Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I appeared for an interview in Jun 2021.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
HRG stands for Human Resource Group while LRG stands for Large Retail Group.
HRG focuses on managing human resources within an organization
LRG focuses on managing a large retail business
HRG deals with employee relations, recruitment, training, and development
LRG deals with sales, inventory management, customer service, and marketing
Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.
Determine the total load requirements in kVA
Consider the load factor and diversity factor
Calculate the transformer size based on the total load requirements
Ensure the transformer is rated for the appropriate voltage and frequency
Consult with a professional engineer if needed
Designing a floating head assembly involves considering various factors such as material selection, sealing mechanisms, and thermal expansion.
Select appropriate materials for the floating head assembly based on the application requirements.
Design effective sealing mechanisms to prevent leakage and ensure proper functioning.
Consider thermal expansion and contraction to accommodate temperature variations.
Ensure proper al...
H2S service for pressure vessel refers to the use of hydrogen sulfide in a pressure vessel.
H2S service involves the handling and containment of hydrogen sulfide gas in a pressure vessel.
Pressure vessels used in H2S service must be designed and constructed to withstand the corrosive effects of hydrogen sulfide.
Special materials and coatings may be required to prevent hydrogen sulfide from corroding the pressure vessel.
R...
Gaskets are mechanical seals used to prevent leakage between two surfaces. There are various types of gaskets available.
Sheet gaskets
Spiral wound gaskets
Ring gaskets
Metallic gaskets
Rubber gaskets
Cork gaskets
Non-asbestos gaskets
posted on 13 Mar 2024
I applied via LinkedIn and was interviewed before Mar 2023. There were 2 interview rounds.
The planning process involves setting goals, identifying resources, creating a timeline, and evaluating progress.
Setting clear and achievable goals
Identifying resources needed
Creating a timeline for tasks and deadlines
Evaluating progress and making adjustments as needed
I appeared for an interview in Dec 2024.
Lattice tower sub bracing design involves the structural support system for the tower.
Sub bracing design is crucial for maintaining the stability and strength of lattice towers.
The design should consider factors such as wind load, weight distribution, and material strength.
Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.
Computer-aided design software is often used...
I appeared for an interview before Apr 2024, where I was asked the following questions.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Construction activities encompass planning, designing, and building structures, ensuring safety and compliance with regulations.
Site Preparation: Clearing and leveling land before construction begins.
Foundation Work: Pouring concrete and laying the groundwork for stability.
Framing: Constructing the skeleton of the building using wood or steel.
Roofing: Installing the roof structure to protect the building from elements.
...
Mivan shuttering is an aluminum formwork system used for rapid construction of concrete structures.
1. Preparation: Site is cleared and foundation is laid before shuttering installation.
2. Assembly: Aluminum panels are assembled on-site to create the desired shape of walls and slabs.
3. Alignment: Panels are aligned and secured to ensure accuracy in dimensions.
4. Concrete Pouring: Concrete is poured into the formwork, fi...
based on 2 interview experiences
Difficulty level
Duration
based on 11 reviews
Rating in categories
Data Entry Operator
34
salaries
| ₹2 L/yr - ₹3 L/yr |
Office Assistant
17
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Computer Operator
14
salaries
| ₹2.2 L/yr - ₹3.3 L/yr |
Assistant Director
10
salaries
| ₹9.1 L/yr - ₹12.3 L/yr |
Data Engineer
9
salaries
| ₹25 L/yr - ₹30 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM