Upload Button Icon Add office photos

The Louis Berger Group

Compare button icon Compare button icon Compare

Filter interviews by

The Louis Berger Group Interview Questions and Answers

Updated 17 May 2025
Popular Designations

7 Interview questions

An Assistant Project Engineer was asked
Q. What is the full name of PTR?
Ans. 

PTR stands for Project Technical Report.

  • PTR is a document that summarizes the technical aspects of a project.

  • It includes details such as project scope, objectives, methodology, results, and conclusions.

  • PTRs are often used to communicate project progress and findings to stakeholders.

View all Assistant Project Engineer interview questions
An Assistant Project Engineer was asked
Q. What is the rule for line transmission pole erection?
Ans. 

LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.

  • LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.

  • It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.

  • Compliance with LT pole election rule ...

View all Assistant Project Engineer interview questions
A QS cum Contract Engineer was asked
Q. What is a contract?
Ans. 

A legally binding agreement between two or more parties that outlines the terms and conditions of a transaction or relationship.

  • Contract is a written or verbal agreement between parties

  • It outlines the terms and conditions of a transaction or relationship

  • It is legally binding and enforceable by law

  • Examples include employment contracts, rental agreements, and construction contracts

A QS cum Contract Engineer was asked
Q. What are types of Contract and Claims
Ans. 

Types of contracts include fixed-price, cost-reimbursable, and time and material. Claims can be for delay, disruption, or breach of contract.

  • Fixed-price contracts involve a set price for the project, regardless of actual costs.

  • Cost-reimbursable contracts involve the contractor being reimbursed for actual costs incurred, plus a fee.

  • Time and material contracts involve paying for the contractor's time and materials u...

An Assistant Project Engineer was asked 11mo ago
Q. Dtr & PSS structure of SLD.
Ans. 

Dtr & PSS structure of SLD refers to Distribution Transformer and Package Substation structure in Single Line Diagram.

  • Dtr stands for Distribution Transformer which is used to step down voltage for distribution purposes.

  • PSS stands for Package Substation which is a compact unit containing transformers, switchgear, and control equipment.

  • In a Single Line Diagram (SLD), Dtr and PSS are represented by symbols to show th...

View all Assistant Project Engineer interview questions
A Billing Engineer was asked
Q. Process of variation
Ans. 

Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

  • Variations are changes to the original scope, cost, or schedule of a project

  • Variations must be documented and approved by the relevant parties

  • The impact of variations on project budget and timeline must be analyzed

  • Examples of variations include design changes, unforeseen site conditions, and client requests

View all Billing Engineer interview questions
An Assistant Project Engineer was asked
Q. Five fit depth with coil earthing
Ans. 

Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.

  • Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.

  • The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.

  • Proper installation of coil earthing is essential to protect ...

View all Assistant Project Engineer interview questions
Are these interview questions helpful?

The Louis Berger Group Interview Experiences

16 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - HR 

(1 Question)

  • Q1. Introduction and Salary discussion
Round 2 - Technical 

(1 Question)

  • Q1. Technical skills, relevant code and standard practice

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have don't job then only go for this company. Job security is zero.

Intern Interview Questions & Answers

user image Anonymous

posted on 19 Oct 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Where are you from Tell me something about yourself.
  • Ans. 

    I am from a small town in the Midwest and I am passionate about environmental conservation.

    • I grew up in a close-knit community in the Midwest

    • I have always been interested in protecting the environment

    • I enjoy outdoor activities like hiking and gardening

  • Answered by AI
  • Q2. Tell me about education background
  • Ans. 

    I have a Bachelor's degree in Computer Science from XYZ University.

    • Bachelor's degree in Computer Science

    • Graduated from XYZ University

    • Specialized in software development

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was an excellent experience for me.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Dtr & PSS structure of SLD.
  • Ans. 

    Dtr & PSS structure of SLD refers to Distribution Transformer and Package Substation structure in Single Line Diagram.

    • Dtr stands for Distribution Transformer which is used to step down voltage for distribution purposes.

    • PSS stands for Package Substation which is a compact unit containing transformers, switchgear, and control equipment.

    • In a Single Line Diagram (SLD), Dtr and PSS are represented by symbols to show their l...

  • Answered by AI
  • Q2. Billing process
Round 2 - HR 

(2 Questions)

  • Q1. Salary dissuction
  • Q2. Work of experience
  • Ans. 

    I have diverse experience in project engineering, focusing on coordination, design, and execution of engineering projects.

    • Worked on a team to successfully complete a $2 million infrastructure project, ensuring timely delivery and adherence to budget.

    • Collaborated with architects and contractors to develop project specifications and timelines, improving efficiency by 15%.

    • Conducted site inspections and quality control che...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Project monitoring, supervison of quality works.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What is ptr full name
  • Ans. 

    PTR stands for Project Technical Report.

    • PTR is a document that summarizes the technical aspects of a project.

    • It includes details such as project scope, objectives, methodology, results, and conclusions.

    • PTRs are often used to communicate project progress and findings to stakeholders.

  • Answered by AI
  • Q2. What is lt pole election rull
  • Ans. 

    LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.

    • LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.

    • It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.

    • Compliance with LT pole election rule ensur...

  • Answered by AI
  • Q3. Power transmission research
  • Q4. Distribution tarnsfarma reserch
  • Q5. Five fit depth with coil earthing
  • Ans. 

    Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.

    • Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.

    • The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.

    • Proper installation of coil earthing is essential to protect equip...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

Interview Questions & Answers

user image Anonymous

posted on 6 Feb 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Willingness to relocate
Round 2 - One-on-one 

(1 Question)

  • Q1. About previous experience
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Why you want to switch
  • Ans. 

    I seek new challenges and opportunities for growth that align with my career goals and passion for structural engineering.

    • Desire to work on larger, more complex projects that can enhance my skills.

    • Looking for a company culture that promotes innovation and collaboration.

    • Aiming for career advancement opportunities that my current role does not provide.

    • Interest in working with advanced technologies and methodologies in st...

  • Answered by AI
  • Q2. What are your expertise
  • Ans. 

    I specialize in structural engineering, focusing on design, analysis, and project management for various construction projects.

    • Expert in structural analysis using software like SAP2000 and ETABS, ensuring designs meet safety standards.

    • Experience in designing reinforced concrete and steel structures, such as bridges and high-rise buildings.

    • Proficient in conducting site inspections and assessments to ensure compliance wi...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No value for real efforts, those who spent more time on aligning or pleasing senior management seem to advance faster than those who work really hard, seniors doesn't support for real talent,

Interview Questions & Answers

user image Anonymous

posted on 14 Feb 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. NATM Tunnel Construction
  • Q2. Quality control and Quality assurance in NATM Tunnel Construction related

Interview Questions & Answers

user image Anonymous

posted on 8 May 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is Contract
  • Ans. 

    A legally binding agreement between two or more parties that outlines the terms and conditions of a transaction or relationship.

    • Contract is a written or verbal agreement between parties

    • It outlines the terms and conditions of a transaction or relationship

    • It is legally binding and enforceable by law

    • Examples include employment contracts, rental agreements, and construction contracts

  • Answered by AI
  • Q2. What are types of Contract and Claims
  • Ans. 

    Types of contracts include fixed-price, cost-reimbursable, and time and material. Claims can be for delay, disruption, or breach of contract.

    • Fixed-price contracts involve a set price for the project, regardless of actual costs.

    • Cost-reimbursable contracts involve the contractor being reimbursed for actual costs incurred, plus a fee.

    • Time and material contracts involve paying for the contractor's time and materials used.

    • C...

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
6d
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about The Louis Berger Group?
Ask anonymously on communities.

The Louis Berger Group Interview FAQs

How many rounds are there in The Louis Berger Group interview?
The Louis Berger Group interview process usually has 2 rounds. The most common rounds in the The Louis Berger Group interview process are Technical, One-on-one Round and Resume Shortlist.
How to prepare for The Louis Berger Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at The Louis Berger Group. The most common topics and skills that interviewers at The Louis Berger Group expect are Metro Rail, Civil Engineering, Metro, Design Review and Railways.
What are the top questions asked in The Louis Berger Group interview?

Some of the top questions asked at the The Louis Berger Group interview -

  1. What is Contract Agreement? What is FIDIC Contract? What is EPC Contra...read more
  2. Are you familiar with Specifications? What is BIS, ASTM, BS and Good Industria...read more
  3. Do you have any idea about Static Load Test and Dynamic Load Te...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 13 interview experiences

Difficulty level

Easy 33%
Moderate 67%

Duration

Less than 2 weeks 33%
2-4 weeks 50%
More than 8 weeks 17%
View more

The Louis Berger Group Reviews and Ratings

based on 259 reviews

4.3/5

Rating in categories

3.9

Skill development

4.3

Work-life balance

4.1

Salary

3.6

Job security

4.1

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 259 Reviews and Ratings
Section Engineer
18 salaries
unlock blur

₹8.6 L/yr - ₹12.5 L/yr

Site Engineer
17 salaries
unlock blur

₹4.5 L/yr - ₹10 L/yr

Civil Inspector
17 salaries
unlock blur

₹6.3 L/yr - ₹9.6 L/yr

Bridge Design Engineer
15 salaries
unlock blur

₹11 L/yr - ₹23 L/yr

Bridge Engineer
13 salaries
unlock blur

₹8.4 L/yr - ₹21 L/yr

Explore more salaries
Compare The Louis Berger Group with

Military Engineer Services

4.4
Compare

Al-Yamama Group

3.6
Compare

Nesma & Partners

4.3
Compare

El Seif Engineering Contracting

4.2
Compare
write
Share an Interview