Filter interviews by
I appeared for an interview in Jan 2025.
I appeared for an interview in Oct 2024, where I was asked the following questions.
Effective management of office tasks during training involves organization, communication, and supervision of draftsmen.
Prioritization: I create a daily task list to prioritize urgent tasks, ensuring that critical deadlines are met without compromising quality.
Delegation: I assign specific tasks to draftsmen based on their strengths, such as design work to those with strong creative skills, enhancing productivity.
Regul...
Architectural drawings focus on aesthetics and layout, while structural work ensures safety and stability in construction.
Architectural drawings include floor plans, elevations, and sections that illustrate the design and layout of a building.
Structural work involves calculations and designs for beams, columns, and foundations to support the building's weight and resist forces.
Architects typically create architectural ...
Teamwork in architecture and structural fields involves collaboration among diverse professionals to achieve cohesive design and functionality.
Collaboration among architects, engineers, and contractors ensures all aspects of a project are aligned.
Regular meetings facilitate communication, allowing for the sharing of ideas and addressing challenges promptly.
Utilizing software tools like BIM (Building Information Modelin...
I applied via Govt and was interviewed in Aug 2024. There were 2 interview rounds.
Normal General Knowledge, Typing Test, Drafting Test,
No anything Major Group Discussion , It was friendly discussion
I appeared for an interview before Jun 2024, where I was asked the following questions.
Calculating foundation quantities involves measuring dimensions and applying formulas for volume and material estimation.
Identify the type of foundation (e.g., strip, pad, raft).
Measure the length, width, and depth of the foundation.
Use the formula: Volume = Length x Width x Depth.
Consider additional factors like excavation and backfill.
Example: For a strip foundation 10m long, 0.5m wide, and 1m deep, Volume = 10 x 0.5...
Billing checking involves verifying quantities against measurements to ensure accurate invoicing in construction projects.
Review the measurement sheets to ensure all quantities are accurately recorded.
Cross-check the billed amounts with the contract documents to confirm compliance.
Example: If 100 cubic meters of concrete is measured, ensure the bill reflects this quantity.
Verify unit rates applied in the bill against t...
I appeared for an interview before Jun 2024, where I was asked the following questions.
posted on 22 Sep 2021
I appeared for an interview before Dec 2019.
I applied via Employment News and was interviewed before Apr 2020. There were 3 interview rounds.
Top trending discussions
based on 10 interview experiences
Difficulty level
Duration
based on 283 reviews
Rating in categories
Junior Engineer
63
salaries
| ₹4.5 L/yr - ₹11.2 L/yr |
Junior Engineer Civil
37
salaries
| ₹7 L/yr - ₹12.3 L/yr |
Data Entry Operator
36
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
Electrician
21
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Junior Engineer Electrical
12
salaries
| ₹6 L/yr - ₹9.6 L/yr |
The Louis Berger Group
Al-Yamama Group
El Seif Engineering Contracting
Nesma & Partners