Filter interviews by
Yes, I am ready to travel outside India for project assignments and to gain international experience.
I have previously traveled for work to countries like Germany and the UAE, enhancing my project management skills.
Traveling allows me to collaborate with diverse teams and understand global engineering practices.
I am adaptable and can quickly adjust to new environments and cultures, which is crucial for project suc...
Technical knowledge for a Project Engineer involves understanding engineering principles, project management, and relevant technologies.
Understand engineering principles: Knowledge of mechanics, thermodynamics, and materials science is crucial.
Project management skills: Familiarity with methodologies like Agile or Waterfall can enhance project delivery.
Software proficiency: Experience with tools like AutoCAD, MS P...
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (measured in watts) to apparent power (measured in volt-amperes).
It indicates the efficiency of power usage in a circuit.
A power factor of 1 means all the power is being used effectively, while a power factor less than 1 indicates wastage of power.
Inductive loads like electric motors hav...
Predictive Maintenance is a proactive approach that uses data analysis to predict equipment failures and schedule maintenance before they occur.
Predictive Maintenance uses data analysis techniques to identify patterns and trends that indicate potential equipment failures.
It involves monitoring equipment performance in real-time and collecting data on factors such as temperature, vibration, and energy consumption.
B...
An object drawing example in 2D
Start by identifying the object you want to draw
Determine the scale and dimensions of the drawing
Use appropriate tools like rulers, compass, and protractors
Sketch the basic outline of the object
Add details and shading to enhance the drawing
Label important features or measurements
Review and refine the drawing for accuracy
ESD line monitoring is required for DI channels.
ESD line monitoring is necessary to prevent damage to sensitive electronic equipment.
DI channels are particularly vulnerable to ESD damage.
ESD line monitoring can be achieved through the use of ESD protection devices and regular testing.
Regular maintenance and calibration of monitoring equipment is also important.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
An object drawing example in 2D
Start by identifying the object you want to draw
Determine the scale and dimensions of the drawing
Use appropriate tools like rulers, compass, and protractors
Sketch the basic outline of the object
Add details and shading to enhance the drawing
Label important features or measurements
Review and refine the drawing for accuracy
I applied via Company Website and was interviewed before Dec 2023. There were 2 interview rounds.
ESD line monitoring is required for DI channels.
ESD line monitoring is necessary to prevent damage to sensitive electronic equipment.
DI channels are particularly vulnerable to ESD damage.
ESD line monitoring can be achieved through the use of ESD protection devices and regular testing.
Regular maintenance and calibration of monitoring equipment is also important.
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There were 2 interview rounds.
Moderate to difficult
Technical knowledge for a Project Engineer involves understanding engineering principles, project management, and relevant technologies.
Understand engineering principles: Knowledge of mechanics, thermodynamics, and materials science is crucial.
Project management skills: Familiarity with methodologies like Agile or Waterfall can enhance project delivery.
Software proficiency: Experience with tools like AutoCAD, MS Projec...
I applied via Referral and was interviewed before Feb 2021. There were 2 interview rounds.
Shortlist in interview round after that training for final shortlist
Top trending discussions
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
Surge arrestors protect electrical equipment from voltage spikes and surges.
Surge arrestors are devices that limit the voltage supplied to electrical equipment during a surge or spike.
They protect equipment from damage caused by overvoltage.
Surge arrestors are commonly used in power distribution systems, telecommunications networks, and electronic equipment.
They work by diverting excess voltage to the ground, preventin...
based on 4 interview experiences
Difficulty level
Duration
based on 67 reviews
Rating in categories
System Engineer
481
salaries
| ₹7.8 L/yr - ₹17.7 L/yr |
Project Engineer
320
salaries
| ₹4.4 L/yr - ₹9.5 L/yr |
Software Engineer
251
salaries
| ₹8.3 L/yr - ₹21 L/yr |
Service Engineer
235
salaries
| ₹2.4 L/yr - ₹7.8 L/yr |
Senior Engineer
189
salaries
| ₹9.8 L/yr - ₹18 L/yr |
Siemens
Schneider Electric
Johnson Controls
Rockwell Automation