In this aptitude test are held on some mathematics questions and computer based questions.
Computer programming language is a set of instructions used to communicate with a computer. To download information from the internet, you can use web scraping techniques.
Computer programming language is a way to communicate with computers through a set of instructions.
To download information from the internet, you can use web scraping techniques like using libraries such as BeautifulSoup in Python or requests in JavaS...
Top trending discussions
posted on 12 Sep 2022
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 20 Jun 2022
I applied via Naukri.com and was interviewed before Jun 2021. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
based on 1 interview experience
Senior Engineer
36
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |
Assistant Manager
23
salaries
| ₹6 L/yr - ₹11 L/yr |
Deputy Manager
22
salaries
| ₹8.4 L/yr - ₹12.5 L/yr |
Engineer
13
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Senior Manager
10
salaries
| ₹12 L/yr - ₹16.5 L/yr |
L&T Construction
Tata Projects
Simplex Infrastructures
ITD Cementation India