i
Larsen & Toubro
Limited
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
I have over five years of experience in management, focusing on team leadership, project coordination, and operational efficiency.
Led a team of 10 in a retail environment, improving sales by 20% through effective training and motivation.
Managed multiple projects simultaneously, ensuring timely delivery and adherence to budget constraints.
Implemented a new inventory management system that reduced waste by 15% and i...
Shree Cement's specific heat consumption is a critical metric for energy efficiency in cement production processes.
Energy Efficiency: Specific heat consumption measures the energy required to raise the temperature of the material, impacting overall energy costs.
Benchmarking: Shree Cement aims to maintain low specific heat consumption compared to industry standards, enhancing competitiveness.
Process Optimization: T...
Viscosity test in piling assesses the fluid's resistance to flow, crucial for ensuring stability in pile foundations.
Measures the flow characteristics of drilling fluids used in piling.
High viscosity can indicate thicker fluids, affecting the ease of pile installation.
Low viscosity may lead to inadequate support for the pile during installation.
Example: Bentonite slurry is often tested for viscosity to ensure prop...
A well foundation is a deep foundation type used to support structures by transferring loads to deeper, stable soil layers.
Well foundations are typically cylindrical and constructed using reinforced concrete.
They are often used in bridge construction, especially in river or coastal areas.
Well foundations can be sunk into the ground using various methods, such as drilling or excavation.
They provide stability in are...
Estimating labor for pier construction involves assessing tasks, crew size, and project duration.
1. Assess the design and size of the pier to determine complexity.
2. Estimate the number of workers needed based on tasks like excavation, formwork, and concrete pouring.
3. Consider the duration of each phase; for example, a small pier may take 2-4 weeks, while larger ones can take months.
4. Factor in specialized labor...
Pile foundations transfer building loads to deeper soil layers, ensuring stability and support for structures.
1. Site Investigation: Conduct soil tests to determine load-bearing capacity and soil characteristics.
2. Design: Choose appropriate pile type (e.g., concrete, steel, timber) based on soil conditions and load requirements.
3. Pile Installation: Use methods like driving, drilling, or boring to install piles i...
Pile foundations are deep foundations used to transfer loads to deeper soil layers, ensuring stability and support for structures.
Site preparation: Clear the area and mark pile locations based on engineering plans.
Boring: Use a drilling rig to create holes for piles, ensuring they reach the required depth.
Pile installation: Insert piles into the drilled holes, which can be precast concrete, steel, or timber.
Load t...
Total Station is a surveying instrument used for measuring angles and distances with high accuracy.
Total Station combines theodolite, electronic distance meter, and software to measure angles and distances.
It is commonly used in construction, civil engineering, and land surveying.
Benefits include high accuracy, efficiency, and the ability to store and analyze data digitally.
Total Station can be used for tasks such...
A designation is a title or position given to an individual within an organization to signify their role or level of authority.
Designation is often used interchangeably with job title or rank.
It helps define the responsibilities and expectations associated with a particular role.
Examples include Manager, Director, Assistant, CEO, etc.
Bending moment is a measure of the bending effect on a structural element subjected to an external force.
Bending moment is the algebraic sum of moments about the neutral axis of a cross section of a beam or other structural element.
It is a measure of the bending effect caused by external forces acting on the structure.
Bending moment can cause the structure to bend or deform.
It is calculated by multiplying the forc...
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
Power transformer installation involves several steps to ensure proper functioning and safety.
Selecting a suitable location for the transformer based on factors like accessibility, ventilation, and safety regulations
Preparing the foundation for the transformer to ensure stability and proper weight distribution
Transporting the transformer to the installation site using appropriate equipment and following safety protocol...
Various tests are performed on transformers to ensure their proper functioning and safety.
Insulation resistance test to check for any insulation breakdown
Turns ratio test to verify the turns ratio of primary and secondary windings
Polarity test to ensure correct polarity of windings
Winding resistance test to measure the resistance of windings
Dielectric strength test to check the insulation strength under high voltage
Sho...
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
I appeared for an interview in Feb 2025, where I was asked the following questions.
Dynamic professional with diverse experience in management, operations, and team leadership across various industries.
Started career as a sales associate, developing strong customer service skills.
Progressed to a team lead role, where I managed a team of 10 and improved sales by 20%.
Transitioned to operations management, streamlining processes that reduced costs by 15%.
Currently pursuing an Assistant Manager position t...
The Assistant Manager oversees team operations, ensures efficiency, and supports management in achieving organizational goals.
Supervise daily operations to ensure smooth workflow and productivity.
Assist in training and onboarding new staff members, providing guidance and support.
Monitor team performance and provide constructive feedback to enhance skills.
Collaborate with management to develop strategies for improving s...
Shree Cement's power consumption is optimized through energy-efficient practices and renewable energy sources.
Energy Efficiency: Shree Cement employs advanced technologies to minimize energy consumption during production.
Renewable Energy: The company utilizes renewable energy sources, such as solar and wind, to reduce reliance on fossil fuels.
Waste Heat Recovery: Shree Cement implements waste heat recovery systems to h...
Shree Cement's specific heat consumption is a critical metric for energy efficiency in cement production processes.
Energy Efficiency: Specific heat consumption measures the energy required to raise the temperature of the material, impacting overall energy costs.
Benchmarking: Shree Cement aims to maintain low specific heat consumption compared to industry standards, enhancing competitiveness.
Process Optimization: Techni...
Managing team dynamics and resource allocation are key challenges in my role as Assistant Manager.
Balancing team workloads: For example, ensuring that no team member is overwhelmed while others are underutilized.
Navigating communication barriers: Sometimes, team members may have different communication styles, leading to misunderstandings.
Adapting to changing priorities: For instance, shifting project deadlines can req...
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I appeared for an interview in Mar 2025, where I was asked the following questions.
Progress review methods assess project performance and guide future actions through structured evaluations.
Regular check-ins: Schedule weekly or bi-weekly meetings to discuss progress and challenges.
Performance metrics: Use KPIs to measure success, such as project completion rates or budget adherence.
Feedback loops: Encourage team members to provide input on processes and outcomes for continuous improvement.
Documentati...
Technical sound, good dress-up code
Pressure vessel design involves the calculation of stresses, material selection, and safety factors to ensure the vessel can safely contain the desired pressure.
Consider the material properties and thickness to withstand the internal pressure
Calculate stresses using formulas like the thin-walled pressure vessel equation
Factor in safety margins to account for uncertainties in material properties or loading conditions
Top trending discussions
The duration of Larsen & Toubro Limited Assistant Manager interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 68 interview experiences
Difficulty level
Duration
based on 1.1k reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹9.5 L/yr - ₹17 L/yr |
Senior Engineer
3.6k
salaries
| ₹6 L/yr - ₹13 L/yr |
Engineer
1.4k
salaries
| ₹3.9 L/yr - ₹9.1 L/yr |
Manager
1.3k
salaries
| ₹14.7 L/yr - ₹25 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹9 L/yr - ₹16 L/yr |
AECOM
Megha Engineering & Infrastructures
Alstom Transportation
Burns & McDonnell