Filter interviews by
Modules in loops are essential for controlling processes in automation systems, ensuring efficient operation and monitoring.
Control Modules: Used to manage and regulate the process, e.g., PID controllers.
Input Modules: Collect data from sensors, e.g., temperature or pressure sensors.
Output Modules: Send commands to actuators, e.g., valves or motors.
Communication Modules: Facilitate data exchange between devices, e...
A smoke detector is a device that senses smoke as an indicator of fire, triggering alarms for safety.
Types of smoke detectors: Ionization (detects fast-flaming fires) and Photoelectric (detects smoldering fires).
Working process: Ionization detectors use radioactive material to ionize air, creating a current that changes when smoke enters.
Photoelectric detectors use a light beam; smoke particles scatter the light, ...
Working for AGL involves contributing to energy solutions, focusing on sustainability and innovation in the energy sector.
AGL is a leading energy provider in Australia, focusing on renewable energy sources.
Employees are encouraged to innovate, with programs supporting new ideas for energy efficiency.
AGL promotes a collaborative work environment, fostering teamwork across various departments.
The company invests in ...
The name is a fundamental aspect of identity, representing an individual or entity in social and legal contexts.
Names can be personal (e.g., John Smith) or organizational (e.g., Acme Corp).
They often carry cultural significance, reflecting heritage or family history.
In legal documents, names are crucial for identification and accountability.
Names can also change due to marriage, personal choice, or legal reasons.
Key initiatives for electrification include technology adoption, infrastructure development, and stakeholder engagement.
Invest in R&D for advanced battery technologies to improve energy density and reduce costs.
Develop charging infrastructure partnerships with local governments and private sectors to enhance accessibility.
Implement pilot programs for electric vehicle (EV) fleets in urban areas to demonstrate f...
I worked on various electrical projects, focusing on renewable energy, automation, and circuit design.
Developed a solar panel installation project that increased energy efficiency by 30%.
Designed an automated irrigation system using microcontrollers for precision farming.
Worked on a circuit design project for a smart home system, integrating IoT devices.
Sizing control valves involves flow requirements, pressure drop, and valve characteristics for optimal performance.
Determine the flow rate: Calculate the required flow rate in GPM or L/min based on the process needs.
Assess pressure drop: Evaluate the allowable pressure drop across the valve to ensure efficient operation.
Consider fluid properties: Analyze the type of fluid (liquid, gas, or vapor) and its characteri...
PSV case scenarios in columns involve pressure safety valves to prevent overpressure and ensure safe operation.
PSV stands for Pressure Safety Valve, crucial for protecting columns from overpressure.
In distillation columns, PSVs prevent damage from vapor pressure exceeding design limits.
Example: If a column experiences a sudden temperature rise, the PSV opens to release excess pressure.
Regular maintenance and testi...
I can add value by optimizing processes, enhancing team performance, and ensuring efficient resource management.
Implement process improvements: For example, using Lean methodologies to reduce waste in operations.
Enhance team collaboration: Organizing regular team meetings to foster communication and share best practices.
Utilize data analytics: Analyzing performance metrics to identify areas for improvement and mak...
I have extensive experience in drafting and design, focusing on precision and attention to detail in various projects.
Worked for 3 years at XYZ Engineering, creating detailed technical drawings for mechanical components.
Utilized AutoCAD and SolidWorks to produce 2D and 3D models, enhancing project visualization.
Collaborated with engineers and architects to ensure designs met specifications and standards.
Participat...
I applied via Campus Placement and was interviewed in Dec 2024. There were 2 interview rounds.
3 coding questions were given and all should have to be passed for the next round
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
I appeared for an interview in May 2025, where I was asked the following questions.
WMS (Work Management System) and WIR (Work Inspection Report) are essential tools in construction quality assurance.
WMS refers to a system that helps manage and track work processes on-site.
WIR is a document used to record inspections and ensure compliance with project specifications.
WMS can include scheduling, resource allocation, and task management.
WIR typically includes details like inspection date, location, and f...
5S is a workplace organization method, while snag refers to defects or issues in construction projects.
5S stands for Sort, Set in order, Shine, Standardize, Sustain.
Example of Sort: Removing unnecessary tools from the workspace.
Set in order: Organizing tools for easy access.
Shine: Regular cleaning of the work area to maintain hygiene.
Standardize: Creating guidelines for maintaining organization.
Sustain: Regular audits ...
A smoke detector is a device that senses smoke as an indicator of fire, triggering alarms for safety.
Types of smoke detectors: Ionization (detects fast-flaming fires) and Photoelectric (detects smoldering fires).
Working process: Ionization detectors use radioactive material to ionize air, creating a current that changes when smoke enters.
Photoelectric detectors use a light beam; smoke particles scatter the light, trigg...
Modules in loops are essential for controlling processes in automation systems, ensuring efficient operation and monitoring.
Control Modules: Used to manage and regulate the process, e.g., PID controllers.
Input Modules: Collect data from sensors, e.g., temperature or pressure sensors.
Output Modules: Send commands to actuators, e.g., valves or motors.
Communication Modules: Facilitate data exchange between devices, e.g., ...
I appeared for an interview in Apr 2025, where I was asked the following questions.
Key strengths include leadership, communication, and adaptability; weaknesses involve delegation and perfectionism.
Leadership: I foster a collaborative environment, encouraging team members to share ideas and take ownership of their projects.
Communication: I prioritize clear and open communication, ensuring that everyone is aligned on goals and expectations, which enhances team productivity.
Adaptability: I thrive in dy...
Key initiatives for electrification include technology adoption, infrastructure development, and stakeholder engagement.
Invest in R&D for advanced battery technologies to improve energy density and reduce costs.
Develop charging infrastructure partnerships with local governments and private sectors to enhance accessibility.
Implement pilot programs for electric vehicle (EV) fleets in urban areas to demonstrate feasib...
I applied via LinkedIn and was interviewed in Sep 2024. There were 2 interview rounds.
It was a combination of Maths and Electronics basics.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
I have worked on various projects including a web development project, a data analysis project, and a machine learning project.
Developed a website for a local business using HTML, CSS, and JavaScript.
Conducted data analysis on customer feedback data to identify trends and make recommendations for improvement.
Implemented a machine learning algorithm to predict customer churn for a telecom company.
A dedicated System Engineer with expertise in designing, implementing, and maintaining complex systems and networks.
Over 5 years of experience in system engineering roles, focusing on network architecture and security.
Proficient in various operating systems, including Linux and Windows Server, with hands-on experience in system administration.
Skilled in scripting languages like Python and Bash to automate tasks and imp...
I have experience working with various building automation systems, including but not limited to Siemens, Honeywell, and Johnson Controls.
Experience with Siemens building automation systems
Experience with Honeywell building automation systems
Experience with Johnson Controls building automation systems
I applied via LinkedIn and was interviewed in Mar 2024. There were 2 interview rounds.
Handled various claims for EPC projects including delay claims, variation claims, and cost overrun claims.
Successfully resolved delay claims by analyzing project schedules and identifying critical path delays.
Negotiated settlement for variation claims by reviewing contract documents and scope changes.
Managed cost overrun claims by tracking project expenses and identifying areas for cost reduction.
Implemented strategies...
Addressing client-induced losses through negotiation and contract interpretation.
Review the contract terms to identify any clauses related to client responsibilities and contractor protections.
Gather evidence of the client's actions that led to losses, such as correspondence, project timelines, and financial records.
Schedule a meeting with the client to discuss the situation, presenting the evidence clearly and profess...
The Manager - Contracts oversees contract negotiations, compliance, and management to ensure organizational objectives are met.
Lead contract negotiations with vendors and clients to secure favorable terms.
Ensure compliance with legal and regulatory requirements, such as reviewing contracts for adherence to laws.
Manage contract lifecycle from initiation to execution, including amendments and renewals.
Collaborate with cr...
Proactive contract management involves anticipating and preventing issues, while reactive contract management involves responding to issues as they arise.
Proactive contract management involves setting clear expectations, monitoring performance, and addressing potential issues before they escalate.
Reactive contract management involves resolving disputes, renegotiating terms, and mitigating risks after issues have alread...
Discuss the importance of adhering to contract terms and the potential consequences of agreeing to variations without proper review.
Explain the importance of contract terms and the potential legal implications of not adhering to them
Highlight the need for project managers to consult the contract before agreeing to any variations
Suggest implementing a process where all variations must be reviewed by the contracts manage...
Contract amendments are required to modify terms, conditions, or scope of the original agreement.
To update pricing or payment terms
To extend or shorten the duration of the contract
To add or remove services or products
To address unforeseen circumstances or changes in requirements
To correct errors or ambiguities in the original contract
Client suspends work due to defective materials; explore contract implications and resolution strategies.
Review the contract terms regarding material quality and defects.
Assess the impact of the defect on project timelines and costs.
Communicate with the contractor to understand the defect's cause.
Consider potential remedies, such as replacement of materials or financial compensation.
Document all communications and deci...
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
2 DSA questions. one of DP and other on LinkedLists medium level questions.
I admire your company's commitment to innovation and excellence, and I believe my skills align perfectly with your goals.
Your company's reputation for cutting-edge technology aligns with my passion for innovation, as seen in my previous project where I led a team to develop a new software solution that increased efficiency by 30%.
I am impressed by your commitment to employee development, which resonates with my belief ...
I can join as soon as possible, ideally within two weeks, to ensure a smooth transition and handover from my current role.
I am currently in a position where I can provide a two-week notice to my employer.
This timeframe allows me to wrap up my current projects and ensure a smooth transition.
If needed, I can negotiate an earlier start date depending on the urgency of the role.
I appeared for an interview in Apr 2025, where I was asked the following questions.
Top trending discussions
Some of the top questions asked at the Honeywell Automation interview -
The duration of Honeywell Automation interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 100 interview experiences
Difficulty level
Duration
based on 1.8k reviews
Rating in categories
System Engineer
479
salaries
| ₹7.7 L/yr - ₹17.7 L/yr |
Project Engineer
320
salaries
| ₹4.4 L/yr - ₹9.5 L/yr |
Software Engineer
251
salaries
| ₹8.3 L/yr - ₹21 L/yr |
Service Engineer
235
salaries
| ₹2.4 L/yr - ₹7.8 L/yr |
Senior Engineer
189
salaries
| ₹9.8 L/yr - ₹18 L/yr |
Siemens
Schneider Electric
Johnson Controls
Rockwell Automation