Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects Verified Tick Work with us arrow

Compare button icon Compare button icon Compare

Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Deputy Manager Interview Questions and Answers

Updated 4 Jul 2025

19 Interview questions

A Deputy Manager was asked 6mo ago
Q. How do you calculate the weight of steel?
Ans. 

The weight of steel can be calculated using its density and volume.

  • Calculate the volume of the steel object in cubic meters

  • Determine the density of the specific type of steel being used

  • Multiply the volume by the density to get the weight in kilograms

  • For example, if the volume of steel is 0.5 cubic meters and the density is 7850 kg/m^3, the weight would be 3925 kg

🔥 Asked by recruiter 2 times
A Deputy Manager was asked 6mo ago
Q. What is civil engineering?
Ans. 

Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.

  • Involves designing and constructing buildings, bridges, roads, dams, and other structures

  • Focuses on ensuring structures are safe, functional, and sustainable

  • Requires knowledge of materials, construction techniques, and project management

  • Involves collaboration with architects, contractor...

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sell our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you would check to sanction a loan ... read more
Q4. What actions do you take when there is a shortage of materials re ... read more
asked in ICICI Bank
Q5. Which do you prioritize: quality or quantity, and why?
A Deputy Manager was asked 12mo ago
Q. How long does it take to construct a 33kV Substation, assuming all materials are available on time?
Ans. 

The construction of a 33kV Substation depends on various factors such as location, size, design, and availability of materials.

  • Construction time can vary based on the complexity of the project and the efficiency of the construction team.

  • Availability of all materials on time is crucial to avoid delays in the construction process.

  • Factors like weather conditions, permits, and inspections can also impact the construct...

A Deputy Manager was asked
Q. What percentage of tolerance is acceptable in received values?
Ans. 

The acceptable tolerance in % value during receipts depends on the company's policies and industry standards.

  • The acceptable tolerance in % value during receipts can vary depending on the nature of the business.

  • Some companies may have a strict tolerance limit of 1-2% to ensure accuracy in financial records.

  • Other industries, such as retail, may have a higher tolerance limit of 5-10% due to factors like pricing error...

A Deputy Manager was asked
Q. What is quantity surveying?
Ans. 

Quantity surveying is the process of managing costs and budgets for construction projects.

  • Involves estimating and monitoring costs throughout the project

  • Includes preparing tender documents, negotiating contracts, and valuing completed work

  • Helps ensure projects are completed within budget and on time

  • Requires knowledge of construction methods, materials, and regulations

What are the roles & responsibilities of a Deputy Manager at Tata Projects?

Procurement Management

  • Consolidate procurement requirements across projects
  • Identify and evaluate potential suppliers
  • Negotiate pricing and secure cost-effective agreements

Read full roles & responsibilities

A Deputy Manager was asked
Q. What can be done to remove voids between aggregates during concreting?
Ans. 

To remove voids between aggregates while concreting, proper compaction techniques should be used.

  • Use vibrating equipment to settle the concrete and remove air voids

  • Ensure proper grading and mix design to minimize voids

  • Use additives like superplasticizers to improve workability and reduce voids

  • Properly consolidate the concrete by using appropriate techniques such as rodding or tamping

Tata Projects HR Interview Questions

81 questions and answers

Q. What are your roles and responsibilities?
Q. What are the reasons for your decision to leave your current employer?
Q. What are your expectations from TPL?
A Deputy Manager was asked
Q. What is the permissible wastage of steel and cement?
Ans. 

The permissible wastage of steel and cement varies depending on the project and the contractor's agreement.

  • Permissible wastage of steel and cement is usually specified in the contract agreement between the contractor and the client.

  • The percentage of permissible wastage can vary depending on the project and the type of steel and cement being used.

  • In general, the permissible wastage of steel is around 3-5%, while fo...

Are these interview questions helpful?
A Deputy Manager was asked
Q. What actions do you take when there is a shortage of materials received?
Ans. 

When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

  • Contact the supplier to inform them about the shortage and request immediate resolution

  • Check inventory records and cross-verify with the supplier's delivery documentation

  • Investigate the cause of the shortage, such as shipping errors or miscommunication

  • Implement measures to prevent future ...

A Deputy Manager was asked
Q. How do you determine the rate for 1 cubic meter of RCC for M10 and M20 grades?
Ans. 

To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

  • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

  • Calculate the labor cost involved in the construction process

  • Consider the cost of equipment required for the construction process

  • Include overheads like transportation, insurance, and taxes

  • Compare t...

A Deputy Manager was asked
Q. What does the workability of concrete mean? How will you measure the slump value of M30 concrete? What does bar bending schedule means?
Ans. 

Workability of concrete refers to its ease of placement and compaction. Slump value of M30 concrete is measured using a slump cone. Bar bending schedule is a document detailing the reinforcement steel bars in a structure.

  • Workability of concrete refers to how easily it can be mixed, placed, and compacted.

  • Slump value of M30 concrete is measured using a slump cone test, where the concrete is placed in the cone and th...

Tata Projects Deputy Manager Interview Experiences

22 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Related to Railway construction and maintenance related questions

Deputy Manager Interview Questions & Answers

user image ANUPAM THAKUR

posted on 12 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Maintenance, Service, oil
  • Q2. Polymer use, reuse, LG, HIRA, lifting plan
Round 2 - Technical 

(1 Question)

  • Q1. Lifting plan, tendum lifting, HIRA

Deputy Manager Interview Questions & Answers

user image Kundal Sharma

posted on 14 Jan 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. What is civil engineering?
  • Ans. 

    Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.

    • Involves designing and constructing buildings, bridges, roads, dams, and other structures

    • Focuses on ensuring structures are safe, functional, and sustainable

    • Requires knowledge of materials, construction techniques, and project management

    • Involves collaboration with architects, contractors, an...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How much does it takes for construction of 33kV Ss subjected to availability of all materials on time.
  • Ans. 

    The construction of a 33kV Substation depends on various factors such as location, size, design, and availability of materials.

    • Construction time can vary based on the complexity of the project and the efficiency of the construction team.

    • Availability of all materials on time is crucial to avoid delays in the construction process.

    • Factors like weather conditions, permits, and inspections can also impact the construction t...

  • Answered by AI
  • Q2. Density of Steel, Fresh water and sea water
  • Ans. 

    Density of steel is higher than fresh water and sea water.

    • Density of steel is around 7850 kg/m^3

    • Density of fresh water is around 1000 kg/m^3

    • Density of sea water is around 1025 kg/m^3

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be truthful and genuine
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

On subject matter related to legal compliance.

Round 2 - HR 

(1 Question)

  • Q1. Location preferences, salary negotiations and grade and structure

Deputy Manager Interview Questions & Answers

user image Loganathan Natarajan

posted on 20 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About Substations

Interview Preparation Tips

Interview preparation tips for other job seekers - Good work place to get knowledge in your core side.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions for your relative job.
Round 3 - One-on-one 

(1 Question)

  • Q1. Name previous company.what do you of work.
  • Ans. 

    I worked at XYZ Company as a Deputy Manager.

    • Managed a team of 10 employees

    • Implemented new strategies to increase productivity

    • Achieved a 20% increase in sales within the first year

    • Streamlined processes to improve efficiency

  • Answered by AI

Deputy Manager Interview Questions & Answers

user image ritesh maurya

posted on 19 Jun 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. BRIEF INTRODUCTION ABOUT THE WORKS ONE IS EXECUTING AT THEIR CURRENT ROLE AND BASED ON THAT CASE STUDY GIVEN FOR OPTIMAL SOLUTION
  • Ans. ONE HAS BE MENTALLY PREPARED FOR ASWERING THE QUESTIONS W.R.T. SENARIOS GIVEN BASED ON YOUR INPUTS
  • Answered by ritesh maurya
Round 3 - HR 

(2 Questions)

  • Q1. QUESTIONS RELATED TO " WHY YOU ARE SWITCHING, ROLES AND RESPONSIBILITIES, EXPECTATIONS AND SALARY STRUCTURE WITH ACCEPTANCE
  • Q2. ONE CAN ANSWER BASED ON THEIR SITUATION AND OPTIMALLY CONVINCING SKILLS
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I appeared for an interview before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. How to calculate the weight of the steel?
  • Q2. Square of Dia of bar /162 or Desity of the steel * Area of the steel
  • Ans. 

    The question is asking for the calculation of either the square of the diameter of a bar divided by 162 or the density of the steel multiplied by the area of the steel.

    • Calculate the square of the diameter of the bar and divide by 162

    • Calculate the density of the steel and multiply by the area of the steel

    • Compare the two results to determine the answer

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Certificate verification & Salary Negotiation
  • Q2. Verified certificates & Negotiate Salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and give a proper answer when you know
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why there are cracks in PQC? What are the test & checks you will perform during pqc. What are its pre & post checks. How you arrested cracks in PQC Which curing compound you have used during pqc
  • Ans. 

    Cracks in PQC occur due to various reasons such as improper curing, poor quality of materials, and inadequate thickness. Tests and checks performed during PQC include slump test, compressive strength test, and surface hardness test. Pre-checks include ensuring proper subgrade preparation and post-checks include checking for cracks and surface defects. Cracks can be arrested by using epoxy injection or polyurethane grou...

  • Answered by AI
  • Q2. How you have done airfield marking. What was the type of marking in airport.
  • Ans. 

    I have experience in airfield marking using various types of markings such as runway centerline, taxiway edge, and hold line markings.

    • I have used paint and thermoplastic materials for marking.

    • I have followed FAA regulations and guidelines for marking dimensions and placement.

    • I have also assisted in the maintenance and repainting of existing markings.

    • Examples of markings I have done include runway threshold markings, to...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Projects Deputy Manager interview:
  • PQC
  • Airfield marking
Interview preparation tips for other job seekers - Grow your communication skills & networking in the particular field you are involved in.

Top trending discussions

View All
Interview Hub
3d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Tata Projects?
Ask anonymously on communities.

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Deputy Manager interview?
Tata Projects interview process usually has 2-3 rounds. The most common rounds in the Tata Projects interview process are Technical, Resume Shortlist and HR.
How to prepare for Tata Projects Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tata Projects. The most common topics and skills that interviewers at Tata Projects expect are Arbitration, Bid Evaluation, Bid Management, Contract Administration and Contract Labour.
What are the top questions asked in Tata Projects Deputy Manager interview?

Some of the top questions asked at the Tata Projects Deputy Manager interview -

  1. What we do for shortage of material receiv...read more
  2. Can we do correction in invoice? if ans is yes then what are the further ste...read more
  3. Why there are cracks in PQC? What are the test & checks you will perform during...read more
What are the most common questions asked in Tata Projects Deputy Manager HR round?

The most common HR questions asked in Tata Projects Deputy Manager interview are -

  1. What are your strengths and weakness...read more
  2. What are your salary expectatio...read more
  3. What is your family backgrou...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.7/5

based on 33 interview experiences

Difficulty level

Easy 17%
Moderate 58%
Hard 25%

Duration

Less than 2 weeks 40%
2-4 weeks 20%
4-6 weeks 20%
6-8 weeks 10%
More than 8 weeks 10%
View more
Join Tata Projects Simplify. Create.
Tata Projects Deputy Manager Salary
based on 1.6k salaries
₹9 L/yr - ₹15.5 L/yr
18% more than the average Deputy Manager Salary in India
View more details

Tata Projects Deputy Manager Reviews and Ratings

based on 322 reviews

4.2/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

4.0

Salary

4.2

Job security

3.9

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 322 Reviews and Ratings
Deputy Manager
1.6k salaries
unlock blur

₹9 L/yr - ₹15.5 L/yr

Assistant Manager
887 salaries
unlock blur

₹5.9 L/yr - ₹14.5 L/yr

Senior Engineer
475 salaries
unlock blur

₹5.1 L/yr - ₹12.5 L/yr

Manager
471 salaries
unlock blur

₹13 L/yr - ₹21 L/yr

Senior Manager
359 salaries
unlock blur

₹19 L/yr - ₹31.5 L/yr

Explore more salaries
Compare Tata Projects with

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.2
Compare

Nagarjuna Construction Company

4.1
Compare

KEC International

4.0
Compare
write
Share an Interview