Faster and better experience!
Filter interviews by
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
Protein estimation methods are used to quantify the amount of protein in a sample.
Common protein estimation methods include Bradford assay, Lowry assay, and Bicinchoninic Acid (BCA) assay.
Each method has its own advantages and limitations, such as sensitivity, accuracy, and interference from other substances.
Protein estimation methods are essential in various fields like biochemistry, biotechnology, and food science.
Chromatography is a technique used to separate and analyze mixtures of chemicals based on their properties.
Chromatography involves a stationary phase and a mobile phase.
Different compounds in the mixture interact differently with the stationary phase, leading to separation.
Examples of chromatography techniques include gas chromatography, liquid chromatography, and thin-layer chromatography.
Filter integrity testing is crucial for ensuring the effectiveness of filters in various industries.
Bubble point testing
Diffusion testing
Pressure hold testing
Forward flow testing
Water intrusion testing
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
Gennova Biopharmaceuticals interview questions for popular designations
I applied via Referral and was interviewed in Oct 2021. There were 5 interview rounds.
Aptitude test done through email.
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Feb 2021. There was 1 interview round.
The color code of resistance is a system used to identify the resistance value and tolerance of resistors.
The color code consists of bands of different colors that represent specific values and tolerances.
The first two bands indicate the significant digits of the resistance value.
The third band represents the multiplier or the number of zeros to be added to the significant digits.
The fourth band indicates the tolerance...
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
Examine dimensions, materials, fittings, supports, and routing in isometric drawings.
Check dimensions to ensure proper fit and clearance
Verify materials specified for construction
Review fittings for correct type and size
Confirm supports are in place for proper installation
Analyze routing to ensure efficient flow and accessibility
Example: Checking pipe diameter for compatibility with system requirements
Documents required for piping modeling include P&IDs, equipment datasheets, piping specifications, and 3D model standards.
Piping and Instrumentation Diagrams (P&IDs) provide the overall layout and design of the piping system.
Equipment datasheets contain information about the equipment to be connected to the piping system.
Piping specifications outline the materials, sizes, and standards to be used for the piping...
P&ID shows detailed piping and instrumentation information, while PFD shows overall process flow.
P&ID includes detailed information on piping, valves, instruments, equipment, and control systems.
PFD provides an overview of the entire process flow, showing major equipment and key control loops.
P&ID is used for detailed engineering design and implementation, while PFD is used for process understanding and ana...
Key deliverables expected from a piping engineer include design, analysis, documentation, and project coordination.
Designing piping systems based on project requirements and specifications
Performing stress analysis to ensure structural integrity
Creating detailed drawings and documentation for construction
Coordinating with other engineering disciplines and stakeholders
Ensuring compliance with industry standards and regu
I would approach creating a pump piping layout by considering factors like pump type, flow rate, pressure requirements, and space constraints.
Identify the type of pump being used (centrifugal, reciprocating, etc.)
Determine the required flow rate and pressure for the system
Consider the layout of existing piping and equipment to optimize space utilization
Ensure proper support and anchoring of the piping to prevent vibrat...
The north sign in isometric drawings is important for orientation and ensuring consistency in the drawing.
The north sign helps in determining the direction of the drawing, ensuring that it is correctly oriented.
It helps in maintaining consistency in the drawing, especially when multiple sheets are involved.
It assists in understanding the spatial relationship between different components in the drawing.
Without the north...
based on 6 interviews
Interview experience
based on 136 reviews
Rating in categories
Executive
75
salaries
| ₹4.1 L/yr - ₹11.1 L/yr |
Officer
56
salaries
| ₹3 L/yr - ₹6 L/yr |
Assistant Manager
39
salaries
| ₹4.5 L/yr - ₹13.4 L/yr |
Production Officer
32
salaries
| ₹2.9 L/yr - ₹5 L/yr |
Technical Assistant
30
salaries
| ₹2.8 L/yr - ₹6.8 L/yr |
Bharat Biotech International
Serum Institute of India
Biocon Limited
DRJ & CO