Uflex
Huhtamaki
EPL Limited
Manjushree Technopack