i
Tata
Projects
Work with us
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
A master schedule outlines project timelines, resources, and key milestones for effective planning and execution.
Defines overall project timeline and key deliverables.
Integrates various project components, such as tasks and resources.
Helps in resource allocation and workload balancing.
Example: In construction, it schedules phases like design, procurement, and construction.
Serves as a communication tool among stake...
I prioritize safety, coordination, and quality in managing exterior work on a 20-floor building.
Conduct a thorough site assessment to identify potential hazards and challenges, such as weather conditions and access points.
Develop a detailed project plan that includes timelines, resource allocation, and safety protocols to ensure smooth execution.
Coordinate with subcontractors and suppliers to ensure timely deliver...
Material testing evaluates the properties and performance of materials to ensure quality and compliance with standards.
Determines mechanical properties like tensile strength and hardness.
Assesses durability through fatigue and impact tests.
Evaluates chemical resistance using corrosion tests.
Ensures compliance with industry standards, e.g., ASTM, ISO.
Examples include concrete testing for compressive strength and me...
Soil testing procedures ensure quality and stability in construction projects through various tests like MDD, CBR, FSI, and GSA.
Maximum Dry Density (MDD) is determined using the Proctor test, which involves compacting soil at varying moisture contents.
California Bearing Ratio (CBR) test assesses the strength of subgrade soil; a CBR of 2.5 mm indicates low strength, suitable for light traffic.
Field Stability Index ...
The zero harm policy in TPL aims to eliminate workplace injuries and promote a culture of safety.
Focuses on proactive measures to prevent accidents and injuries.
Encourages reporting of near misses to identify potential hazards.
Involves regular safety training and drills for all employees.
Promotes a culture where safety is everyone's responsibility, not just management.
Uses data analysis to continuously improve saf...
The construction sequence of a thermal power plant involves site preparation, equipment installation, and testing phases.
Site Preparation: Clearing land, excavation, and foundation work.
Equipment Installation: Installing boilers, turbines, and generators.
Electrical Systems: Setting up transformers, switchgear, and control systems.
Piping and Insulation: Installing steam and water piping, along with insulation.
Commi...
GST reconciliation ensures accurate tax reporting by matching sales and purchase data with GST returns.
1. Gather all sales and purchase invoices for the period.
2. Verify GST collected on sales matches GST reported in GSTR-1.
3. Check GST paid on purchases against GSTR-2A for accuracy.
4. Identify discrepancies and investigate reasons, such as missing invoices.
5. Adjust entries in the books if necessary and ensure co...
A filter house is essential for treating raw water, removing impurities and ensuring safe drinking water supply.
Removes suspended solids and particulate matter from raw water.
Utilizes various filtration methods like sand filters, activated carbon filters, and membrane filters.
Ensures compliance with water quality standards for safe consumption.
Example: Sand filters can effectively remove larger particles, while ac...
Effective project scheduling and tracking methods ensure timely delivery and resource management.
Gantt Charts: Visual representation of project timelines, showing tasks and their durations.
Critical Path Method (CPM): Identifies essential tasks that impact project completion time.
Agile Methodology: Iterative approach focusing on collaboration and flexibility, often using Scrum or Kanban.
Project Management Software:...
Delay analysis in construction assesses the causes and impacts of project delays to determine responsibility and mitigate risks.
Identifies the reasons for delays, such as weather, labor strikes, or material shortages.
Uses techniques like the Critical Path Method (CPM) to analyze project schedules.
Involves comparing planned vs. actual timelines to quantify delays.
Can lead to claims for time extensions or compensati...
The size of a cube is determined by the length of its sides, measured in millimeters.
A cube has equal sides; if one side is 10mm, all sides are 10mm.
Volume can be calculated as side^3; for a 10mm cube, volume = 1000mmÂł.
Common sizes include 5mm, 10mm, 20mm, etc., depending on the application.
M20 concrete typically achieves about 70% of its strength in 7 days, approximately 15-17 kN/mm².
M20 grade concrete has a characteristic compressive strength of 20 MPa (20 N/mm²) at 28 days.
After 7 days, M20 concrete generally reaches about 65-70% of its 28-day strength.
This means the nominal strength after 7 days is approximately 13-14 N/mm², or 13-14 kN/mm².
Factors like curing conditions and temperature can affect the...
NP2 and NP3 pipes differ in their pressure ratings and applications in construction and plumbing.
NP2 pipes have a lower pressure rating compared to NP3 pipes, making them suitable for less demanding applications.
NP3 pipes are designed for higher pressure applications, often used in water supply and drainage systems.
For example, NP2 pipes might be used for irrigation, while NP3 pipes are used in municipal water supply.
T...
To check anodized aluminum depth, use methods like thickness gauges or chemical tests for accurate measurement.
Use a micrometer or caliper to measure the thickness of the anodized layer directly.
Employ a portable anodizing thickness gauge, which uses eddy current or ultrasonic methods.
Conduct a chemical test using a specific anodizing depth measurement solution that reacts with the anodized layer.
Perform a scratch test...
A toilet bathroom pipeline should have a slope of 1/4 inch per foot for effective drainage.
A slope of 1/4 inch per foot is standard for toilet drain lines.
This slope ensures proper flow and prevents clogs.
For example, a 10-foot pipe should drop 2.5 inches from the toilet to the sewer line.
Too steep a slope can cause waste to flow too quickly, leading to blockages.
posted on 24 Jan 2025
Scaffolding codes are standards set by regulatory bodies to ensure safe construction practices.
Scaffolding codes vary by country and region, but generally include guidelines on materials, design, erection, use, and dismantling of scaffolds.
Common standards include OSHA regulations in the United States, BS EN 12811 in Europe, and AS/NZS 1576 in Australia.
Inspectors must ensure that scaffolding meets these codes to preve...
Different types of scaffolding erection include supported scaffolding, suspended scaffolding, mobile scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground.
Suspended scaffolding is hung from the top of a building or structure.
Mobile scaffolding is on wheels and can be easily moved around a worksite.
Aerial lifts are platforms that can be raised and lowered for access t...
Safety purchase materials should be durable, high quality, and compliant with safety regulations.
Choose materials that are durable and can withstand heavy loads
Select high quality materials to ensure safety of workers
Ensure that the materials meet safety regulations and standards
Examples of safety purchase materials include high-strength steel, aluminum, and quality wood
Safe erection of scaffolding involves proper planning, training, supervision, and adherence to safety regulations.
Ensure all workers are properly trained in scaffolding erection and safety procedures.
Inspect all components of the scaffolding before erection to ensure they are in good condition.
Plan the erection process carefully, considering factors such as weight capacity, stability, and proximity to power lines.
Use p...
I appeared for an interview in Jan 2025.
I appeared for an interview in Feb 2025.
As a Senior Land Surveyor, my role involves overseeing surveying projects, ensuring accuracy, and mentoring junior staff.
Lead surveying projects from planning to execution, ensuring compliance with regulations.
Utilize advanced surveying technology like GPS and total stations for precise measurements.
Mentor junior surveyors, providing guidance on best practices and technical skills.
Collaborate with engineers and archite...
Company Notice period
I have 8 years of experience in the hospitality industry, including 4 years as a General Manager.
8 years of experience in the hospitality industry
4 years as a General Manager
Strong leadership and team management skills
Proven track record of increasing revenue and customer satisfaction
Experience in budgeting, forecasting, and strategic planning
I chose this company because of its strong reputation in the industry and its commitment to employee development.
Strong reputation in the industry
Commitment to employee development
Opportunities for growth and advancement
Positive company culture
I am looking for a competitive salary that reflects my experience and skills.
Research industry standards for Assistant General Manager salaries
Consider your level of experience and qualifications
Be prepared to negotiate based on the job responsibilities and benefits package
I appeared for an interview in Jun 2025, where I was asked the following questions.
Soil testing procedures ensure quality and stability in construction projects through various tests like MDD, CBR, FSI, and GSA.
Maximum Dry Density (MDD) is determined using the Proctor test, which involves compacting soil at varying moisture contents.
California Bearing Ratio (CBR) test assesses the strength of subgrade soil; a CBR of 2.5 mm indicates low strength, suitable for light traffic.
Field Stability Index (FSI)...
Cement's initial setting time is about 30 minutes, while the final setting time is approximately 600 minutes.
Initial setting time: The period during which cement begins to harden, typically around 30 minutes.
Final setting time: The time it takes for cement to fully harden, usually around 600 minutes.
Factors affecting setting times include temperature, humidity, and the type of cement used.
For example, rapid-setting cem...
Aggregate testing for sieve gradation assesses particle size distribution in materials for construction quality control.
Sieve gradation tests determine the particle size distribution of aggregates.
Commonly used sieves include 4.75 mm, 2.36 mm, 1.18 mm, and 0.6 mm.
The process involves stacking sieves in descending order and pouring the aggregate on top.
After shaking, the amount of material retained on each sieve is weig...
FDD testing for subgrade ensures soil stability and quality for construction projects.
FDD (Field Density Determination) testing measures the density of subgrade soil to ensure it meets specifications.
Common methods include the sand cone test and nuclear density gauge test.
Results help determine if the subgrade can support the intended load of structures.
Example: A sand cone test involves excavating a small hole, fillin...
Material testing evaluates the properties and performance of materials to ensure quality and compliance with standards.
Determines mechanical properties like tensile strength and hardness.
Assesses durability through fatigue and impact tests.
Evaluates chemical resistance using corrosion tests.
Ensures compliance with industry standards, e.g., ASTM, ISO.
Examples include concrete testing for compressive strength and metal t...
I appeared for an interview in May 2025, where I was asked the following questions.
I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.
The load capacity of scaffolding varies depending on the type and materials used.
Load capacity is determined by factors such as the type of scaffolding (e.g. tube and coupler, frame, system), materials used (e.g. steel, aluminum), and design specifications.
It is important to consult the manufacturer's guidelines and engineering calculations to determine the specific load capacity of a particular scaffolding system.
For ...
Hanging scaffolding is erected by attaching the scaffold to a building or structure using suspension ropes or chains.
Inspect the building or structure to ensure it can support the weight of the scaffold
Attach suspension ropes or chains securely to the building or structure
Lower the scaffold platform into position using a hoist system
Secure the platform in place to prevent swinging or movement
Ensure all safety measures ...
Scaffolding material inspection.
What people are saying about Tata Projects
The duration of Tata Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 631 interview experiences
Difficulty level
Duration
based on 5.9k reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹9 L/yr - ₹15.4 L/yr |
Assistant Manager
865
salaries
| ₹5.9 L/yr - ₹14.4 L/yr |
Manager
432
salaries
| ₹12 L/yr - ₹21 L/yr |
Senior Manager
417
salaries
| ₹18.9 L/yr - ₹30.2 L/yr |
Senior Engineer
405
salaries
| ₹5.2 L/yr - ₹12.5 L/yr |
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company
KEC International