An Executive Director water and waste water was asked 3mo ago
Q. How is a project declared a national project?
Ans. 

A project is declared a national project based on its significance, funding, and impact on public welfare.

  • National significance: The project addresses critical issues like water scarcity or pollution.

  • Government endorsement: Requires approval from national authorities or ministries.

  • Funding allocation: Secured funding from national budgets or international grants.

  • Public impact: Demonstrates potential to improve publ...

An Executive Director water and waste water was asked 3mo ago
Q. Please explain the work you have completed.
Ans. 

I have successfully managed multiple water and wastewater projects, enhancing efficiency and sustainability.

  • Led a $10 million wastewater treatment plant upgrade, increasing capacity by 30%.

  • Implemented a water conservation program that reduced consumption by 15% in urban areas.

  • Oversaw the construction of a new water distribution system serving 50,000 residents.

  • Developed a comprehensive maintenance plan that decreas...

A General Manager Business Development was asked
Q. What are the problems with irrigation projects?
Ans. 

Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.

  • Water scarcity leading to insufficient supply for irrigation needs

  • Inefficient water distribution systems causing uneven water distribution

  • Environmental impact such as soil salinization and water pollution

  • Maintenance issues like clogging of irrigation channels or equipment breakd...

View all General Manager Business Development interview questions
An Associate Consultant(Electrical) was asked
Q. At what distance from the center line of roads with different pavement widths should transmission lines be laid?
Ans. 

Transmission lines should be laid at a distance from the centre line of roads based on pavement width to ensure safety and efficiency.

  • Transmission lines should be laid at a distance that allows for safe maintenance and operation without interfering with road traffic.

  • For roads with narrow pavement width, transmission lines should be placed further away from the centre line to avoid potential hazards.

  • In contrast, fo...

An Executive Director water and waste water was asked 3mo ago
Q. What about ken betwa link
Ans. 

The Ken-Betwa Link Project aims to provide irrigation and drinking water through interlinking rivers in India.

  • The project involves the interlinking of the Ken and Betwa rivers to enhance water availability.

  • It aims to irrigate around 1.5 million hectares of agricultural land in Madhya Pradesh.

  • The project is expected to provide drinking water to over 62 lakh people in the Bundelkhand region.

  • Environmental concerns in...

A General Manager Business Development was asked
Q. Works which I had complited in nwda
Ans. 

I have completed various projects at NWDA related to business development.

  • Developed new business strategies to increase revenue

  • Identified potential clients and formed partnerships

  • Analyzed market trends and competitor activities

  • Implemented marketing campaigns to promote products/services

View all General Manager Business Development interview questions
Be interview-ready. Browse the most asked HR questions.
illustration image
A General Manager Business Development was asked
Q. Area of exposure in the present irrigation projects
Ans. 

Currently involved in large-scale irrigation projects in rural areas

  • Implementing drip irrigation systems to conserve water

  • Utilizing solar-powered pumps for efficient water distribution

  • Working with local communities to educate on sustainable irrigation practices

View all General Manager Business Development interview questions
Are these interview questions helpful?

MSV International Interview Experiences

10 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Works which I had complited in nwda
  • Ans. 

    I have completed various projects at NWDA related to business development.

    • Developed new business strategies to increase revenue

    • Identified potential clients and formed partnerships

    • Analyzed market trends and competitor activities

    • Implemented marketing campaigns to promote products/services

  • Answered by AI
  • Q2. Details of each work complited by me
  • Q3. Tendering and costing
  • Q4. What is the problems of irrigation projects
  • Ans. 

    Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.

    • Water scarcity leading to insufficient supply for irrigation needs

    • Inefficient water distribution systems causing uneven water distribution

    • Environmental impact such as soil salinization and water pollution

    • Maintenance issues like clogging of irrigation channels or equipment breakdowns

  • Answered by AI
  • Q5. What is the latest model for solvingsewarge and drainage problem
  • Ans. 

    The latest model for solving sewage and drainage problems involves implementing green infrastructure solutions such as rain gardens and permeable pavement.

    • Green infrastructure solutions help manage stormwater runoff by allowing water to infiltrate into the ground instead of overwhelming sewer systems.

    • Examples of green infrastructure include rain gardens, bioswales, permeable pavement, and green roofs.

    • These solutions ca...

  • Answered by AI
  • Q6. Area of exposure in the present irrigation projects
  • Ans. 

    Currently involved in large-scale irrigation projects in rural areas

    • Implementing drip irrigation systems to conserve water

    • Utilizing solar-powered pumps for efficient water distribution

    • Working with local communities to educate on sustainable irrigation practices

  • Answered by AI

Interview Preparation Tips

Topics to prepare for MSV International General Manager Business Development interview:
  • About the field of expertise
Interview preparation tips for other job seekers - Be complete in your resume
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. About my past job
  • Q2. About interlinking
  • Q3. Comand area related details
  • Q4. Domestik water related details
  • Q5. Drainage works related works details

Interview Preparation Tips

Interview preparation tips for other job seekers - I will sugest to first discuss time frame of job

Legal Expert Interview Questions & Answers

user image Nirmal Kumar

posted on 30 Apr 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
  • Q1. Asking about your past experience
  • Q2. Related to your previous experience

Interview Questions & Answers

user image Anonymous

posted on 6 Apr 2025

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Pl explain your total works complited
  • Ans. 

    I have successfully managed multiple water and wastewater projects, enhancing efficiency and sustainability.

    • Led a $10 million wastewater treatment plant upgrade, increasing capacity by 30%.

    • Implemented a water conservation program that reduced consumption by 15% in urban areas.

    • Oversaw the construction of a new water distribution system serving 50,000 residents.

    • Developed a comprehensive maintenance plan that decreased do...

  • Answered by AI
  • Q2. What about ken betwa link
  • Ans. 

    The Ken-Betwa Link Project aims to provide irrigation and drinking water through interlinking rivers in India.

    • The project involves the interlinking of the Ken and Betwa rivers to enhance water availability.

    • It aims to irrigate around 1.5 million hectares of agricultural land in Madhya Pradesh.

    • The project is expected to provide drinking water to over 62 lakh people in the Bundelkhand region.

    • Environmental concerns include...

  • Answered by AI
  • Q3. How a prohlhect declsred a national project
  • Ans. 

    A project is declared a national project based on its significance, funding, and impact on public welfare.

    • National significance: The project addresses critical issues like water scarcity or pollution.

    • Government endorsement: Requires approval from national authorities or ministries.

    • Funding allocation: Secured funding from national budgets or international grants.

    • Public impact: Demonstrates potential to improve public he...

  • Answered by AI
  • Q4. How msny projects are nstionsl so far

Interview Preparation Tips

Interview preparation tips for other job seekers - I will sugest not to join such comny
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Work in last service period with presentation about the work
  • Q2. Project report complited by me during service period
  • Ans. 

    I have completed multiple project reports during my service period.

    • Led a team to compile and analyze data for a quarterly project report

    • Implemented new reporting tools to streamline the process and improve accuracy

    • Presented findings to senior management and stakeholders for decision-making

    • Ensured all reports were completed on time and met quality standards

  • Answered by AI
Round 2 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - First ensure job safty security then join this comny they are only busness oriented
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Case Study 

Over all performance

Round 2 - Assignment 

Project work related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sincere, honest and punctual to work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. How many years of experience do you have in the relevant field?
  • Q2. All about the work related subject.

Interview Questions & Answers

user image Anonymous

posted on 24 Jun 2022

I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Field realated Higway and Re wall
Round 3 - Technical 

(1 Question)

  • Q1. Explanation to BC DBM

Interview Preparation Tips

Interview preparation tips for other job seekers - Assistant Higway engineer (Sugrade ,GSB,WMM

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. About GSB grades,SDBC

Interview Questions & Answers

user image Anonymous

posted on 26 Apr 2020

I applied via Recruitment Consultant and was interviewed before Apr 2019. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is Ground clearance of overhead transmission line for different voltages like 440 Volt, 11 KV, 33KV, 132 KV etc ?
  • Q2. At what distance from centre line of roads having different pavement-width, transmission lines should be laid?
  • Ans. 

    Transmission lines should be laid at a distance from the centre line of roads based on pavement width to ensure safety and efficiency.

    • Transmission lines should be laid at a distance that allows for safe maintenance and operation without interfering with road traffic.

    • For roads with narrow pavement width, transmission lines should be placed further away from the centre line to avoid potential hazards.

    • In contrast, for roa...

  • Answered by AI
  • Q3. Which type of safety precautions you should apply while erecting overhead transmission line of different voltages ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Candidate should reply boldly with full confidence. He needs to stay calm and should apply presence of mind.

Top trending discussions

View All
Interview Hub
1w
a team lead
FeedCard Image
Got a question about MSV International?
Ask anonymously on communities.

MSV International Interview FAQs

How many rounds are there in MSV International interview?
MSV International interview process usually has 2 rounds. The most common rounds in the MSV International interview process are HR, Technical and Resume Shortlist.
How to prepare for MSV International interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at MSV International. The most common topics and skills that interviewers at MSV International expect are Civil Engineering, Construction, Inspection, Communication Skills and Construction Management.
What are the top questions asked in MSV International interview?

Some of the top questions asked at the MSV International interview -

  1. What is Ground clearance of overhead transmission line for different voltages l...read more
  2. Which type of safety precautions you should apply while erecting overhead trans...read more
  3. At what distance from centre line of roads having different pavement-width, tra...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.4/5

based on 16 interview experiences

Difficulty level

Easy 50%
Moderate 50%

Duration

Less than 2 weeks 100%
View more

MSV International Reviews and Ratings

based on 144 reviews

3.8/5

Rating in categories

3.3

Skill development

3.7

Work-life balance

3.4

Salary

3.4

Job security

3.5

Company culture

3.1

Promotions

3.5

Work satisfaction

Explore 144 Reviews and Ratings
Bridge/Structural Engineer

Kolkata,

Mumbai

+5

1-4 Yrs

Not Disclosed

Senior Pavement Specialist

Kolkata,

Mumbai

+5

2-3 Yrs

Not Disclosed

Bridge/Structural Engineer

Kolkata,

Mumbai

+5

2-5 Yrs

Not Disclosed

Explore more jobs
Quantity Surveyor
24 salaries
unlock blur

₹3.6 L/yr - ₹7.3 L/yr

Assistant Highway Engineer
22 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Assistant Bridge Engineer
14 salaries
unlock blur

₹3.6 L/yr - ₹7.2 L/yr

Field Engineer
12 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Civil Site Engineer
11 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare MSV International with

GAMMON INDIA

3.7
Compare

McNally Bharat Engineering

4.0
Compare

ABCI Infrastructures

3.4
Compare

VIKRAN Engineering & Exim

4.0
Compare
write
Share an Interview