I appeared for an interview before Apr 2024, where I was asked the following questions.
Top trending discussions
posted on 28 Jul 2022
I applied via Approached by Company and was interviewed in Jan 2022. There were 2 interview rounds.
Handled various claims related to delays, cost overruns, and scope changes, ensuring compliance with contract terms.
Managed a delay claim due to unforeseen site conditions, referencing the Force Majeure clause.
Addressed a cost overrun claim by invoking the Change Order clause, ensuring proper documentation was submitted.
Resolved a scope change dispute by applying the Variations clause, negotiating additional compensati...
FIDIC defines Employer, Engineer and Contractor in construction contracts.
Employer: The party who engages the Contractor to carry out the works.
Engineer: The party appointed by the Employer to supervise the works and administer the contract.
Contractor: The party who undertakes to carry out the works in accordance with the contract.
FIDIC stands for International Federation of Consulting Engineers.
FIDIC contracts are wid...
FIDIC Red Book is for construction works while Yellow Book is for plant and design-build projects.
Red Book is for construction works while Yellow Book is for plant and design-build projects.
Red Book has more detailed provisions for construction works than Yellow Book.
Yellow Book has more flexibility in design and construction than Red Book.
Red Book has a higher emphasis on quality control and assurance than Yellow Book...
Explanation of variation clause, price variation, value engineering, suspension as per FIDIC.
Variation clause allows for changes in the scope of work.
Price variation allows for adjustments in contract price due to changes in market conditions.
Value engineering is a process of optimizing the value of the project by reducing costs while maintaining quality.
Suspension allows for temporary cessation of work due to unforese...
Price variation clause is required in contract to account for changes in market conditions and prevent financial loss.
Protects both parties from financial loss due to unforeseen circumstances
Allows for adjustments to be made to the contract price based on changes in market conditions
Helps to ensure that the contract remains fair and equitable for both parties
Commonly used in long-term contracts where market conditions ...
I appeared for an interview in Aug 2019.
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment dams.
Tu...
Density is the measure of mass per unit volume of a substance.
It is a physical property of matter.
It is calculated by dividing the mass of a substance by its volume.
Units of density include kg/m³, g/cm³, and lb/ft³.
Density can be used to identify substances and determine their purity.
For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors that...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may vary d...
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure ...
posted on 29 Jan 2021
posted on 20 Dec 2020
posted on 28 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
The elongation % of steel fy 500 is approximately 12%.
Elongation % is the measure of ductility of a material.
It is the percentage increase in length of a material before it fractures under tension.
For steel fy 500, the elongation % is approximately 12%.
This means that the steel can stretch up to 12% of its original length before it breaks.
Currently, I am working as a Site Engineer, focusing on project management, quality control, and ensuring safety standards on-site.
Overseeing daily operations on construction sites to ensure projects are on schedule.
Coordinating with subcontractors and suppliers to maintain workflow; for example, managing concrete deliveries.
Conducting regular site inspections to ensure compliance with safety regulations and quality st...
Faced challenges in project delays and resource management, overcame them through effective communication and strategic planning.
Encountered delays due to weather conditions; implemented a flexible schedule to accommodate lost time.
Faced resource shortages; negotiated with suppliers for expedited delivery and sourced alternative materials.
Dealt with miscommunication among team members; organized regular meetings to ens...
In the next 8 years, I aspire to lead major construction projects and enhance my skills in sustainable engineering practices.
Aim to become a project manager, overseeing large-scale infrastructure projects like bridges or highways.
Pursue certifications in sustainable construction methods to contribute to eco-friendly projects.
Mentor junior engineers to foster a collaborative and innovative work environment.
Engage in con...
I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.
A circuit is a closed loop or path through which electric current flows.
A circuit consists of a power source, conductors, and a load.
There are two types of circuits: series circuit and parallel circuit.
In a series circuit, the current flows through each component in sequence.
In a parallel circuit, the current splits and flows through multiple paths.
Circuits can be found in various electrical devices and systems, such a...
Mortar is a mixture of cement, sand, and water used in construction. A circuit is a closed loop of electrical components.
Mortar is a binding material used in construction to hold bricks or stones together.
It is made by mixing cement, sand, and water in specific proportions.
Mortar hardens over time and provides strength and stability to the structure.
Circuits are pathways through which electricity flows.
They consist of ...
AC and DC are two types of electrical current. AC stands for Alternating Current and DC stands for Direct Current.
AC (Alternating Current) is a type of electrical current that periodically changes direction.
DC (Direct Current) is a type of electrical current that flows in only one direction.
AC is commonly used in household electrical systems, while DC is used in batteries and electronic devices.
AC can be easily convert...
Artificial intelligence
Different types of slabs include one-way slab, two-way slab, flat slab, ribbed slab, waffle slab, and hollow core slab.
One-way slab: supported on two opposite sides and bends in only one direction
Two-way slab: supported on all four sides and bends in two directions
Flat slab: without beams and supported directly on columns
Ribbed slab: with ribs on the underside for added strength and reduced weight
Waffle slab: with grid...
Different types of slabs foundation include raft, mat, flat plate, and waffle slab foundations.
Raft foundation: a solid reinforced concrete slab that covers the entire area under a building
Mat foundation: a thick concrete slab used to support heavy structures or buildings
Flat plate foundation: a simple and economical type of foundation with a uniform thickness
Waffle slab foundation: a type of foundation with grid-like ...
based on 1 interview experience
Difficulty level
Duration
based on 2 reviews
Rating in categories
Civil Site Engineer
16
salaries
| ₹2.9 L/yr - ₹5.8 L/yr |
Civil Engineer
13
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Senior Legal Officer
6
salaries
| ₹9 L/yr - ₹18 L/yr |
Senior Engineer
6
salaries
| ₹6.8 L/yr - ₹11.4 L/yr |
Site Engineer
6
salaries
| ₹3.2 L/yr - ₹4.5 L/yr |