Filter interviews by
Technical, legal and statutory requirements of a boiler
Technical requirements include proper installation, maintenance, and operation of the boiler
Legal requirements include obtaining necessary permits and complying with safety regulations
Statutory requirements include regular inspections and adherence to industry standards
Examples of technical requirements include proper ventilation and fuel supply
Examples of legal re...
IBR recommends various measures for safe running of boilers.
Regular inspection and maintenance of the boiler
Ensuring proper water level and pressure
Using high-quality fuel and maintaining proper combustion
Regular cleaning of the boiler and its components
Following safety guidelines and procedures
Training and certification of boiler operators
Maintaining proper records and documentation
ARC stands for Adaptive Replacement Cache. It is used for efficient caching of data in computer systems.
ARC is a caching algorithm used in computer systems to improve performance.
It is designed to adapt to changing workloads and optimize cache usage.
ARC maintains two lists, one for recently used items and another for frequently used items.
It dynamically adjusts the size of each list based on the workload.
ARC is used in...
Top trending discussions
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
The Deputy Manager oversees operations, supports management, and ensures team efficiency and productivity.
Assist in strategic planning and decision-making processes.
Supervise daily operations to ensure efficiency and quality.
Manage team performance through regular feedback and training.
Coordinate with other departments to align goals and objectives.
Handle budgeting and resource allocation effectively.
CBR requirement of soil is a measure of its strength and ability to support heavy loads.
CBR stands for California Bearing Ratio.
It is a measure of the strength of a soil to support loads applied to it.
Higher CBR values indicate stronger soil.
CBR values are used in designing pavement structures.
Different types of soil have different CBR requirements.
I applied via Naukri.com
posted on 31 Jul 2024
My father is a retired government official who served in the education department. We live in a peaceful neighborhood in the suburbs.
My father is a retired government official
He worked in the education department
We live in a peaceful neighborhood in the suburbs
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 3 interview rounds.
Last assignment in etp, control parameters.
Utilizing the water after using.best way to reduce effluent.
I appeared for an interview in May 2025, where I was asked the following questions.
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
About store procedures and systems
Planning in inventory management involves forecasting demand, setting inventory levels, and replenishing stock.
Forecasting demand based on historical sales data and market trends
Setting inventory levels to balance customer demand and cost of holding inventory
Replenishing stock in a timely manner to avoid stockouts and overstocking
Using inventory management software to track inventory levels and automate replenishment
Re...
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
Mechanical Engineer
35
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Electrical Engineer
18
salaries
| ₹2.5 L/yr - ₹6.3 L/yr |
Safety Officer
17
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Instrument Engineer
11
salaries
| ₹3 L/yr - ₹5 L/yr |
HR Executive
11
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
L&T Construction
Simplex Infrastructures
L&T Energy Hydrocarbon
AECOM