Filter interviews by
I appeared for an interview in Jun 2025, where I was asked the following questions.
Pipe conveyors are enclosed systems for transporting bulk materials, emphasizing safety and efficiency.
Pipe conveyors consist of a series of pipes that transport materials in a closed system, reducing dust and spillage.
Safety equipment includes emergency stop buttons, belt misalignment sensors, and fire suppression systems.
Regular maintenance checks are crucial to ensure the integrity of the conveyor and its safety fea...
I have a solid understanding of SAP systems and safety protocols for electrical equipment, including hazard identification and risk management.
SAP (Systems, Applications, and Products) is used for managing business operations and customer relations.
Familiar with SAP modules relevant to engineering, such as SAP PM (Plant Maintenance) for equipment management.
Safety protocols include Lockout/Tagout (LOTO) procedures to e...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
posted on 4 May 2019
To design busbar for increased fault level but same current rating, increase the cross-sectional area of the busbar.
Increase the thickness of the busbar
Increase the width of the busbar
Use materials with higher conductivity
Use busbar supports with higher short-circuit strength
Consider the temperature rise of the busbar
Perform a fault level calculation to determine the required cross-sectional area
3-phase motor starters control the starting and stopping of motors, ensuring safe operation and protection from overloads.
Types of starters include Direct-On-Line (DOL), Star-Delta, and Soft Starters.
DOL starters are simple and used for small motors, providing full voltage at startup.
Star-Delta starters reduce starting current by initially connecting the motor in a star configuration.
Soft starters gradually increase vo...
The bending radius for HT cables varies depending on the cable type and size.
The bending radius for XLPE cables is typically 12 times the cable diameter.
For PILC cables, the bending radius is usually 20 times the cable diameter.
The bending radius for EPR cables is generally 10 times the cable diameter.
It is important to follow the manufacturer's recommendations for bending radius to avoid damaging the cable.
Bending rad...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
posted on 3 Jul 2021
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
based on 1 interview experience
Difficulty level
Duration
based on 4 reviews
Rating in categories
Mechanical Engineer
35
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Electrical Engineer
18
salaries
| ₹2.5 L/yr - ₹6.3 L/yr |
Safety Officer
17
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Instrument Engineer
11
salaries
| ₹3 L/yr - ₹5 L/yr |
HR Executive
11
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
L&T Construction
Simplex Infrastructures
L&T Energy Hydrocarbon
AECOM