i
Alstom
Transportation
Filter interviews by
Evaluating performance can involve metrics like project completion, innovation, teamwork, and adherence to safety standards.
Project Completion: Timely delivery of projects within budget, e.g., completing a design project ahead of schedule.
Innovation: Contribution of new ideas or improvements, such as developing a more efficient cooling system.
Teamwork: Collaboration with colleagues, demonstrated by successful cros...
Fire NOC conditions refer to the requirements set by the fire department for ensuring fire safety in a building or establishment.
Fire NOC is required before starting any construction or occupancy of a building.
The building must comply with fire safety regulations such as having fire extinguishers, smoke detectors, and fire alarms installed.
Regular fire drills and training for occupants are necessary to ensure prep...
25 KV AC is more efficient for railways due to lower energy losses over long distances.
25 KV AC is more efficient for long distance transmission as it experiences lower energy losses compared to 750V DC.
25 KV AC allows for higher speeds and heavier loads on the railway system.
25 KV AC is the standard voltage used in many modern railway systems around the world, such as in Europe and parts of Asia.
750V DC may be mo...
Reverse a string without using string or inbuilt function
Create an array of characters to store the string
Use two pointers, one at the beginning and one at the end, swap characters until they meet
Repeat until all characters are swapped
Schematic diagrams show how interior parts are mounted in a mechanical system.
Schematic diagrams provide a visual representation of the mounting scheme for interior parts.
They show the location and orientation of each part in relation to the whole system.
Mounting schemes can vary depending on the specific mechanical system and its requirements.
Examples of interior parts that may require mounting include motors, pu...
I applied via LinkedIn and was interviewed before Jun 2023. There was 1 interview round.
Fire NOC conditions refer to the requirements set by the fire department for ensuring fire safety in a building or establishment.
Fire NOC is required before starting any construction or occupancy of a building.
The building must comply with fire safety regulations such as having fire extinguishers, smoke detectors, and fire alarms installed.
Regular fire drills and training for occupants are necessary to ensure preparedn...
I have 5 years of experience as a Mechanical Engineer.
I have 5 years of experience in the field.
I have worked on various projects and gained valuable skills.
I have experience in designing and analyzing mechanical systems.
I have worked with different CAD software and simulation tools.
I have a strong understanding of mechanical principles and engineering concepts.
I have 5 years of experience in manufacturing industries.
I have worked in two different manufacturing companies.
I have experience in designing and optimizing manufacturing processes.
I have worked with various types of machinery and equipment.
I have successfully implemented cost-saving measures in manufacturing operations.
I have experience in quality control and ensuring compliance with industry standards.
I appeared for an interview before Jun 2024, where I was asked the following questions.
I applied via AmbitionBox and was interviewed before Dec 2022. There were 4 interview rounds.
It's better for the knowledge purpose
I will share our details aptitude, skills and experience
Evaluating performance can involve metrics like project completion, innovation, teamwork, and adherence to safety standards.
Project Completion: Timely delivery of projects within budget, e.g., completing a design project ahead of schedule.
Innovation: Contribution of new ideas or improvements, such as developing a more efficient cooling system.
Teamwork: Collaboration with colleagues, demonstrated by successful cross-dep...
I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.
Schematic diagrams show how interior parts are mounted in a mechanical system.
Schematic diagrams provide a visual representation of the mounting scheme for interior parts.
They show the location and orientation of each part in relation to the whole system.
Mounting schemes can vary depending on the specific mechanical system and its requirements.
Examples of interior parts that may require mounting include motors, pumps, ...
Top trending discussions
posted on 12 Apr 2021
posted on 26 Jul 2021
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle. An AHU (Air Handling Unit) is a device used to regulate and circulate air as part of a heating, ventilating, and air-conditioning (HVAC) system.
Chillers are commonly used in commercial and industrial buildings to cool water or other fluids for air conditioning or process cooling.
AHUs are responsible for con...
posted on 1 Mar 2023
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Boiler drum is a cylindrical container which is used to store water and steam produced in a boiler.
It is a vital component of a boiler system.
It is usually made of steel and is located at the top of the boiler.
It acts as a reservoir of water/steam and helps to separate steam from water.
It also helps to regulate the pressure and temperature of the steam.
The level of water in the drum is maintained by a feedwater control...
I applied via Company Website
Some of the top questions asked at the Alstom Transportation Mechanical Engineer interview -
based on 6 interview experiences
Difficulty level
Duration
based on 34 reviews
Rating in categories
Software Designer
501
salaries
| ₹5.9 L/yr - ₹21.7 L/yr |
System Engineer
199
salaries
| ₹8.3 L/yr - ₹19 L/yr |
Software Engineer
192
salaries
| ₹5.8 L/yr - ₹13.6 L/yr |
Senior Software Engineer
192
salaries
| ₹11.9 L/yr - ₹20 L/yr |
Team Lead
189
salaries
| ₹9.5 L/yr - ₹17.5 L/yr |
Larsen & Toubro Limited
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Tata Technologies