Upload Button Icon Add office photos

HCC Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

HCC Infrastructure Interview Questions and Answers

Updated 9 Apr 2025
Popular Designations

23 Interview questions

A Site Manager was asked 2mo ago
Q. What is the code for RCC?
Ans. 

RCC stands for Reinforced Cement Concrete, a composite material used in construction for its strength and durability.

  • RCC combines concrete's compressive strength with steel's tensile strength.

  • Commonly used in beams, columns, slabs, and foundations.

  • Example: RCC is used in constructing bridges and high-rise buildings.

  • The mix typically includes cement, aggregates, water, and steel reinforcement.

View all Site Manager interview questions
A Project Engineer was asked 3mo ago
Q. How do you manage labor and materials?
Ans. 

Effective management of labor and materials ensures project efficiency, cost control, and timely completion.

  • Plan resource allocation: Assess project needs and allocate labor and materials accordingly.

  • Use project management software: Tools like MS Project or Trello can help track labor hours and material usage.

  • Implement just-in-time inventory: Reduce waste by ordering materials as needed, minimizing storage costs.

  • C...

View all Project Engineer interview questions
A Project Engineer was asked 3mo ago
Q. How do you maintain quality?
Ans. 

Maintaining quality involves systematic processes, adherence to standards, and continuous improvement to ensure project success.

  • Implement a quality management system (QMS) to standardize processes and ensure compliance.

  • Conduct regular training sessions for team members to keep them updated on best practices.

  • Utilize quality control tools like Six Sigma or Lean methodologies to identify and eliminate defects.

  • Perform...

View all Project Engineer interview questions
A Project Engineer was asked 3mo ago
Q. How do you solve problems?
Ans. 

Effective problem-solving involves identifying issues, analyzing options, and implementing solutions systematically.

  • Define the problem clearly: For example, if a project is behind schedule, specify the reasons such as resource allocation or unforeseen delays.

  • Gather relevant information: Collect data from team members, project reports, and stakeholder feedback to understand the context.

  • Analyze potential solutions: ...

View all Project Engineer interview questions
A Site Engineer was asked
Q. How do you work in a tunnel environment?
Ans. 

Working in a tunnel involves various tasks such as planning, excavation, ventilation, and safety measures.

  • Planning and designing the tunnel layout

  • Excavating the tunnel using appropriate methods and equipment

  • Ensuring proper ventilation to maintain air quality

  • Implementing safety measures to prevent accidents

  • Monitoring and maintaining the tunnel's structural integrity

  • Coordinating with other professionals involved in ...

View all Site Engineer interview questions
A Site Engineer was asked
Q. What is the M20 concrete ratio?
Ans. 

M20 concrete mix ratio is 1:1.5:3, indicating 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.

  • M20 concrete is a nominal mix with a characteristic compressive strength of 20 MPa.

  • The mix ratio of 1:1.5:3 is commonly used for medium-strength structures.

  • For example, in a 1 cubic meter mix, you would use approximately 400 kg of cement, 600 kg of sand, and 1200 kg of aggregate.

  • Water-cement ratio is crucia...

View all Site Engineer interview questions
A Site Engineer was asked
Q. What are the different grades of cement?
Ans. 

Cement grades indicate the strength and quality of cement, essential for construction projects.

  • Cement grades are classified based on their compressive strength, measured in megapascals (MPa).

  • Common grades include 33, 43, and 53, with 53 being the highest strength cement.

  • Grade 33 is suitable for general construction, while Grade 53 is used for high-strength applications.

  • Higher grade cement allows for thinner struct...

View all Site Engineer interview questions
Are these interview questions helpful?
A Civil Site Engineer was asked
Q. In a slump cone test, what are the possible shapes of the slump?
Ans. 

The shape of slump in a slump cone test is typically conical.

  • The shape of slump is conical, with the top being wider than the base.

  • The height of the slump is measured to determine the workability of the concrete.

  • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability.

  • Example: A true slump has a smooth, symmetrical shape with a slight collapse at the center.

View all Civil Site Engineer interview questions
A Project Manager Civil was asked
Q. Do you know how to create a bar bending schedule (BBS)?
Ans. 

Yes, I know bbs making.

  • BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.

  • BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.

  • It is an important task for ensuring the strength and durability of the structure.

  • BBS making requires knowledge of engineering ...

View all Project Manager Civil interview questions
A Project Manager Civil was asked
Q. What is the M25 grade of RCC?
Ans. 

RCC grade M25 is a concrete mix design ratio used in construction.

  • RCC stands for Reinforced Cement Concrete.

  • M25 is the compressive strength of the concrete after 28 days of curing.

  • The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).

  • It is commonly used in the construction of buildings, bridges, and other structures.

  • M25 grade concrete is suitable for moderate exposure conditions.

View all Project Manager Civil interview questions

HCC Infrastructure Interview Experiences

19 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
  • Q1. How to work then fail the plan
  • Ans. 

    Reassess the situation, identify what went wrong and create a new plan or adjust existing.

  • Answered Anonymously
  • Q2. Any project is budget low and how to effectively complete
  • Ans. 

    Managing a low-budget project requires strategic planning, resource optimization, and effective communication to ensure successful completion.

    • Prioritize project tasks: Focus on critical tasks that deliver the most value. For example, use the MoSCoW method to categorize tasks.

    • Leverage existing resources: Utilize in-house skills and tools to minimize costs. For instance, if your team has design expertise, use them instea...

  • Answered by AI
  • Q3. How to manage labour and materials
  • Ans. 

    Effective management of labor and materials ensures project efficiency, cost control, and timely completion.

    • Plan resource allocation: Assess project needs and allocate labor and materials accordingly.

    • Use project management software: Tools like MS Project or Trello can help track labor hours and material usage.

    • Implement just-in-time inventory: Reduce waste by ordering materials as needed, minimizing storage costs.

    • Conduc...

  • Answered by AI
  • Q4. How to solve problems
  • Ans. 

    Effective problem-solving involves identifying issues, analyzing options, and implementing solutions systematically.

    • Define the problem clearly: For example, if a project is behind schedule, specify the reasons such as resource allocation or unforeseen delays.

    • Gather relevant information: Collect data from team members, project reports, and stakeholder feedback to understand the context.

    • Analyze potential solutions: Evalu...

  • Answered by AI
  • Q5. How to maintain quality
  • Ans. 

    Maintaining quality involves systematic processes, adherence to standards, and continuous improvement to ensure project success.

    • Implement a quality management system (QMS) to standardize processes and ensure compliance.

    • Conduct regular training sessions for team members to keep them updated on best practices.

    • Utilize quality control tools like Six Sigma or Lean methodologies to identify and eliminate defects.

    • Perform regu...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Experience details.
  • Q2. Joining condition

Interview Preparation Tips

Interview preparation tips for other job seekers - Easy
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Minimum cement contains in RCC structure
  • Ans. 

    The minimum cement content in RCC structure is typically around 300 kg/m3.

    • Minimum cement content is usually specified by structural engineers based on design requirements.

    • Higher cement content may be required for structures in aggressive environments or with special design considerations.

    • The minimum cement content is important for achieving the desired strength and durability of the concrete mix.

  • Answered by AI
  • Q2. In slump cone test what is the shape of slump
  • Ans. 

    The shape of slump in a slump cone test is typically conical.

    • The shape of slump is conical, with the top being wider than the base.

    • The height of the slump is measured to determine the workability of the concrete.

    • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability.

    • Example: A true slump has a smooth, symmetrical shape with a slight collapse at the center.

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Lapping zone of column
  • Ans. 

    Lapping zone of column is where two reinforcement bars overlap to ensure continuity of load transfer.

    • Lapping zone should be at least 50 times the diameter of the smaller bar away from the face of the support.

    • Proper lapping length is crucial for structural integrity and load distribution.

    • Lapping should be staggered in multiple layers for better strength.

    • Ensure proper cover and clear spacing around the lapping zone to pr...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Technical experience
  • Q2. Willing to travel

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Cement ka grade
  • Ans. 

    Cement grades indicate the strength and quality of cement, essential for construction projects.

    • Cement grades are classified based on their compressive strength, measured in megapascals (MPa).

    • Common grades include 33, 43, and 53, with 53 being the highest strength cement.

    • Grade 33 is suitable for general construction, while Grade 53 is used for high-strength applications.

    • Higher grade cement allows for thinner structures ...

  • Answered by AI
  • Q2. Cancrete M20 retio
  • Ans. 

    M20 concrete mix ratio is 1:1.5:3, indicating 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.

    • M20 concrete is a nominal mix with a characteristic compressive strength of 20 MPa.

    • The mix ratio of 1:1.5:3 is commonly used for medium-strength structures.

    • For example, in a 1 cubic meter mix, you would use approximately 400 kg of cement, 600 kg of sand, and 1200 kg of aggregate.

    • Water-cement ratio is crucial; ty...

  • Answered by AI
  • Q3. What is tha water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio affects the strength and durability of concrete.

    • Lower water cement ratio results in stronger concrete but may be difficult to work with.

    • Typical water cement ratio ranges from 0.4 to 0.6 for normal strength concrete.

    • Excess water can lead to lower strength and durability of concrete.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's complete my process job
Request company

Civil Engineer Interview Questions & Answers

user image Sachin Aswal

posted on 12 Oct 2023

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
No response
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Civil engineering
  • Q2. QA/QC CIVIL ENGINEER
  • Q3. Concrete and bitumen

Interview Preparation Tips

Interview preparation tips for other job seekers - My mane is Sachin aswal
I am from uttrakhand
I am completely 12th - 2028 and completely diploma 2021
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Question about past experiences
  • Q2. Salary expectations
Round 3 - Technical 

(2 Questions)

  • Q1. Questions related to previous job roles and responsibilities
  • Q2. Questions about the the Designation you are interviewing for

Interview Preparation Tips

Interview preparation tips for other job seekers - Most of the questions will be related to your current role, so be clear with that. And take it easy and always remember to ask the interviewer a couple of questions at the end..
Good luck
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Aptitude Test 

Duration = 30 mins topic:- civil engg basics

Round 2 - Technical 

(3 Questions)

  • Q1. ALL QUESTIONS RELATED TO CIVIL ENGG BASICS
  • Q2. VOLUME OF CEMENT IN LITERS OR M^3
  • Ans. 

    The volume of cement can be calculated in liters or cubic meters.

    • The volume of cement is calculated by multiplying the area of the surface to be covered by the thickness of the cement layer.

    • The volume of cement can be calculated in liters by converting the cubic meters to liters.

    • For example, if the area to be covered is 10 square meters and the thickness of the cement layer is 0.1 meters, then the volume of cement requ...

  • Answered by AI
  • Q3. QUESTIONS BASED ON YOUR FAVORITE SUBJECT
Round 3 - HR 

(2 Questions)

  • Q1. RATE THE INTERVIEW FROM 1-10
  • Q2. GIVE REASON FOR YOUR RATING

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST ANSWER THE QUESTIONS WHICH YOU KNOW PERFECTLY ABOUT AND IF YOU DONT KNOW THE ANSWER TO A QUESTION THEN SAY SO AS YOU ARE APPLYING FOR TRAINEE IT IS UNDERSTOOD THAT YOU WOULD NOT KNOW MOST OF THE CONCEPTS PRACTICALLY

I applied via Approached by Company and was interviewed in Aug 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About myself and salary expectations.... And the further proceedings
Round 3 - Technical 

(7 Questions)

  • Q1. Questions from IS Code 1200
  • Q2. All construction materials watage percentages
  • Ans. 

    The wastage percentages of construction materials vary depending on the type of material and the project requirements.

    • Wastage percentages can range from 2-5% for cement and steel to 10-15% for bricks and tiles.

    • Factors that affect wastage include the skill level of workers, the quality of materials, and the complexity of the project.

    • Proper planning and management can help minimize wastage and reduce project costs.

    • Regula...

  • Answered by AI
  • Q3. Rolling margin of steel
  • Ans. 

    Rolling margin of steel is the difference between the cost of producing steel and the selling price.

    • It is a measure of profitability for steel manufacturers.

    • It is calculated by subtracting the cost of production from the selling price.

    • A higher rolling margin indicates higher profitability.

    • Factors that affect rolling margin include raw material costs, energy costs, and market demand.

  • Answered by AI
  • Q4. Worker productivity and machinaries productivity for planning
  • Ans. 

    Worker and machinery productivity are crucial for effective planning.

    • Worker productivity can be measured by the amount of work completed in a given time period.

    • Machinery productivity can be measured by the amount of output produced by the machinery in a given time period.

    • Both worker and machinery productivity should be taken into account when planning to ensure efficient use of resources.

    • For example, if workers are mor...

  • Answered by AI
  • Q5. About my previous employment roles and responsibilities
  • Q6. List of deductions in client bill
  • Ans. 

    Deductions in client bill include taxes, discounts, late fees, and service charges.

    • Taxes: Sales tax, VAT, GST, etc.

    • Discounts: Promotions, loyalty rewards, bulk discounts, etc.

    • Late fees: Charges for overdue payments.

    • Service charges: Fees for additional services provided.

  • Answered by AI
  • Q7. Retention and TDS in sub con bill
  • Ans. 

    Retention and TDS are important factors to consider in subcontractor billing.

    • Retention refers to the amount of money withheld by the client as a form of security against any defects or issues that may arise after the project is completed.

    • TDS (Tax Deducted at Source) is the tax deducted by the client from the subcontractor's payment and deposited with the government.

    • Both retention and TDS should be clearly mentioned in ...

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. It was happened with site Site personal and questions are so basics
Round 5 - HR 

(1 Question)

  • Q1. Salary negotiation and decission about all benefits

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare and be strong in you role, Questions will be simple, if u r good in your path.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. This was a technical question
  • Q2. This was second round from RM
Round 3 - One-on-one 

(1 Question)

  • Q1. There was no more questions
Round 4 - One-on-one 

(2 Questions)

  • Q1. This was a HR round
  • Q2. This was a final round

Top trending discussions

View All
Interview Tips & Stories
2w
boredinlife
·
works at
Mercer
I left in the middle of an interview.
M a self-taught developer. been working really hard, trying to break into tech. Two days ago, I got approached by an hr from this e learning company for an IT role. I was super nervous but also excited because it felt like maybe this is it. The interview was on teams with 9 experienced pros all with degrees and certifications while I had no formal IT background, just self-taught skills. I felt completely out of place. Most of the interviewers were kind and said I could learn on the job. But one person kept throwing back-to-back questions with shady comments after every answer made me feel like I wasn’t good enough. It crushed my confidence About 10 minutes before the interview ended, I panicked. Anxiety took over, so I faked a network issue and left the call. Then I just broke down. I didn’t want to be disrespectful, so I quickly emailed saying I got disconnected. Truth is, I was overwhelmed and felt like a total fraud. I’ve wanted a job in tech for so long.
Got a question about HCC Infrastructure?
Ask anonymously on communities.

HCC Infrastructure Interview FAQs

How many rounds are there in HCC Infrastructure interview?
HCC Infrastructure interview process usually has 2-3 rounds. The most common rounds in the HCC Infrastructure interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in HCC Infrastructure interview?

Some of the top questions asked at the HCC Infrastructure interview -

  1. If we select you for Post in jharkhand instead of MEP will you j...read more
  2. How much quantity 1 roller can compact in one d...read more
  3. Any project is budget low and how to effectively compl...read more
How long is the HCC Infrastructure interview process?

The duration of HCC Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

3.5/5

based on 22 interview experiences

Difficulty level

Easy 20%
Moderate 70%
Hard 10%

Duration

Less than 2 weeks 70%
2-4 weeks 10%
4-6 weeks 20%
View more

HCC Infrastructure Reviews and Ratings

based on 78 reviews

4.3/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.7

Salary

4.0

Job security

4.0

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 78 Reviews and Ratings
Civil Site Engineer
16 salaries
unlock blur

₹2.9 L/yr - ₹5.8 L/yr

Civil Engineer
13 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Senior Legal Officer
6 salaries
unlock blur

₹9 L/yr - ₹18 L/yr

Senior Engineer
6 salaries
unlock blur

₹6.8 L/yr - ₹11.4 L/yr

Site Engineer
6 salaries
unlock blur

₹3.2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare HCC Infrastructure with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
write
Share an Interview