The development length for M25 concrete and Fe 500 steel is determined based on various factors.
Development length is the length of reinforcement required to transfer the stress between the concrete and steel.
It depends on the bond strength between concrete and steel, concrete cover, and the diameter of the steel bar.
For M25 concrete and Fe 500 steel, the development length can be calculated using empirical formulas or...
The slab shuttering removal time depends on various factors such as concrete strength, weather conditions, and type of formwork used.
The removal time can range from 3 days to 21 days depending on the above factors.
For normal concrete with temperature above 20°C, the removal time is usually 7 days.
For concrete with high early strength, the removal time can be reduced to 3 days.
In cold weather conditions, the removal tim...
Mortars used for tiles bed are cement-based and are used to fix tiles to the substrate.
Cement-based mortars are commonly used for tiles bed
They are used to fix tiles to the substrate
The mortar should be mixed with water to form a paste
The paste is then applied to the substrate using a notched trowel
Tiles are then placed onto the mortar and pressed firmly into place
The mortar should be allowed to dry and set before grou...
Top trending discussions
I applied via Company Website and was interviewed in Aug 2024. There were 3 interview rounds.
Plaster wall thickness 6mm slab bottom
12mm plaster smooth surface
Cube test after 7 day nd 14 day
Slump cone test true
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
I appeared for an interview in Feb 2025, where I was asked the following questions.
I worked as a Junior Engineer, focusing on project design, implementation, and team collaboration to enhance operational efficiency.
Collaborated with a team of engineers to design and implement a new water treatment system, improving efficiency by 20%.
Conducted regular maintenance checks on machinery, reducing downtime by 15% through proactive troubleshooting.
Assisted in the development of project documentation, ensuri...
based on 6 reviews
Rating in categories
Assistant Manager
25
salaries
| ₹4 L/yr - ₹7 L/yr |
Senior Accounts Executive
15
salaries
| ₹4 L/yr - ₹5.4 L/yr |
Civil Foreman
15
salaries
| ₹3.2 L/yr - ₹6.1 L/yr |
Senior Engineer
14
salaries
| ₹4.2 L/yr - ₹9.1 L/yr |
Assistant Accounts Manager
14
salaries
| ₹4.2 L/yr - ₹8 L/yr |
Knight Frank
R.S. Infraprojects
SMEC
BPTP