i
Omaxe
Filter interviews by
Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
Top trending discussions
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Acoustic refers to sound and its properties, while an ecosystem is a community of living organisms and their environment.
Acoustic refers to the study of sound waves and their behavior in different environments.
It involves understanding the properties of sound such as frequency, amplitude, and wavelength.
Acoustic engineering is used in designing concert halls, recording studios, and sound systems.
Ecosystem refers to a c...
Yes, I can handle building finishing works.
I have experience in managing building finishing works in my previous role as a Project Manager.
I am familiar with various aspects of building finishing works such as painting, flooring, and installation of fixtures.
I have successfully completed several building projects where I oversaw the finishing works.
I have a strong attention to detail and ensure that the finishing works...
Customers can check balcony slope by using a spirit level or a laser level.
Customers can use a spirit level to check the slope of their balcony. They place the level on the balcony floor and ensure the bubble is centered between the two lines.
Alternatively, customers can use a laser level to check the slope. They position the laser level at one end of the balcony and measure the height difference between the laser beam...
Customers typically check various aspects during possession of a product or service.
Quality and condition of the product or service
Accuracy of the order or specifications
Functionality and performance
Packaging and presentation
Documentation and instructions
Warranty or guarantee
Any additional features or accessories
Value for money
Check points for snagging are specific areas or aspects that need to be inspected and rectified before finalizing a project.
Inspecting the quality of materials used
Checking for any defects or damages
Ensuring proper installation and functioning of equipment
Verifying compliance with safety regulations
Addressing any outstanding issues or discrepancies
Documenting and reporting findings
Conducting final walkthroughs to ensur...
I applied via Referral and was interviewed before Jan 2023. There was 1 interview round.
posted on 12 Nov 2024
I appeared for an interview before Mar 2024, where I was asked the following questions.
based on 1 interview experience
based on 13 reviews
Rating in categories
Assistant Manager
94
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Deputy Manager
64
salaries
| ₹4.5 L/yr - ₹9.4 L/yr |
Manager
57
salaries
| ₹5.3 L/yr - ₹13.1 L/yr |
Senior Manager
48
salaries
| ₹9.6 L/yr - ₹16.5 L/yr |
Senior Executive
39
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Emaar India Limited
Brigade Group
Puravankara
Mahindra Lifespace Developers