Filter interviews by
PPEs are essential for ensuring safety and health in industrial workplaces, protecting workers from various hazards.
Protective clothing (e.g., coveralls) shields against chemical spills.
Safety goggles prevent eye injuries from flying debris.
Hearing protection (e.g., earplugs) is crucial in noisy environments.
Respirators safeguard against inhaling harmful dust or fumes.
Gloves protect hands from cuts, chemicals, and...
Kaizen is a Japanese philosophy focused on continuous improvement in processes, products, and workplace culture.
Originated in Japan post-World War II, emphasizing efficiency and quality.
Involves all employees in the improvement process, fostering teamwork.
Utilizes small, incremental changes rather than large-scale transformations.
Example: A factory implementing a suggestion box for workers to propose improvements.
...
POKA-YOKA is a Japanese term meaning 'mistake-proofing' to prevent errors in manufacturing processes.
Originated in Japan as part of the Toyota Production System.
Involves designing processes to eliminate or reduce human errors.
Examples include color-coded parts to prevent assembly mistakes.
Another example is using jigs or fixtures that only allow correct assembly.
The Industrial 5S system is a methodology for organizing and managing the workplace efficiently to enhance productivity.
Sort (Seiri): Remove unnecessary items from the workspace. Example: Discarding outdated tools.
Set in Order (Seiton): Organize tools and materials for easy access. Example: Labeling storage areas.
Shine (Seiso): Clean the workspace regularly to maintain a tidy environment. Example: Daily cleaning s...
Yaw systems typically use servo motors for precise control of the orientation of wind turbines or other rotating equipment.
Servo Motors: These motors provide precise control of angular position, making them ideal for yaw systems in wind turbines.
DC Brushless Motors: Commonly used in yaw systems due to their high efficiency and reliability.
Stepper Motors: Sometimes used for smaller applications where precise positi...
HAZ stands for Heat-Affected Zone, an area in materials affected by welding or heat treatment.
The HAZ is the region surrounding a weld that experiences changes in microstructure due to heat.
Properties like hardness and ductility can vary significantly in the HAZ compared to the base material.
For example, in steel welding, the HAZ may become brittle if not properly managed.
Understanding HAZ is crucial for ensuring ...
RF network communication is a wireless communication technology that uses radio frequency signals to transmit data between devices.
RF network communication allows devices to communicate wirelessly over long distances.
It is commonly used in applications such as remote monitoring, control systems, and IoT devices.
RF signals can be affected by interference, obstacles, and distance, so proper planning and design are i...
SCADA systems are used for monitoring, controlling, and managing industrial processes through centralized systems.
Monitor and control industrial processes in real-time
Collect and analyze data from sensors and equipment
Provide alarms and notifications for abnormal conditions
Remote access and control of processes
Historical data logging and reporting
Examples: monitoring oil pipelines, controlling power plants, managi...
Yes, I maintained DPR reports to track daily operations and performance.
Maintained DPR reports to track daily operations
Analyzed data to identify trends and areas for improvement
Generated reports for management review
Used DPR reports to make informed decisions and optimize processes
By prioritizing critical tasks, optimizing existing resources, and communicating effectively with suppliers and team members.
Prioritize critical tasks to ensure essential operations continue smoothly.
Optimize existing resources by reducing waste and finding alternative solutions.
Communicate effectively with suppliers to expedite material delivery or find alternative sources.
Work closely with team members to brains...
Basic Study
SCADA systems are used for monitoring, controlling, and managing industrial processes through centralized systems.
Monitor and control industrial processes in real-time
Collect and analyze data from sensors and equipment
Provide alarms and notifications for abnormal conditions
Remote access and control of processes
Historical data logging and reporting
Examples: monitoring oil pipelines, controlling power plants, managing wa...
RF network communication is a wireless communication technology that uses radio frequency signals to transmit data between devices.
RF network communication allows devices to communicate wirelessly over long distances.
It is commonly used in applications such as remote monitoring, control systems, and IoT devices.
RF signals can be affected by interference, obstacles, and distance, so proper planning and design are import...
I appeared for an interview in Feb 2025, where I was asked the following questions.
HAZ stands for Heat-Affected Zone, an area in materials affected by welding or heat treatment.
The HAZ is the region surrounding a weld that experiences changes in microstructure due to heat.
Properties like hardness and ductility can vary significantly in the HAZ compared to the base material.
For example, in steel welding, the HAZ may become brittle if not properly managed.
Understanding HAZ is crucial for ensuring the i...
I appeared for an interview before Jun 2024, where I was asked the following questions.
The Industrial 5S system is a methodology for organizing and managing the workplace efficiently to enhance productivity.
Sort (Seiri): Remove unnecessary items from the workspace. Example: Discarding outdated tools.
Set in Order (Seiton): Organize tools and materials for easy access. Example: Labeling storage areas.
Shine (Seiso): Clean the workspace regularly to maintain a tidy environment. Example: Daily cleaning schedu...
SOP (Standard Operating Procedure) and SWI (Standard Work Instruction) are essential documents for ensuring consistency in processes.
SOP outlines the overall process and objectives, while SWI provides detailed steps for specific tasks.
Example of SOP: A document detailing the procedure for handling hazardous materials in a lab.
Example of SWI: A step-by-step guide for calibrating a specific piece of laboratory equipment.
...
POKA-YOKA is a Japanese term meaning 'mistake-proofing' to prevent errors in manufacturing processes.
Originated in Japan as part of the Toyota Production System.
Involves designing processes to eliminate or reduce human errors.
Examples include color-coded parts to prevent assembly mistakes.
Another example is using jigs or fixtures that only allow correct assembly.
Kaizen is a Japanese philosophy focused on continuous improvement in processes, products, and workplace culture.
Originated in Japan post-World War II, emphasizing efficiency and quality.
Involves all employees in the improvement process, fostering teamwork.
Utilizes small, incremental changes rather than large-scale transformations.
Example: A factory implementing a suggestion box for workers to propose improvements.
Commo...
PPEs are essential for ensuring safety and health in industrial workplaces, protecting workers from various hazards.
Protective clothing (e.g., coveralls) shields against chemical spills.
Safety goggles prevent eye injuries from flying debris.
Hearing protection (e.g., earplugs) is crucial in noisy environments.
Respirators safeguard against inhaling harmful dust or fumes.
Gloves protect hands from cuts, chemicals, and heat...
My daily work as a Senior Executive in EHS involves strategic planning, compliance monitoring, and team leadership to ensure safety standards.
Conduct daily safety inspections to identify potential hazards and ensure compliance with regulations.
Lead weekly team meetings to discuss safety performance metrics and address any concerns.
Develop and implement training programs for employees on safety protocols and emergency r...
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 4 interview rounds.
Top trending discussions
The duration of Inox Wind interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 34 interview experiences
Difficulty level
Duration
based on 509 reviews
Rating in categories
Electrical Engineer
140
salaries
| ₹2.1 L/yr - ₹5 L/yr |
Engineer
86
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Senior Engineer
72
salaries
| ₹3.6 L/yr - ₹6.7 L/yr |
Assistant Manager
68
salaries
| ₹4.7 L/yr - ₹8.5 L/yr |
Junior Engineer
53
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Suzlon Group
Adani Power
Adani Group
Torrent Power