Upload Button Icon Add office photos

Freyr Energy Services

Compare button icon Compare button icon Compare

Filter interviews by

Freyr Energy Services Interview Questions and Answers

Updated 29 Jun 2025
Popular Designations

7 Interview questions

A Sales Manager was asked 2mo ago
Q. Are you willing to travel distances exceeding 100 kilometers?
Ans. 

I am fully prepared to travel over 100 kms as needed, understanding its importance for building client relationships and closing deals.

  • Client Engagement: Traveling allows me to meet clients face-to-face, fostering stronger relationships and trust, which can lead to increased sales.

  • Market Understanding: Visiting different regions helps me understand local market dynamics and customer preferences, enabling tailored ...

View all Sales Manager interview questions
A Site Engineer was asked 2mo ago
Q. What size wire (in mm) is typically used in solar panel installations?
Ans. 

Solar wire sizes vary, typically ranging from 1.5 mm² to 10 mm², depending on the application and current requirements.

  • 1.5 mm² wire is commonly used for small solar panel systems.

  • 4 mm² wire is suitable for medium-sized installations.

  • 10 mm² wire is often used for larger systems to handle higher currents.

  • The choice of wire size also depends on the distance from the solar panels to the inverter.

View all Site Engineer interview questions
A Site Engineer was asked 2mo ago
Q. What is the cost of the earthing pit?
Ans. 

An earthing pit is a crucial component for electrical safety, providing a path for fault currents to ground.

  • Depth: Typically, an earthing pit should be at least 2-3 meters deep to ensure effective grounding.

  • Diameter: The diameter of the pit can vary, but it is generally around 1 meter to accommodate the earthing electrode and surrounding materials.

  • Materials: Common materials used include copper or galvanized iron ...

View all Site Engineer interview questions
A Site Engineer was asked 8mo ago
Q. How do you solve Operation and Maintenance service issues?
Ans. 

O&M service can be solved by implementing a proactive maintenance plan and utilizing advanced technology.

  • Develop a proactive maintenance plan to prevent breakdowns and reduce downtime

  • Utilize advanced technology such as IoT sensors for real-time monitoring and predictive maintenance

  • Regularly train and educate staff on best practices for maintenance and troubleshooting

  • Establish partnerships with reliable suppliers f...

View all Site Engineer interview questions
A Site Engineer was asked 8mo ago
Q. What are your strengths, weaknesses, and hobbies?
Ans. 

Discussing strengths and weaknesses helps identify personal growth areas and showcases self-awareness in a Site Engineer role.

  • Strength: Strong problem-solving skills, demonstrated by successfully resolving site issues under tight deadlines.

  • Weakness: Sometimes overly detail-oriented, which can slow down decision-making; working on prioritizing tasks better.

  • Strength: Excellent communication skills, facilitating effe...

View all Site Engineer interview questions
A Sales Manager was asked 2mo ago
Q. Explanation about solar and energy market
Ans. 

The solar and energy market focuses on renewable energy sources, particularly solar power, to meet global energy demands sustainably.

  • Growing Demand: The global shift towards renewable energy has increased the demand for solar energy solutions, with countries like Germany leading in solar installations.

  • Technological Advancements: Innovations in solar panel efficiency and energy storage, such as Tesla's Powerwall, a...

View all Sales Manager interview questions
A Site Engineer was asked 8mo ago
Q. Explanation about total system
Ans. 

Total system refers to the combination of all components and processes working together to achieve a specific goal or function.

  • Total system includes all interconnected parts working together

  • It involves understanding how each component contributes to the overall function

  • Examples include a construction project with various teams and equipment working together

  • In engineering, total system approach ensures efficiency a...

View all Site Engineer interview questions
Are these interview questions helpful?

Freyr Energy Services Interview Experiences

8 interviews found

Store Manager Interview Questions & Answers

user image Anonymous

posted on 29 Jun 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
  • Q1. Job role expertise
  • Q2. Experience of past
  • Ans. 

    I have over five years of experience managing retail stores, focusing on team leadership and customer satisfaction.

    • Led a team of 15 employees, improving sales by 20% through effective training and motivation.

    • Implemented a new inventory management system that reduced stock discrepancies by 30%.

    • Developed customer loyalty programs that increased repeat business by 25% within a year.

    • Managed store operations during peak sea...

  • Answered by AI

Senior Sales Manager Interview Questions & Answers

user image Jitendra Sharma (Jeet)

posted on 15 Aug 2024

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me something about
  • Ans. 

    I have over 10 years of experience in sales, with a proven track record of exceeding targets and building strong client relationships.

    • Experience in leading sales teams and developing sales strategies

    • Strong negotiation and communication skills

    • Ability to analyze market trends and identify new business opportunities

    • Proven track record of meeting and exceeding sales targets

    • Building and maintaining strong client relationshi...

  • Answered by AI
  • Q2. Work experience
Round 2 - One-on-one 

(2 Questions)

  • Q1. Same as above like previous
  • Q2. Waste of time in freyr

Interview Preparation Tips

Interview preparation tips for other job seekers - Please if you want to join
Join anywhere but if you want to distroy your career then welcome to freyr
Very bad experience with training then Manager and last HR

Salesman Interview Questions & Answers

user image Naman pandey

posted on 16 May 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Apr 2025, where I was asked the following questions.

  • Q1. Where you work.
  • Ans. 

    I work at a dynamic tech company that specializes in innovative software solutions for businesses, enhancing efficiency and productivity.

    • Collaborate with cross-functional teams to develop software products.

    • Engage with clients to understand their needs and provide tailored solutions.

    • Conduct market research to identify trends and opportunities.

    • Participate in sales presentations and product demonstrations.

  • Answered by AI
  • Q2. Why u can searching in new jobs.
  • Ans. 

    I'm seeking new job opportunities to grow professionally and find a role that aligns with my career goals and values.

    • Desire for professional growth: I'm looking for a position that offers more opportunities for advancement.

    • Alignment with career goals: I want to work in a company whose values and mission resonate with my own.

    • Seeking new challenges: I'm eager to take on new responsibilities that will help me develop my s...

  • Answered by AI

Site Engineer Interview Questions & Answers

user image Harish Kumar Ahirwar

posted on 24 Apr 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. How many mm wire is used in solar
  • Ans. 

    Solar wire sizes vary, typically ranging from 1.5 mm² to 10 mm², depending on the application and current requirements.

    • 1.5 mm² wire is commonly used for small solar panel systems.

    • 4 mm² wire is suitable for medium-sized installations.

    • 10 mm² wire is often used for larger systems to handle higher currents.

    • The choice of wire size also depends on the distance from the solar panels to the inverter.

  • Answered by AI
  • Q2. How much is the earthing pit
  • Ans. 

    An earthing pit is a crucial component for electrical safety, providing a path for fault currents to ground.

    • Depth: Typically, an earthing pit should be at least 2-3 meters deep to ensure effective grounding.

    • Diameter: The diameter of the pit can vary, but it is generally around 1 meter to accommodate the earthing electrode and surrounding materials.

    • Materials: Common materials used include copper or galvanized iron rods,...

  • Answered by AI

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 17 Oct 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Habies and weekness strength
  • Ans. 

    Discussing strengths and weaknesses helps identify personal growth areas and showcases self-awareness in a Site Engineer role.

    • Strength: Strong problem-solving skills, demonstrated by successfully resolving site issues under tight deadlines.

    • Weakness: Sometimes overly detail-oriented, which can slow down decision-making; working on prioritizing tasks better.

    • Strength: Excellent communication skills, facilitating effective...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Explanation about total system
  • Ans. 

    Total system refers to the combination of all components and processes working together to achieve a specific goal or function.

    • Total system includes all interconnected parts working together

    • It involves understanding how each component contributes to the overall function

    • Examples include a construction project with various teams and equipment working together

    • In engineering, total system approach ensures efficiency and ef...

  • Answered by AI
  • Q2. How to solve O&M service
  • Ans. 

    O&M service can be solved by implementing a proactive maintenance plan and utilizing advanced technology.

    • Develop a proactive maintenance plan to prevent breakdowns and reduce downtime

    • Utilize advanced technology such as IoT sensors for real-time monitoring and predictive maintenance

    • Regularly train and educate staff on best practices for maintenance and troubleshooting

    • Establish partnerships with reliable suppliers for sp...

  • Answered by AI

Skills evaluated in this interview

Interview Questions & Answers

user image Anonymous

posted on 14 Mar 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Aptitude Test 

Logical reasoning questions,math

Assistant Manager Interview Questions & Answers

user image A. MOHAMED THARIF

posted on 3 Jun 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About On Grid and off grid Solar operation functions
Round 3 - HR 

(1 Question)

  • Q1. Discussed about relocation and salary

Interview Preparation Tips

Interview preparation tips for other job seekers - I have worked in 4 years this company,
I like a company work cultures,
Here we can learn more about solar industries updates,
Work time is flexible.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2023, where I was asked the following questions.

  • Q1. Explanation about solar and energy market
  • Ans. 

    The solar and energy market focuses on renewable energy sources, particularly solar power, to meet global energy demands sustainably.

    • Growing Demand: The global shift towards renewable energy has increased the demand for solar energy solutions, with countries like Germany leading in solar installations.

    • Technological Advancements: Innovations in solar panel efficiency and energy storage, such as Tesla's Powerwall, are ma...

  • Answered by AI
  • Q2. Pervious company relationship
  • Q3. Ready to travel as much as above 100 kms
  • Ans. 

    I am fully prepared to travel over 100 kms as needed, understanding its importance for building client relationships and closing deals.

    • Client Engagement: Traveling allows me to meet clients face-to-face, fostering stronger relationships and trust, which can lead to increased sales.

    • Market Understanding: Visiting different regions helps me understand local market dynamics and customer preferences, enabling tailored sales...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you can skip this company job offer

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Freyr Energy Services?
Ask anonymously on communities.

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basic all based on experience & there requirements
  • Q2. Experience & basic technical work like- transformer testing & PM checklist etc

Interview Preparation Tips

Interview preparation tips for other job seekers - brush up your basics, if having experience make sure you can justify that.

I applied via Recruitment Consultant and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. 19 technical question asked and 10/8 question is write

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical

Freyr Energy Services Interview FAQs

How many rounds are there in Freyr Energy Services interview?
Freyr Energy Services interview process usually has 2 rounds. The most common rounds in the Freyr Energy Services interview process are HR, One-on-one Round and Technical.
How to prepare for Freyr Energy Services interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Freyr Energy Services. The most common topics and skills that interviewers at Freyr Energy Services expect are Field Sales, B2B Sales, Sales, MS Office and Salesforce.
What are the top questions asked in Freyr Energy Services interview?

Some of the top questions asked at the Freyr Energy Services interview -

  1. How many mm wire is used in so...read more
  2. Explanation about solar and energy mar...read more
  3. How much is the earthing ...read more
How long is the Freyr Energy Services interview process?

The duration of Freyr Energy Services interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

3.4/5

based on 14 interview experiences

Difficulty level

Moderate 83%
Hard 17%

Duration

Less than 2 weeks 83%
2-4 weeks 17%
View more

Interview Questions from Similar Companies

UTL Solar Interview Questions
3.6
 • 51 Interviews
Gautam Solar Interview Questions
3.7
 • 25 Interviews
Senvion Interview Questions
4.0
 • 19 Interviews
M E Energy Interview Questions
4.2
 • 17 Interviews
LM Wind Power Interview Questions
3.9
 • 14 Interviews
Ohmium Interview Questions
3.0
 • 13 Interviews
Goldi Solar Interview Questions
4.2
 • 13 Interviews
View all

Freyr Energy Services Reviews and Ratings

based on 118 reviews

3.7/5

Rating in categories

3.3

Skill development

3.5

Work-life balance

3.6

Salary

3.3

Job security

3.5

Company culture

3.2

Promotions

3.4

Work satisfaction

Explore 118 Reviews and Ratings
Sr. Solar Sales Specialist - Aurangabad

Aurangabad

1-4 Yrs

₹ 2.8-4 LPA

Sr. Solar Sales Specialist

Tirupati

1-6 Yrs

₹ 2-4 LPA

Senior Sales Specialist

Rajahmundry,

Ongole

+1

1-4 Yrs

₹ 2.5-3.5 LPA

Explore more jobs
Senior Sales Manager
28 salaries
unlock blur

₹4.6 L/yr - ₹10 L/yr

Sales Manager
25 salaries
unlock blur

₹2.5 L/yr - ₹6.1 L/yr

Sales Support Associate
10 salaries
unlock blur

₹2.3 L/yr - ₹3.8 L/yr

Project Engineer
9 salaries
unlock blur

₹3.4 L/yr - ₹4.4 L/yr

I&C Engineer
8 salaries
unlock blur

₹3.3 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Freyr Energy Services with

UTL Solar

3.6
Compare

Danfoss Power Solutions

4.0
Compare

LM Wind Power

3.9
Compare

Senvion

4.0
Compare
write
Share an Interview