i
BIM
Heroes
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
BIM stands for Building Information Modeling. It is a digital representation of a building's physical and functional characteristics.
BIM is a collaborative process that involves architects, engineers, contractors, and owners.
It helps in creating a virtual model of a building before it is constructed.
BIM includes information about the building's design, construction, and maintenance.
It allows for better communication an...
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
Load calculation of Transformer
Load calculation involves determining the amount of power required by the load
Transformer rating should be higher than the calculated load
Load calculation takes into account factors such as power factor, efficiency, and voltage regulation
Formula for load calculation: Load (kVA) = Voltage (V) x Current (A) x Power Factor
Example: If the load is 100 kW with a power factor of 0.8 and a voltag...
I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.
Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.
Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.
The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.
The operation of the batching plant involves loading the ingredients into the hopper...
I applied via Other and was interviewed in May 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
The El Signalling system is a railway signalling system used in Europe.
The system uses a combination of track circuits and signals to control train movements.
It was first introduced in the early 20th century and has since been updated and modernized.
The system is used in countries such as France, Spain, and Italy.
It allows for efficient and safe train operations on busy railway lines.
The system has faced some criticism...
Indian Railways has a modern telecom system for efficient communication and safety.
Telecom system includes GSM-R, Wi-Fi, and CCTV surveillance.
GSM-R enables communication between train drivers and control centers.
Wi-Fi is available for passengers in select trains and stations.
CCTV surveillance ensures safety and security of passengers and railway property.
Indian Railways is also implementing a Train Collision Avoidance...
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.
based on 1 interview experience
Difficulty level
Duration
based on 3 reviews
Rating in categories
BIM Engineer
5
salaries
| ₹3 L/yr - ₹4.2 L/yr |
BIM Modeller
3
salaries
| ₹3.2 L/yr - ₹3.6 L/yr |
C-tech Engineering & Construction Private Limited
GRUNE DESIGNS
CIVIL SITE ENGINEER CIVIL MANAGEMENT
Dhatarwal Construction Company