Filter interviews by
I appeared for an interview before Dec 2020, where I was asked the following questions.
Concrete grades indicate the compressive strength and mix proportions, essential for construction quality and durability.
Concrete grades are classified based on their compressive strength, measured in megapascals (MPa).
Common grades include M20 (20 MPa), M25 (25 MPa), and M30 (30 MPa), used for different structural applications.
Higher grades like M40 and M50 are used for high-strength applications, such as bridges and ...
Density values for sand, cement, and steel are crucial for construction and engineering calculations.
Density of sand: Typically ranges from 1.44 to 1.60 g/cm³ depending on moisture content and type.
Density of cement: Generally around 1.44 g/cm³ for ordinary Portland cement.
Density of steel: Approximately 7.85 g/cm³, making it much denser than sand and cement.
Example: Knowing the density helps in calculating the weight ...
Plastering calculation involves determining the amount of plaster needed based on surface area and mix ratio.
Calculate the surface area to be plastered (length x height).
Determine the thickness of plaster (typically 12-15 mm for internal walls).
Use the plaster mix ratio (e.g., 1:4 for cement to sand) to calculate material quantities.
Example: For a wall of 10m² and 15mm thickness, volume = 10 x 0.015 = 0.15 m³.
For a 1:4...
I applied via Walk-in and was interviewed before Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
To find sand and cement quantity for 1sqm of wall plastering area, certain calculations need to be done.
Determine the thickness of the plastering required
Calculate the volume of plastering required
Determine the ratio of sand and cement to be used
Calculate the quantity of sand and cement required based on the ratio
Add water to the mixture and mix thoroughly to get the plastering material
Drawing to calculate steel for what purpose?
Need more information on the purpose of the steel calculation
Is it for a building, bridge, or other structure?
What are the load requirements and environmental factors?
Consult engineering standards and codes for appropriate calculations
Top trending discussions
I applied via Campus Placement and was interviewed before Nov 2021. There were 4 interview rounds.
Topics very generic like which is better online learning or offline learning, theory or practical etc
Aluminium shuttering is a modern construction technique that involves using interlocking panels made of aluminium to form the walls, floors, and ceilings of a building.
The panels are lightweight and easy to handle, making them ideal for use in high-rise buildings and other large-scale construction projects.
The panels are pre-fabricated to the required dimensions and are then transported to the construction site.
The pan...
posted on 27 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
A structured approach to work enhances efficiency, collaboration, and project success.
Define clear objectives: Establish what needs to be achieved, e.g., project milestones.
Plan and prioritize tasks: Use tools like Gantt charts to visualize timelines.
Collaborate effectively: Regular team meetings to discuss progress and challenges.
Monitor progress: Use KPIs to track performance and make adjustments as needed.
Review and...
Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
Yes, I have worked with Mivan shuttering in previous projects.
I have experience in setting up and dismantling Mivan formwork for concrete construction
I am familiar with the process of pouring concrete into Mivan shuttering to create walls and slabs
I have worked with Mivan system in residential and commercial projects
I understand the importance of proper alignment and bracing when using Mivan shuttering
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
based on 2 interview experiences
Difficulty level
Duration
based on 16 reviews
Rating in categories
Civil Site Engineer
69
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Site Engineer
47
salaries
| ₹1.8 L/yr - ₹5.1 L/yr |
Junior Engineer
42
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Senior Engineer
41
salaries
| ₹3.7 L/yr - ₹8.8 L/yr |
Junior Engineer Civil
34
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Omaxe
Mahindra Lifespace Developers
Realty Assistant