An Environmental Health and Safety Lead was asked
Q. What checking mechanism is used to detect residual leakage current?
Ans. 

The checking mechanism for residual leakage current involves using a ground fault circuit interrupter (GFCI) or a leakage current tester.

  • A GFCI can detect and interrupt leakage current by comparing the amount of current flowing into and out of a circuit.

  • A leakage current tester measures the amount of current flowing through a circuit and compares it to a predetermined threshold.

  • Regular testing and maintenance of e...

An Environmental Health and Safety Lead was asked
Q. What do you mean by Megger process?
Ans. 

Meggar process is a method used to measure the insulation resistance of electrical equipment.

  • Meggar process involves applying a high voltage DC current to the equipment and measuring the resulting insulation resistance.

  • It is commonly used in the maintenance and testing of electrical equipment to ensure safety and reliability.

  • The results of the meggar process can indicate if there are any faults or defects in the i...

Environmental Health and Safety Lead Interview Questions Asked at Other Companies

Q1. 1. What are the Fire NOC conditions? 14. 15. 16. 17. 18. 19.
Q2. What type of fire extinguisher is required as per the factory act ... read more
Q3. After Lockout/Tagout (LOTO) or isolation of electrical energy, wh ... read more
Q4. What height work equipment is used for working at height?
Q5. When working at height, what should be the minimum height for a s ... read more
An Environmental Health and Safety Lead was asked
Q. After Lockout/Tagout (LOTO) or isolation of electrical energy, what mechanism is used to verify that electrical energy isolation is complete?
Ans. 

After LOTO or isolation of electrical energy, a mechanism must be used to check whether electrical energy isolation has been done or not.

  • Visual inspection of the equipment to ensure that it is not energized

  • Use of a voltage tester to check for the presence of electrical energy

  • Verification of the LOTO or isolation tag

  • Testing the equipment to ensure that it is not operational

  • Communication with other workers to ensure...

An Environmental Health and Safety Lead was asked
Q. What height work equipment is used for working at height?
Ans. 

Height work equipment includes ladders, scaffolds, aerial lifts, and fall protection systems.

  • Ladders: used for low height work

  • Scaffolds: used for medium height work

  • Aerial lifts: used for high height work

  • Fall protection systems: used to prevent falls from height

  • Examples: extension ladders, rolling scaffolds, scissor lifts, harnesses, guardrails

An Environmental Health and Safety Lead was asked
Q. What material lifting equipment is used in the warehouse?
Ans. 

Various material lifting equipment are used in warehouses depending on the type of material and its weight.

  • Forklifts are commonly used for heavy loads

  • Pallet jacks are used for moving pallets

  • Hand trucks are used for smaller loads

  • Conveyor belts are used for continuous movement of materials

  • Hoists and cranes are used for lifting heavy equipment

  • Scissor lifts are used for lifting workers to higher levels

  • Loading dock lev...

An Environmental Health and Safety Lead was asked
Q. What are the legal compliance requirements for mechanical materials lifting equipment?
Ans. 

Legal compliance for mechanical materials lifting equipment include OSHA regulations, ANSI standards, and manufacturer guidelines.

  • OSHA regulations require regular inspections and maintenance of lifting equipment.

  • ANSI standards provide guidelines for the design, construction, and testing of lifting equipment.

  • Manufacturer guidelines must be followed for proper use and maintenance of specific equipment.

  • Compliance wit...

Alstom Transportation HR Interview Questions

76 questions and answers

Q. What is your reason for changing jobs?
Q. Can you define your previous work experience?
Q. Briefly describe your past experience.
An Environmental Health and Safety Lead was asked
Q. What is the load center for a lifting operation?
Ans. 

Load center is the point where the weight of the load is concentrated during lifting operation.

  • It is the point where the weight of the load is concentrated

  • It is important to know the load center to ensure safe lifting operation

  • The load center varies depending on the shape and size of the load

  • Incorrect load center calculation can lead to accidents and injuries

Are these interview questions helpful?
An Environmental Health and Safety Lead was asked
Q. If the radius increases, does the load lifting capacity increase or decrease?
Ans. 

Load lifting capacity decreases as radius increases.

  • The load lifting capacity is inversely proportional to the radius.

  • As the radius increases, the load lifting capacity decreases.

  • This is because the load moment arm increases with radius, making it harder to lift the load.

  • For example, a crane with a longer boom has a lower load lifting capacity than a crane with a shorter boom.

An Environmental Health and Safety Lead was asked
Q. Who is responsible for Fire NOC and CTO compliance?
Ans. 

Fire NOC & CTO compliance is done by the local fire department and pollution control board respectively.

  • Fire NOC compliance is done by the local fire department.

  • CTO compliance is done by the pollution control board.

  • Both compliances are mandatory for any organization to operate.

  • The process involves inspection of the premises and ensuring all safety measures are in place.

  • Non-compliance can result in penalties and ev...

An Environmental Health and Safety Lead was asked
Q. What is the fire water tank capacity?
Ans. 

The fire water tank capacity is 50,000 gallons.

  • The fire water tank is used for emergency firefighting purposes.

  • It is important to regularly check and maintain the tank to ensure it is always ready for use.

  • The capacity of the tank may vary depending on the size and needs of the facility.

  • For example, a smaller facility may have a fire water tank with a capacity of 10,000 gallons.

  • On the other hand, a larger facility ...

Alstom Transportation Environmental Health and Safety Lead Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(20 Questions)

  • Q1. 1. What are the Fire NOC conditions? 14. 15. 16. 17. 18. 19.
  • Ans. 

    Fire NOC conditions are the set of requirements that a building or establishment must meet to obtain a No Objection Certificate for fire safety.

    • Fire NOC conditions include having adequate fire exits, fire alarms, fire extinguishers, and sprinkler systems.

    • The building must also have clear access for fire trucks and emergency personnel.

    • Regular fire drills and safety training for employees are also required.

    • Examples of Fi...

  • Answered by AI
  • Q2. 2. Fire NOC & CTO compliance done by whome?
  • Ans. 

    Fire NOC & CTO compliance is done by the local fire department and pollution control board respectively.

    • Fire NOC compliance is done by the local fire department.

    • CTO compliance is done by the pollution control board.

    • Both compliances are mandatory for any organization to operate.

    • The process involves inspection of the premises and ensuring all safety measures are in place.

    • Non-compliance can result in penalties and even cl...

  • Answered by AI
  • Q3. 3. What is the Fire water tank capacity?
  • Ans. 

    The fire water tank capacity is 50,000 gallons.

    • The fire water tank is used for emergency firefighting purposes.

    • It is important to regularly check and maintain the tank to ensure it is always ready for use.

    • The capacity of the tank may vary depending on the size and needs of the facility.

    • For example, a smaller facility may have a fire water tank with a capacity of 10,000 gallons.

    • On the other hand, a larger facility may h...

  • Answered by AI
  • Q4. 4. What Type of fire pump?
  • Q5. 5. What type Fire extinguisher requirement as per factory act? Light hazard, Ordinary hazard, High hazard
  • Ans. 

    Fire extinguisher requirements vary based on the hazard level of the workplace.

    • Light hazard workplaces require water, foam, or dry powder extinguishers.

    • Ordinary hazard workplaces require water, foam, dry powder, or carbon dioxide extinguishers.

    • High hazard workplaces require foam, dry powder, carbon dioxide, or specialized extinguishers such as halon or clean agent.

    • The specific requirements may vary by country and indus...

  • Answered by AI
  • Q6. 6. At what height fire extinguisher to be placed from the floor?
  • Ans. 

    Fire extinguishers should be placed at a height of 3.5 to 5 feet from the floor.

    • The ideal height for fire extinguishers is between 3.5 to 5 feet from the floor.

    • This ensures that the extinguisher is easily accessible in case of a fire.

    • The height should be adjusted based on the height of the ceiling and the size of the room.

    • Extinguishers should be mounted on brackets or in cabinets to prevent them from falling.

    • It is impo...

  • Answered by AI
  • Q7. 7. What are the Reason behind changes the job?
  • Q8. 8. Construction what kind of hazard and risk available?
  • Ans. 

    Construction hazards include falls, electrical hazards, noise, and exposure to hazardous materials.

    • Falls from heights or on slippery surfaces

    • Electrical hazards from exposed wires or faulty equipment

    • Noise exposure from heavy machinery and equipment

    • Exposure to hazardous materials such as asbestos, lead, and silica dust

    • Risk of fires and explosions from flammable materials and chemicals

    • Physical strain and injuries from lif...

  • Answered by AI
  • Q9. 9. At height work what should be the minimum height for safety harness anchor point?
  • Q10. 10. What are the height work equipment used for work at height?
  • Ans. 

    Height work equipment includes ladders, scaffolds, aerial lifts, and fall protection systems.

    • Ladders: used for low height work

    • Scaffolds: used for medium height work

    • Aerial lifts: used for high height work

    • Fall protection systems: used to prevent falls from height

    • Examples: extension ladders, rolling scaffolds, scissor lifts, harnesses, guardrails

  • Answered by AI
  • Q11. 11. What are the lifting safety requirements?
  • Ans. 

    Lifting safety requirements include proper technique, use of equipment, and weight limits.

    • Use proper lifting technique, such as bending at the knees and keeping the back straight

    • Use equipment such as lifting belts, back braces, and lifting straps when necessary

    • Know weight limits and do not exceed them

    • Ensure clear pathways and good visibility when moving heavy objects

    • Train employees on proper lifting techniques and safe...

  • Answered by AI
  • Q12. 12. Warehouse what are the material lifting equipment used?
  • Ans. 

    Various material lifting equipment are used in warehouses depending on the type of material and its weight.

    • Forklifts are commonly used for heavy loads

    • Pallet jacks are used for moving pallets

    • Hand trucks are used for smaller loads

    • Conveyor belts are used for continuous movement of materials

    • Hoists and cranes are used for lifting heavy equipment

    • Scissor lifts are used for lifting workers to higher levels

    • Loading dock levelers...

  • Answered by AI
  • Q13. 13. What are the legal compliance required for mechanical materials lifting equipment?
  • Ans. 

    Legal compliance for mechanical materials lifting equipment include OSHA regulations, ANSI standards, and manufacturer guidelines.

    • OSHA regulations require regular inspections and maintenance of lifting equipment.

    • ANSI standards provide guidelines for the design, construction, and testing of lifting equipment.

    • Manufacturer guidelines must be followed for proper use and maintenance of specific equipment.

    • Compliance with the...

  • Answered by AI
  • Q14. 14. What is load center for lifting Operation?
  • Ans. 

    Load center is the point where the weight of the load is concentrated during lifting operation.

    • It is the point where the weight of the load is concentrated

    • It is important to know the load center to ensure safe lifting operation

    • The load center varies depending on the shape and size of the load

    • Incorrect load center calculation can lead to accidents and injuries

  • Answered by AI
  • Q15. 15. If radius increase then load lifting capacity increase or decrease?
  • Ans. 

    Load lifting capacity decreases as radius increases.

    • The load lifting capacity is inversely proportional to the radius.

    • As the radius increases, the load lifting capacity decreases.

    • This is because the load moment arm increases with radius, making it harder to lift the load.

    • For example, a crane with a longer boom has a lower load lifting capacity than a crane with a shorter boom.

  • Answered by AI
  • Q16. 16. Electrical maintenance work safety precautions?
  • Q17. 17. What is the checking mechanism for presence of residual leakage current?
  • Ans. 

    The checking mechanism for residual leakage current involves using a ground fault circuit interrupter (GFCI) or a leakage current tester.

    • A GFCI can detect and interrupt leakage current by comparing the amount of current flowing into and out of a circuit.

    • A leakage current tester measures the amount of current flowing through a circuit and compares it to a predetermined threshold.

    • Regular testing and maintenance of electr...

  • Answered by AI
  • Q18. 18. What do you mean meggar process?
  • Ans. 

    Meggar process is a method used to measure the insulation resistance of electrical equipment.

    • Meggar process involves applying a high voltage DC current to the equipment and measuring the resulting insulation resistance.

    • It is commonly used in the maintenance and testing of electrical equipment to ensure safety and reliability.

    • The results of the meggar process can indicate if there are any faults or defects in the insula...

  • Answered by AI
  • Q19. 19. After LOTO or isolation of electrical energy , what is the mechanism to check whether electrical energy isolation done or not?
  • Ans. 

    After LOTO or isolation of electrical energy, a mechanism must be used to check whether electrical energy isolation has been done or not.

    • Visual inspection of the equipment to ensure that it is not energized

    • Use of a voltage tester to check for the presence of electrical energy

    • Verification of the LOTO or isolation tag

    • Testing the equipment to ensure that it is not operational

    • Communication with other workers to ensure that...

  • Answered by AI
  • Q20. 20. What will be the sureity that you will stay in the organisation for longer periods of time.
  • Ans. 

    I am committed to the organization's mission and values and see a long-term future here.

    • I have researched the company and believe in its goals and values

    • I am looking for stability and growth opportunities

    • I am willing to invest time and effort in developing my skills and contributing to the company's success

    • I am open to discussing career advancement and growth opportunities with my manager

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Alstom Transportation Environmental Health and Safety Lead interview:
  • Factory Act
  • Fire NOC
  • Work at height
  • Lifeting safety
  • Lifeting tools and tackle
  • Electrical safety
Interview preparation tips for other job seekers - Interviewer ask questions based on present and past job profile.

Top trending discussions

View All
Interview Hub
1w
a team lead
FeedCard Image
Got a question about Alstom Transportation?
Ask anonymously on communities.

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I appeared for an interview before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Computer aptitude test

Round 2 - HR 

(1 Question)

  • Q1. Tell about yourself and your interests what are your hobbies etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and be thorough in subject gained in graduation

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Please tell me about yourself
  • Ans. I have 15 years experience in Highways Structure activities etc.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Assistant Manager interview:
  • Technical skill
Interview preparation tips for other job seekers - It was good experience in first time I faced lnt Sr. staff

Alstom Transportation Interview FAQs

How many rounds are there in Alstom Transportation Environmental Health and Safety Lead interview?
Alstom Transportation interview process usually has 2 rounds. The most common rounds in the Alstom Transportation interview process are Resume Shortlist and Technical.
How to prepare for Alstom Transportation Environmental Health and Safety Lead interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Alstom Transportation. The most common topics and skills that interviewers at Alstom Transportation expect are EHS, Risk Assessment, EHS Management, Environment Health Safety and Industrial Safety.
What are the top questions asked in Alstom Transportation Environmental Health and Safety Lead interview?

Some of the top questions asked at the Alstom Transportation Environmental Health and Safety Lead interview -

  1. 1. What are the Fire NOC conditions? 14. 15. 16. 17. 18. ...read more
  2. 5. What type Fire extinguisher requirement as per factory act? Light hazard, Or...read more
  3. 19. After LOTO or isolation of electrical energy , what is the mechanism to che...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Larsen & Toubro Limited Interview Questions
3.9
 • 1.6k Interviews
Shapoorji Pallonji Group Interview Questions
4.1
 • 370 Interviews
Tata Technologies Interview Questions
3.5
 • 288 Interviews
Saint-Gobain Interview Questions
4.0
 • 188 Interviews
Dilip Buildcon Interview Questions
3.9
 • 162 Interviews
G R Infraprojects Interview Questions
4.1
 • 147 Interviews
AECOM Interview Questions
4.2
 • 129 Interviews
Worley Interview Questions
4.1
 • 121 Interviews
Power Mech Projects Interview Questions
3.8
 • 104 Interviews
View all

Alstom Transportation Environmental Health and Safety Lead Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

5.0

Salary

5.0

Job security

4.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Software Designer
501 salaries
unlock blur

₹5.9 L/yr - ₹21.7 L/yr

System Engineer
201 salaries
unlock blur

₹8.4 L/yr - ₹19.1 L/yr

Software Engineer
192 salaries
unlock blur

₹5.8 L/yr - ₹13.6 L/yr

Senior Software Engineer
192 salaries
unlock blur

₹11.9 L/yr - ₹20 L/yr

Team Lead
185 salaries
unlock blur

₹9.6 L/yr - ₹17.1 L/yr

Explore more salaries
Compare Alstom Transportation with

Larsen & Toubro Limited

3.9
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Technologies

3.5
Compare
write
Share an Interview